Bridges25F00109

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-TARA/BEGUITO BR. ALONG MAHARLIKA HIGHWAY (PHASE II), REGIONWIDE

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-TARA/BEGUITO BR. ALONG MAHARLIKA HIGHWAY (PHASE II), REGIONWIDE is a DPWH-tracked public work in Region V, Region V. Reported contract value: ₱152,855,933.88. Status: Past target date (DPWH On-Going). Contractor on record: G C I CONST AND DEV'T CORP. Figures trace to dpwh.

Region V, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25F00109 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    24% reported · imagery 2020-11-29 → 2020-11-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-TARA/BEGUITO BR. ALONG MAHARLIKA HIGHWAY (PHASE II), REGIONWIDE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2025 GAA. DBM GAA FY2025

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

305 projects · ₱29.5B total · 6 flags

Other projects by this contractor

No sat.

OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAMARINES SUR EXPRESSWAY PROJECT (SAN FERNANDO-PILI), PACKAGE 1, CAMARINES SUR, MINALABAC, CAMARINES SUR 2ND LEGISLATIVE DISTRICT

Region V, Region V

2018₱289.5M
Reported complete (DPWH)
No sat.

OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAMARINES SUR EXPRESSWAY PROJECT (SAN FERNANDO-PILI), PACKAGE 2, CAMARINES SUR, MINALABAC, CAMARINES SUR 2ND LEGISLATIVE DISTRICT

Region V, Region V

2018₱289.5M
Reported complete (DPWH)
No sat.

CLUSTER I-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-I-I-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY POBLACIO

Region V, Region V

2024₱283.1M
Past target date (DPWH On-Going)

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD (CIRCUMFERENTIAL ROAD)IN SUPPORT OF AGRIC

Region V, Region V

2023₱279.8M
Reported complete (DPWH)
No sat.

CLUSTER VIII-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-VIII-I: DAANG MAHARLIKA (LZ)-K0399+034-K0399+045, K0400+615-KO401+970; VIII-II: DAANG MAHARLIKA (LZ)-K0414+385-K04

Region V, Region V

2024₱273.7M
Past target date (DPWH On-Going)
No sat.

CLUSTER XI-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-XI-I: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS-CATANDUANES CIR RD-K0003+060-K0003+648, K0003+658-K0

Region V, Region V

2024₱262.5M
Past target date (DPWH On-Going)
View all 305 projects →

4. Implementation

Contract Amount

₱152,855,933.88

Progress

Past target date (DPWH On-Going)

Start Date

May 30, 2025

Target End

March 16, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurSipocotTara
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.