Roads23FH0036

CONST./IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP), SAN ANDRES-PANDAN-HIYOP ACCESS ROAD LEADING TO HIYOP HIGHLANDS AND SUNO-NOG SEA CAVE, PANDAN, CATANDUANES

CONST./IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP), SAN ANDRES-PANDAN-HIYOP ACCESS ROAD LEADING TO HIYOP HIGHLANDS AND SUNO-NOG SEA CAVE, PANDAN, CATANDUANES is a DPWH-tracked public work in Catanduanes DEO, Region V. Reported contract value: ₱2,938,759.96. Status: Reported complete (DPWH). Contractor on record: T-BUILDERS CONST. Figures trace to dpwh.

Catanduanes DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23FH0036 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-07-16 → 2025-04-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST./IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP), SAN ANDRES-PANDAN-HIYOP ACCESS ROAD LEADING TO HIYOP HIGHLANDS AND SUNO-NOG SEA CAVE, PANDAN, CATANDUANES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control at Sibacungan, Bato, Catanduanes
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Catanduanes DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

9 projects · ₱40.3M total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BRGY. GUINSAANAN, BARAS, CATANDUANES

Catanduanes DEO, Region V

2023₱14.8M
Reported complete (DPWH)
No sat.

BASIC INFRA PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, MUNICIPALITY OF SAN ANDRES, CATANDUANES

Catanduanes DEO, Region V

2024₱5.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONST./IMPV'T OF ACCESS RDS. LEADING TO DECLARED TOURISM DESTINATION (TRIP) SAN ANDRES-PANDAN SITIO CAGNIPA ACCESS RDS LEADING TO TUWAD-TUWADAN BLUE LAGOON AND ROCK FORMATION, CAGNIPA ROLLING HILLS, CAGNIPA COVE AND MURAW BEACH, PANDAN, CATANDUANES

Catanduanes DEO, Region V

2023₱4.9M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY RIZAL, VIGA, CATANDUANES

Catanduanes DEO, Region V

2024₱3.0M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY STA. CRUZ. SAN ANDRES, CATANDUANES

Catanduanes DEO, Region V

2024₱3.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION (COMPLETION) OF THE MULTI-PURPOSE BUILDING BARANGAY TIMBAAN, SAN ANDRES, CATANDUANES

Catanduanes DEO, Region V

2024₱2.0M
Reported complete (DPWH)
View all 9 projects →

4. Implementation

Contract Amount

₱2,938,759.96

Progress

Reported complete (DPWH)

Start Date

July 13, 2023

Target End

September 2, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)CatanduanesPandanHiyop
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.