GAA 2017 MFO-217OB0418

DREDGING AND REVETMENT WORKS ALONG SAN JUAN RIVER (LEFT BANK, STA. 3+638.903 TO STA. 4+700.000)

DREDGING AND REVETMENT WORKS ALONG SAN JUAN RIVER (LEFT BANK, STA. 3+638.903 TO STA. 4+700.000) is a DPWH-tracked public work in Flood Control Management Cluster, Central Office. Reported contract value: ₱91,670,123.63. Status: Reported complete (DPWH). Contractor on record: L R TIQUI BUILDERS INC. Figures trace to dpwh.

Flood Control Management Cluster, Central Office
Region: Central Office

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17OB0418 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-08-10 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (revetment)

₱86,392 per linear m= 0.6x the national median (n=191)

Contract cost ₱91,670,124 ÷ 1,061.1 linear m read from the DPWH title (“STA. 3+638.903 TO STA. 4+700.000”; station range length (Sta. a+b to c+d)). National percentile: 31. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: DREDGING AND REVETMENT WORKS ALONG SAN JUAN RIVER (LEFT BANK, STA. 3+638.903 TO STA. 4+700.000)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

380 projects · ₱29.1B total · 8 flags

Other projects by this contractor

View all 380 projects →

4. Implementation

Contract Amount

₱91,670,123.63

Progress

Reported complete (DPWH)

Start Date

January 28, 2018

Target End

February 4, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of San JuanBalong-Bato
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.