Roads24IH0029

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG CATARMAN-CALBAYOG RD - CATARMAN-CALBAYOG RD-K0762+000 - K0762+886, K0774+821 - K0775+005, K0775+042 - K0777+499, K0783+633 - K0784+500, LOPE DE VEGA, NORTHERN SAMAR

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG CATARMAN-CALBAYOG RD - CATARMAN-CALBAYOG RD-K0762+000 - K0762+886, K0774+821 - K0775+005, K0775+042 - K0777+499, K0783+633 - K0784+500, LOPE DE VEGA, NORTHERN SAMAR is a DPWH-tracked public work in Northern Samar 1st DEO, Region VIII. Reported contract value: ₱82,337,909.85. Status: Reported complete (DPWH). Contractor on record: NFH CONST & SUPPLY. Figures trace to dpwh.

Northern Samar 1st DEO, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱82,338,521 · VCD CONSTRUCTION AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-07-31 → 2021-07-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱18,738,714 per km= 0.9x the Region VIII median (n=297)

Contract cost ₱82,337,910 ÷ 4.394 km read from the DPWH title (“K0762+000 - K0762+886; K0774+821 - K0775+005; K0775+042 - K0777+499; K0783+633 - K0784+500”; K-post / station range length). National percentile: 32. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG CATARMAN-CALBAYOG RD - CATARMAN-CALBAYOG RD-K0762+000 - K0762+886, K0774+821 - K0775+005, K0775+042 - K0777+499, K0783+633 - K0784+500, LOPE DE VEGA, NORTHERN SAMAR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Catubig Flood Control Structure, Catubig, Northern Samar
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Northern Samar 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24IH0029 (Readvertised)-

₱82,338,520.95 · VCD CONSTRUCTION AND SUPPLY

Award / contract ref: 24IH0029 (Readvertised)

Contractor

B

50 projects · ₱4.0B total · 5 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) - K0681+580 - K0683+000, K0683+410 - K0684+440, K0684+750 - K0685+810, K0687+964 - K0688+092

Region VIII, Region VIII

2024₱250.2M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN)-IMELDA BOULEVARD, VIRAC, CATANDUANES, VIRAC, CATANDUANES (LONE DISTRICT)

Region V, Region V

2024₱232.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG DAANG MAHARLIKA (LZ)-K0456+(-892)-K0456+(-627), K0457+1741-K0457+2047, K0461+385-K0463+000

Region V, Region V

2024₱222.3M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY PACKAGE 19, CAMARINES SUR, PILI, CAMARINES SUR (3RD LEGISLATIVE DISTRICT)

Region V, Region V

2024₱193.0M
Past target date (DPWH On-Going)
No sat.

MFO3-MAINTENANCE & CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, DARAGA, PLACER-DIVISORIA, CAWAYAN ROAD, MASBATE PROVINCE

Region V, Region V

2017₱193.0M
Reported complete (DPWH)
No sat.

BRIDGE - WIDENING OF PERMANENT BRIDGES - PALANIT BR. (B00237SM) ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.), NORTHERN SAMAR 1

Region VIII, Region VIII

2024₱192.9M
Past target date (DPWH On-Going)
View all 50 projects →

4. Implementation

Contract Amount

₱82,337,909.85

Progress

Reported complete (DPWH)

Start Date

March 4, 2024

Target End

October 17, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)Northern SamarCatarmanCervantes
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.