Roads17CB0005

ASSET PRESERVATION OF NATIONAL ROADS: REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) OF MARIVELES-TALAGA BAY ROAD K0166+604-K

ASSET PRESERVATION OF NATIONAL ROADS: REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) OF MARIVELES-TALAGA BAY ROAD K0166+604-K is a DPWH-tracked public work in Bataan 2nd DEO, Region III. Reported contract value: ₱9,444,262.56. Status: Reported complete (DPWH). Contractor on record: A S V CONST SUPPLY AND SERVICES. Figures trace to dpwh.

Bataan 2nd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱41,723 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0020346 · ₱409,941 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17CB0005 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-12-23 → 2019-04-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION OF NATIONAL ROADS: REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4  (HDM-4) OF MARIVELES-TALAGA BAY ROAD K0166+604-K

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱41,723,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures and Channel Excavation of Talisay River, Balanga Section, Sta. 0+000 - Sta. 0+567, Balanga City, Bataan
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0020346

₱409,941.00 · FY2017

Released to Regional Office - IV (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

20 projects · ₱152.8M total · 0 flags

Other projects by this contractor

No sat.

LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONCRETING OF BARANGAY ROAD, PAG-ASA-TALA ROAD, ORANI, BATAAN

Bataan 1st DEO, Region III

2019₱19.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS- JOSE ABAD SANTOS AVENUE (JASA), K0102+000 - K0102+680, K0102+756-K0103+184.80

Bataan 1st DEO, Region III

2020₱19.2M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- TERTIARY ROADS -CALAGUIMAN VICINAL RD. - K0127+260-K0127+460.20, K0127+517- - K0127+997 AND K0128+041- K0128+176.40 SAMAL, BATAAN

Bataan 1st DEO, Region III

2022₱13.2M
Reported complete (DPWH)
No sat.

ASSETS PRESERVATION OF NATIONAL ROADS REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE JCT. LAYAC-BALANGA-MARIVELES PORT ROAD KO160+340-KO160+460, MARIVELES, BATAAN

Bataan 2nd DEO, Region III

2017₱11.3M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF ROAD, BARANGAY STO NINO AND SAPANG BALASDINALUPIHAN, BATAAN

Bataan 1st DEO, Region III

2020₱9.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF MEGA DIKE AT SITIO TAWIRAN, BRGY. CABCABEN, MARIVELES, BATAAN

Bataan 2nd DEO, Region III

2018₱9.8M
Reported complete (DPWH)
View all 20 projects →

4. Implementation

Contract Amount

₱9,444,262.56

Progress

Reported complete (DPWH)

Start Date

January 31, 2017

Target End

May 30, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BataanMarivelesIpag
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.