Buildings and Facilities24NF0070

CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAMBANDO, BARANGAY 5-POBLACION, GENERAL LUNA, SURIGAO DEL NORTE

CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAMBANDO, BARANGAY 5-POBLACION, GENERAL LUNA, SURIGAO DEL NORTE is a DPWH-tracked public work in Surigao del Norte 1st DEO, Region XIII. Reported contract value: ₱9,888,135.46. Status: Reported complete (DPWH). Contractor on record: RADIAN CONST AND SUPPLY. Figures trace to dpwh.

Surigao del Norte 1st DEO, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱30,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24NF0070 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-05-17 → 2025-02-11

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAMBANDO, BARANGAY 5-POBLACION, GENERAL LUNA, SURIGAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Tagbayani Flood Mitigation Structure, Barangay Tagbayani, Sison, Surigao del Norte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Surigao del Norte 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

210 projects · ₱1.3B total · 0 flags

4. Implementation

Contract Amount

₱9,888,135.46

Progress

Reported complete (DPWH)

Start Date

June 26, 2024

Target End

December 22, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del NorteGeneral LunaPoblacion V
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.