Buildings and Facilities19JC0013

CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. MANGOP, BACUNGAN (LEON B. POSTIGO), ZAMBOANGA DEL NORTE

CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. MANGOP, BACUNGAN (LEON B. POSTIGO), ZAMBOANGA DEL NORTE is a DPWH-tracked public work in Zamboanga del Norte 3rd DEO, Region IX. Reported contract value: ₱3,731,832.40. Status: Reported complete (DPWH). Contractor on record: SEVERS CONST. Figures trace to dpwh.

Zamboanga del Norte 3rd DEO, Region IX
Region: Region IX

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-C-19-0011919 · ₱716,783 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19JC0013 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-01 → 2025-04-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. MANGOP, BACUNGAN (LEON B. POSTIGO), ZAMBOANGA DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-C-19-0011919

₱716,783.00 · FY2019

Released to Zamboanga del Norte 3rd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

63 projects · ₱828.0M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING (LGU HOTEL) BRGY. 6, DAPA, SURIGAO DEL NORTE

Surigao del Norte 1st DEO, Region XIII

2023₱79.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING (SIARGAO CLIMATE FIELD SCHOOL OF SURIGAO DEL NORTE STATE UNIVERSITY) - DEL CARMEN CAMPUS, BRGY. SAN JOSE, DEL CARMEN, SIARGAO ISLAND, SURIGAO DEL NORTE

Surigao del Norte 1st DEO, Region XIII

2025₱49.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT DINAS RIVER ALONG ZAMBOANGA DEL SUR COASTAL RD (S01168MN) AND GUINICULALAY BR., BARANGAY OLD MIRAPAO, DINAS, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2025₱48.9M
Past target date (DPWH On-Going)
No sat.

ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION - BARANGAY PANUBIGAN - BARANGAY LOWER PANIKI-AN - BARANGAY PUNTA FLECHA - BARANGAY LIMBAYAN, PITOGO, ZD

Zamboanga del Sur 2nd DEO, Region IX

2025₱48.9M
Past target date (DPWH On-Going)
No sat.

ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY LEGARDA - BARANGAY LEGARDA 3 - BARANGAY IGNACIO GARRATA, DINAS, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2025₱40.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAPA, SURIGAO DEL NORTE (PHASE 2)

Surigao del Norte 1st DEO, Region XIII

2024₱39.6M
Reported complete (DPWH)
View all 63 projects →

4. Implementation

Contract Amount

₱3,731,832.40

Progress

Reported complete (DPWH)

Start Date

June 10, 2019

Target End

December 26, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga del NorteLeon T. PostigoMangop
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.