Roads19IC0002

NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS, PALO-CARIGARA-ORMOC ROAD (S00034LT) K0917+795 - K0918+757, PALO, LEYTE

NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS, PALO-CARIGARA-ORMOC ROAD (S00034LT) K0917+795 - K0918+757, PALO, LEYTE is a DPWH-tracked public work in Leyte 1st DEO, Region VIII. Reported contract value: ₱31,392,752.45. Status: Reported complete (DPWH). Contractor on record: UNIMASTERS CONGLOMERATION INC. Figures trace to dpwh.

Leyte 1st DEO, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROV-19-0025892 · ₱56,648 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱31,392,752 · UNIMASTERS CONGLOMERATION INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-20 → 2025-11-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱32,632,799 per km= 1.0x the Region VIII median (n=337)

Contract cost ₱31,392,752 ÷ 0.962 km read from the DPWH title (“K0917+795 - K0918+757”; K-post / station range length). National percentile: 46. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS, PALO-CARIGARA-ORMOC ROAD (S00034LT) K0917+795 - K0918+757, PALO, LEYTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROV-19-0025892

₱56,648.00 · FY2019

Released to Donsol National Comprehensive High Scho (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CID No. 19IC0002

₱31,392,752.45 · UNIMASTERS CONGLOMERATION INC

Award / contract ref: 19IC0002

Contractor

A

50 projects · ₱2.3B total · 0 flags

Other projects by this contractor

No sat.

ROAD WIDENING - PRIMARY ROADS - PALO - CARIGARA - ORMOC ROAD - KO975+061 - KO975+788, KO975+832.20 - KO980+372, KO982+186 - KO983+255, KO940+454 - KO940+895, LEYTE 2ND LD

Region VIII, Region VIII

2018₱165.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASSES ROAD, INCLUDING ROW NRJ DAANG MAHARLIKA, TAGUIBO-MASAO PORT, (CABCABON-BANZA SECTION), BUTUAN CITY, AGUSAN DEL NORTE 1ST LD., BUTUAN CITY, AGUSAN DEL NORTE 1ST LD.

Region XIII, Region XIII

2016₱140.3M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD. - K0953+466 - K0954+288, K0954+299 - K0955+000, K0955+000 - K0955+344, K0955+357 - K0956+233, CARIGARA, LEYTE 2ND LD

Region VIII, Region VIII

2020₱122.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN FRANCISCO (NRJ HUBANG - STA. ANA - SAN ISIDRO) BYPASS ROAD (DAANG MAHARLIKA ALTERNATE ROUTE), INCLUDING ROW AND BRIDGE, SAN FRANCISCO, AGUSAN DEL SUR

Region XIII, Region XIII

2018₱119.8M
Reported complete (DPWH)
No sat.

IMPROVEMENT/WIDENING OF NATIONAL ROADS, DAANG MAHARLIKA (SURIGAO-AGUSAN SECT.), K1197+550-K1199+289.40, K1202+000-K1202+812.46, K1202+911.75-K1203+238, AGUSAN DEL NORTE

Region XIII, Region XIII

2017₱102.3M
Reported complete (DPWH)

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF DIKE WITH CONCRETE REVETMENT ALONG PANDANON - MAGALLANES ROAD, AGUSAN DEL NORTE

Agusan del Norte DEO, Region XIII

2020₱96.5M
Reported complete (DPWH)
View all 50 projects →

4. Implementation

Contract Amount

₱31,392,752.45

Progress

Reported complete (DPWH)

Start Date

May 30, 2019

Target End

February 25, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeytePaloLibertad
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.