Buildings and Facilities17DK0088

CONSTRUCTION OF ONE(1) STOREY TWO(2) CLASSROOM SCHOOL BUILDING @ DOÑA AURORA ELEMENTARY SCHOOL, MAUBAN, QUEZON

CONSTRUCTION OF ONE(1) STOREY TWO(2) CLASSROOM SCHOOL BUILDING @ DOÑA AURORA ELEMENTARY SCHOOL, MAUBAN, QUEZON is a DPWH-tracked public work in Quezon 1st DEO, Region IV-A. Reported contract value: ₱2,891,807.90. Status: Reported complete (DPWH). Contractor on record: W J CONST OPC FORMERLY: W J CONST. Figures trace to dpwh.

Quezon 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0021010 · ₱300,000,000 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17DK0088 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-04-19 → 2020-09-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ONE(1) STOREY TWO(2) CLASSROOM  SCHOOL BUILDING @ DOÑA AURORA ELEMENTARY  SCHOOL, MAUBAN, QUEZON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Maapon River Flood Control Project, Brgy. Barrio Lual, Mauban, Quezon
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0021010

₱300,000,000.00 · FY2017

Released to Regional Field Unit - V (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

80 projects · ₱1.6B total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS ATIMONAN-MAUBAN ROAD (MAUBAN SIDE) INCLUDING ROW AND SLOPE PROTECTION, MAUBAN, QUEZON

Quezon 1st DEO, Region IV-A

2018₱85.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - JCT MSR CALUMPANG - TAYABAS ROAD LEADING TO MINOR BASILICA OF ST. MICHAEL DE ARCHANGEL, AND KAMAY NI HEHESUS, TAYABAS, QUEZON

Quezon 1st DEO, Region IV-A

2022₱72.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM CONST OF BYPASS AND DIVERSION ROADPAGBILAO TAYABAS LUCBAN DIVERSION ROAD (LUCBAN SECTION) PACKAGE A, QUEZON, LUCBAN, QUEZON

Quezon 1st DEO, Region IV-A

2024₱72.4M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PAGBILAO-TAYABAS-LUCBAN DIVERSION ROAD (LUCBAN SECTION), QUEZON

Quezon 1st DEO, Region IV-A

2025₱60.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LUCBAN DIVERSION ROAD, PACKAGE A, QUEZON

Quezon 1st DEO, Region IV-A

2022₱58.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINKS/NEW ROADS PAGBILAO-TAYABAS-LUCBAN DIVERSION ROAD (TAYABAS SIDE), PACKAGE B, QUEZON

Quezon 1st DEO, Region IV-A

2021₱57.9M
Reported complete (DPWH)
View all 80 projects →

4. Implementation

Contract Amount

₱2,891,807.90

Progress

Reported complete (DPWH)

Start Date

October 9, 2017

Target End

March 2, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonMaubanRizaliana
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.