Buildings and Facilities24CJ0302

CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN BURGOS INTEGRATED SCHOOL, BARANGAY BURGOS, SAN JOSE, TARLAC

CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN BURGOS INTEGRATED SCHOOL, BARANGAY BURGOS, SAN JOSE, TARLAC is a DPWH-tracked public work in Tarlac DEO, Region III. Reported contract value: ₱4,924,815.81. Status: Reported complete (DPWH). Contractor on record: SLAMPJAM CONST. Figures trace to dpwh.

Tarlac DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24CJ0302 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-02-10 → 2025-02-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN BURGOS INTEGRATED SCHOOL, BARANGAY BURGOS, SAN JOSE, TARLAC

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Costruction of Flood Control Structure, 1st Phase, Barangay Sta. Maria, San Manuel, Tarlac
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Tarlac DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱4,924,815.81

Progress

Reported complete (DPWH)

Start Date

April 11, 2024

Target End

July 9, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)TarlacSan JoseBurgos
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.