Buildings and Facilities19FB0025

LOCAL PROGRAM: CONSTRUCTION OF BARANGAY PERMANENT EVACUATION HOLDING CENTER, BRGY. KIWALO, DARAGA, ALBAY

LOCAL PROGRAM: CONSTRUCTION OF BARANGAY PERMANENT EVACUATION HOLDING CENTER, BRGY. KIWALO, DARAGA, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱4,897,703.89. Status: Reported complete (DPWH). Contractor on record: ANKOR GAULLE CONST AND SUPPLY CORP. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROXI-19-0019722 · ₱241,576 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱4,897,704 · ANKOR GAULLE CONSTRUCTION AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-04 → 2023-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM: CONSTRUCTION OF BARANGAY PERMANENT EVACUATION HOLDING CENTER, BRGY. KIWALO, DARAGA, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-19-0019722

₱241,576.00 · FY2019

Released to Division of Davao del Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

LIP - Const. of MPB Brgy. Kiwalo, Daraga, Albay

₱4,897,703.89 · ANKOR GAULLE CONSTRUCTION AND SUPPLY

Award / contract ref: 19FB0025

Contractor

B

35 projects · ₱717.5M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (LZ)-K0516+596-K0518+809, K0521+128-K0522+434, CAMALIG-DARA

Region V, Region V

2024₱113.1M
Past target date (DPWH On-Going)

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES, CONSTRUCTION/REHABILITATION OF BONGA FLOOD CONTROL SYSTEM, LEGAZPI CITY, ALBAY,

Region V, Region V

2020₱112.2M
Reported complete (DPWH)
No sat.

REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -  SECONDARY ROADS LEGAZPI CITY-PUNTA DE JESUS RD - K0560 + 440 - K0560 + 760

Albay 2nd DEO, Region V

2021₱36.3M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LEGAZPI CITY-PUNTA DE JESUS RD - K0561+000 - K0562+000

Albay 2nd DEO, Region V

2024₱29.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/REHABILITATION OF SALVACION-MIISI FLOOD CONTROL SYSTEM, DARAGA, ALBAY

Albay 2nd DEO, Region V

2021₱29.4M
Reported complete (DPWH)
No sat.

Construction of Cagsawa Ruins Protection Dike, (Tributary "F"), Daraga, Albay

ALBAY, Region V

2021₱29.4M
Reported complete (DPWH)
View all 35 projects →

4. Implementation

Contract Amount

₱4,897,703.89

Progress

Reported complete (DPWH)

Start Date

May 23, 2019

Target End

September 19, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayDaragaMalabog
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.