Water Provision and Storage19O00029

RAINWATER COLLECTION SYSTEM (RWCS) FOR FY 2019 (BARANGAY HALL TALON DOS LAS PINAS CITY)

RAINWATER COLLECTION SYSTEM (RWCS) FOR FY 2019 (BARANGAY HALL TALON DOS LAS PINAS CITY) is a DPWH-tracked public work in National Capital Region, National Capital Region. Reported contract value: ₱520,020.15. Status: Reported complete (DPWH). Contractor on record: M C LAYGO BUILDERS. Figures trace to dpwh.

National Capital Region, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱520,020 · M C LAYGO BUILDERS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-26 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: RAINWATER COLLECTION SYSTEM (RWCS) FOR FY 2019 (BARANGAY HALL TALON DOS LAS PINAS  CITY)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Projects

₱520,020.15 · M C LAYGO BUILDERS

Award / contract ref: 19O00029

Contractor

B

44 projects · ₱433.1M total · 0 flags

Other projects by this contractor

No sat.

RENOVATION OF PRESIDENTIAL ESCORT HEADQUARTERS, AREA III, MALACAÑANG PARK

South Manila DEO, National Capital Region

2025₱48.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI - PURPOSE BUILDING WITHIN ZONE 96 TO 98, SANTA ANA, MANILA CITY

South Manila DEO, National Capital Region

2025₱48.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NAT'L. ROAD/S LEADING TO MAJOR /STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPV'T. OF ROADS & DRAINAGE SYSTEM AT PANDACAN, ZONES 92 & 93, MANILA

South Manila DEO, National Capital Region

2025₱28.8M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-NATIONAL BUILDING PROGRAM-BUILDING AND OTHER STRUCTURES/MULTI-PURPOSE FACILITIES-CONSTRUCTION OF MALACAÑANG PALACE BUILDING, MATERIALS RECOVERY FACILITY COMPOUND, PANDACAN, MANILA

South Manila DEO, National Capital Region

2024₱24.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-REHABILITATION OF ISIDRO MENDOZA HEALTH CENTER, PANDACAN, MANILA

South Manila DEO, National Capital Region

2023₱22.6M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF VARIOUS ROADS AND ALLEYS, BRGY. 649, BASECO, PORT AREA, M

South Manila DEO, National Capital Region

2022₱14.8M
Reported complete (DPWH)
View all 44 projects →

4. Implementation

Contract Amount

₱520,020.15

Progress

Reported complete (DPWH)

Start Date

September 16, 2019

Target End

November 29, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of Las PiñasTalon Dos
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.