Buildings and Facilities16MG0123

CONSTRUCTION OF 1 UNIT-2STY 4CL AT PROPER NED NHS-LAKE SEBU NHS ANNEX, LAKE SEBU, SOUTH COTABATO

CONSTRUCTION OF 1 UNIT-2STY 4CL AT PROPER NED NHS-LAKE SEBU NHS ANNEX, LAKE SEBU, SOUTH COTABATO is a DPWH-tracked public work in South Cotabato 2nd DEO, Region XII. Reported contract value: ₱6,863,390.01. Status: Reported complete (DPWH). Contractor on record: C E K CONST AND WATER SUPPLY. Figures trace to dpwh.

South Cotabato 2nd DEO, Region XII
Region: Region XII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱21,420 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-16-0038846 · · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16MG0123 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-04-01 → 2016-12-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1 UNIT-2STY 4CL AT PROPER NED NHS-LAKE SEBU NHS ANNEX, LAKE SEBU, SOUTH COTABATO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱21,420,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure (Slope Protection) to Protect Lower Silway Bridge, Brgy. Labanggal, General Santos City, South Cotabato
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-16-0038846

₱-10,062,870.00 · FY2016

Released to Guimaras Di (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱6,863,390.01

Progress

Reported complete (DPWH)

Start Date

November 15, 2016

Target End

May 8, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)South CotabatoLake SebuTakunel
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.