Flood Control and Drainage15CJ0156

CONST./MAINT. OF FMSDS-REPAIR/REHAB. OF REINFORCED CONC. SLOPE PROTECTION ALONG O'DONELL RIVER CONTR

CONST./MAINT. OF FMSDS-REPAIR/REHAB. OF REINFORCED CONC. SLOPE PROTECTION ALONG O'DONELL RIVER CONTR is a DPWH-tracked public work in Tarlac DEO, Region III. Reported contract value: ₱22,287,302.72. Status: Reported complete (DPWH). Contractor on record: FLORDES CONST. Figures trace to dpwh.

Tarlac DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROIVB-16-0038894 · ₱5,140,000 · release to the district office, not itemized per project

    Possible match · score 0.74

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱22,287,303 · FLORDES CONSTRUCTION AND TRADING .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-01-21 → 2025-04-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Tarlac

Based on the coordinates published with the DPWH record and NOAH file Tarlac.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST./MAINT. OF FMSDS-REPAIR/REHAB. OF REINFORCED CONC. SLOPE PROTECTION ALONG O'DONELL RIVER CONTR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-16-0038894

₱5,140,000.00 · FY2016

Released to Culion Sani (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction/Maintenance of Flood Mitigation Struc

₱22,287,302.72 · FLORDES CONSTRUCTION AND TRADING .

Award / contract ref: 15CJ0156

Contractor

C

333 projects · ₱17.6B total · 0 flags

4. Implementation

Contract Amount

₱22,287,302.72

Progress

Reported complete (DPWH)

Start Date

January 21, 2016

Target End

June 20, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)TarlacCity of TarlacArmenia
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.