Roads24A00476

PREVENTIVE MAINTENANCE- PRIMARY ROADS, MANILA NORTH RD - K0564 + 003 - K0564 + 190, K0564+737 - K0565 + 002

PREVENTIVE MAINTENANCE- PRIMARY ROADS, MANILA NORTH RD - K0564 + 003 - K0564 + 190, K0564+737 - K0565 + 002 is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱4,741,038.54. Status: Reported complete (DPWH). Contractor on record: IGWT-JAV CONST & DEVELOPMENT CORP. Figures trace to dpwh.

Region I, Region I
Region: Region I

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24A00476 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-11-05 → 2024-12-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱10,489,023 per km= 0.7x the Region I median (n=184)

Contract cost ₱4,741,039 ÷ 0.452 km read from the DPWH title (“K0564 + 003 - K0564 + 190; K0564+737 - K0565 + 002”; K-post / station range length). National percentile: 13. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PREVENTIVE MAINTENANCE- PRIMARY ROADS, MANILA NORTH RD - K0564 + 003 -  K0564 + 190, K0564+737 -  K0565 + 002

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

27 projects · ₱2.4B total · 0 flags

Other projects by this contractor

No sat.

CLUSTER 6: 1. ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSED AND LANDSLIDE - SECONDARY ROADS - JCT BUENAVISTA - LAWAAN - MARABUT RD - K0954+830 - K0954+950, K0962+110 - K0962+240, K0976+925 - K0977+097, E.

Region VIII, Region VIII

2021₱260.9M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER RA 11239 - REHABILITATION /RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - ALONG MANILA NORTH ROAD - K0489+000 - K0489+979, K0489+996 - K0490+497, K0491+199 - K0492+474

Region I, Region I

2024₱193.9M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF DAQUIOAG-TABUCBUC BRIDGE, MARCOS, ILOCOS NORTE

Region I, Region I

2025₱187.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MANILA NORTH RD - K0487 + 724 - K0488 + 407, K0488 + 422 - K0489 + 040, K0489 + 071 - K0489 + 215, K0489 + 1027 - K0490 + 035, K0489 + 215 - K0489 + 560, K0489 + 87

Region I, Region I

2025₱152.4M
Past target date (DPWH On-Going)
No sat.

PREVENTIVE MAINTENANCE - PRIMARY ROADS, MANILA NORTH ROAD - K0543+000 - K0544+293, K0544+382 - K0544+894, K0544+927 - K0545+734, K0546+049 - K0548+883, K0551+499 - K0551+568, K0551+678 - K0551+994

Region I, Region I

2024₱144.7M
Reported complete (DPWH)

Construction of Slope Protection Structure along Nayom River, Sta.006+285.2 - Sta. 006+922.2, Maya, lnfanta, Pangasinan

INFANTA (PANGASINAN), PANGASINAN, Region I

2024₱96.5M
Reported complete (DPWH)
View all 27 projects →

4. Implementation

Contract Amount

₱4,741,038.54

Progress

Reported complete (DPWH)

Start Date

August 16, 2024

Target End

September 8, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NortePagudpudSubec
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.