Buildings and Facilities16IG0075No coordinates published by DPWH

CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOMS SCHOOL BUILDING, BAYBAY CITY NATIONAL NIGHT HS, BAYBAY CITY, LEYTE

CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOMS SCHOOL BUILDING, BAYBAY CITY NATIONAL NIGHT HS, BAYBAY CITY, LEYTE is a DPWH-tracked public work in Leyte 5th DEO, Region VIII. Reported contract value: ₱6,350,194.70. Status: Reported complete (DPWH). Contractor on record: LADY OF ASSUMPTION ENT INC FORMERLY: LADY OF ASSUMPTION ENT. Figures trace to dpwh.

Leyte 5th DEO, Region VIII

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region VIII

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVI-16-0037057 · ₱185,000 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16IG0075 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,587,549 per classroom= 1.0x the Region VIII median (n=172)

Contract cost ₱6,350,195 ÷ 4 classroom read from the DPWH title (“FOUR (4) CLASSROOMS”; classroom count in title). National percentile: 45. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOMS SCHOOL BUILDING, BAYBAY CITY NATIONAL NIGHT HS, BAYBAY CITY, LEYTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Rehabilitation of Baybay City Flood Control Structures, Baybay City, Leyte 5th LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-16-0037057

₱185,000.00 · FY2016

Released to Don Esteban S. Javellana National High School Re (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

77 projects · ₱2.9B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX), TAM-IS, MAASIN CITY, SOUTHERN L

Southern Leyte 1st DEO, Region VIII

2022₱241.1M
Reported complete (100% progress, DPWH status On-Going)

CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 5+640 - STATION 6+080, SECTION 5 PHASE 13, BRGY. CALOGCOG, TANAUAN, LEYTE

Region VIII, Region VIII

2018₱147.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, JCT. ABUYOG - SILAGO ROAD - CADAC-AN - MALAGUICAY ROAD LEADING TO MALAGUICAY FALLS, ABUYOG, LEYTE 5TH LD

Region VIII, Region VIII

2018₱139.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS JCT. ABUYOG - SILAGO ROAD - CADAC-AN - MALAGUICAY ROAD LEADING TO MALAGUICAY FALLS, ABUYOG, LEYTE

Region VIII, Region VIII

2020₱120.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, JCT. HIMAY-ANGAN - SILAGO - ABUYOG BDRY. RD. - K1063+000 - K1068+601, SOUTHERN LEYTE

Region VIII, Region VIII

2020₱97.0M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BDRY SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA - K1124+(-925) - K1125+581

Southern Leyte 1st DEO, Region VIII

2024₱96.5M
Reported complete (100% progress, DPWH status On-Going)
View all 77 projects →

4. Implementation

Contract Amount

₱6,350,194.70

Progress

Reported complete (DPWH)

Start Date

March 7, 2017

Target End

August 3, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)Leyte
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.