Flood Control and Drainage18LE0049

CONSTRUCTION OF CONCRETE REVETMENT (RC CUT-OFF WALL) INCLUDING RROW NUING, JOSE ABAD SANTOS, DAVAO OCCIDENTAL (STA. 0+700.00 - STA. 0+260)

CONSTRUCTION OF CONCRETE REVETMENT (RC CUT-OFF WALL) INCLUDING RROW NUING, JOSE ABAD SANTOS, DAVAO OCCIDENTAL (STA. 0+700.00 - STA. 0+260) is a DPWH-tracked public work in Davao Occidental DEO, Region XI. Reported contract value: ₱28,513,631.31. Status: Reported complete (DPWH). Contractor on record: ALPHA. Figures trace to dpwh.

Davao Occidental DEO, Region XI
Region: Region XI

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱30,000

    Probable match · score 0.92

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-LGRCB-18-0025292 · ₱50,900,000 · release to the district office, not itemized per project

    Possible match · score 0.76

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱28,513,631 · ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-04-05 → 2024-11-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Davao Occidental

Based on the coordinates published with the DPWH record and NOAH file DavaoOccidental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CONCRETE REVETMENT (RC CUT-OFF WALL) INCLUDING RROW NUING, JOSE ABAD SANTOS, DAVAO OCCIDENTAL (STA. 0+700.00 - STA. 0+260)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Concrete Revetment (RC Cut-off Wall), Nuing, Jose Abad Santos, Davao Occidental
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-LGRCB-18-0025292

₱50,900,000.00 · FY2018

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

18LE0049,NOA,RESO,NTP,CONTRACT

₱28,513,631.31 · ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP

Award / contract ref: 18LE0049

Contractor

B

831 projects · ₱32.1B total · 0 flags

4. Implementation

Contract Amount

₱28,513,631.31

Progress

Reported complete (DPWH)

Start Date

June 6, 2018

Target End

November 5, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao OccidentalJose Abad SantosNuing
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.