Roads23PE0032

CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG CONG. ANDRES ACOP COSALAN RD (S00379LZ) - K0333+2332 - K0333+2406, KABAYAN, BENGUET

CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG CONG. ANDRES ACOP COSALAN RD (S00379LZ) - K0333+2332 - K0333+2406, KABAYAN, BENGUET is a DPWH-tracked public work in Benguet 1st DEO, Cordillera Administrative Region. Reported contract value: ₱14,650,912.84. Status: Reported complete (DPWH). Contractor on record: ALMOND ENGINEERING. Figures trace to dpwh.

Benguet 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱14,650,913 · ALMOND ENGINEERING AND CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-02-10 → 2023-02-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG CONG. ANDRES ACOP COSALAN RD (S00379LZ) - K0333+2332 - K0333+2406, KABAYAN, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2023 GAA. DBM GAA FY2023

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of Road Slope Protection

₱14,650,912.84 · ALMOND ENGINEERING AND CONSTRUCTION

Award / contract ref: 23PE0032

Contractor

C

28 projects · ₱302.0M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER LAMAGAN TO GUEDAY SECTION, STA. 8+366 - STA. 8+966 (BS), BUGUIAS, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2025₱48.4M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), LA TRINIDAD, BENGUET (PHASE 1)

Benguet 1st DEO, Cordillera Administrative Region

2023₱29.7M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE ROAD-BAGUIO-BONTOC ROAD JCT. TO BATAN-ADAOAY, KABAYAN, KABAYAN ROAD IN SUPPORT OF VEGETABLE, PROCESSED TEA AND COFFEE INDUSTRY, KABAYAN, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2021₱23.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MITIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, PACSO SECTION, KABAYAN, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2020₱19.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE ROAD-BAGUIO-BONTOC ROAD JCT. TO BATAN-ADAOAY, KABAYAN ROAD IN SUPPORT OF VEGETABLE, PROCESSED TEA AND COFFEE INDUSTRY, KABAYAN, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2022₱17.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG CONG. ANDRES ACOP COSALAN RD, K0312+700-K0312+730, K0313+340-K0313+370, K0314+200-K0314+210, K0316+987-K0317+000, K0319+140-K0319+200, K0319+266-K0319+300, K0319+1252-K0319+1265, K0319+1850-K0319+1855,

Benguet 1st DEO, Cordillera Administrative Region

2022₱15.3M
Reported complete (DPWH)
View all 28 projects →

4. Implementation

Contract Amount

₱14,650,912.84

Progress

Reported complete (DPWH)

Start Date

April 4, 2023

Target End

October 26, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetKabayanKabayan Barrio
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultFlood (100-yr rain)LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.