Buildings and Facilities23D00015No coordinates published by DPWH

CONSTRUCTION OF PNPA ENGINEERING OFFICE, CAMP GEN MARIANO CASTAÑEDA, SILANG, CAVITE, PHASE II

CONSTRUCTION OF PNPA ENGINEERING OFFICE, CAMP GEN MARIANO CASTAÑEDA, SILANG, CAVITE, PHASE II is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱9,736,923.92. Status: Past target date (DPWH On-Going). Contractor on record: TANTUCO CONST. Figures trace to dpwh.

Region IV-A, Region IV-A

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region IV-A

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23D00015 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    85% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF PNPA ENGINEERING OFFICE, CAMP GEN MARIANO CASTAÑEDA, SILANG, CAVITE, PHASE II

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2023 GAA. DBM GAA FY2023

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

26 projects · ₱218.6M total · 0 flags

Other projects by this contractor

No sat.

FY 2021 DPWH INFRASTRUCTURE PROGRAMCONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY CONSTRUCTION OF AFP STAFF HOUSE BUILDING I, SOLCOM, LUCENA CITY, QUEZON

Region IV-A, Region IV-A

2021₱49.9M
Reported complete (DPWH)
No sat.

CY 2018 BASIC EDUCATION FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 2STY 10CLTAGKAWAYAN NHS, TAGKAWAYAN, QUEZON

Quezon 4th DEO, Region IV-A

2018₱24.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ADMINISTRATION BUILDING, HEADQUARTERS, CAMP GUILLERMO NAKAR, LUCENA CITY, QUEZON, PHASE V

Region IV-A, Region IV-A

2024₱18.7M
Past target date (DPWH On-Going)
No sat.

CLUSTER 4-A. CONC. OF SAN PEDRO FMR, BRGY. SAN PEDRO, TIAONG, QUEZON B. CONC. OF BEHIA FMR, BRGY. BEHIA, TIAONG, QUEZON C. CONC. OF SAN FRANCISCO FMR, BRGY. SAN FRANCISCO, TIAONG, QUEZON D. CONC. OF ANASTACIA FMR, BRGY. ANASTACIA, TIAONG, QUEZON E. CONCRE

Quezon 2nd DEO, Region IV-A

2016₱15.8M
Reported complete (DPWH)
No sat.

CLUSTER 6-A. CONC. OF SITIO ILAYA FMR, BRGY. SAN MATEO, DOLORES, QUEZON B. CONC. OF PUROK 1-2 FMR, BRGY. ANTONINO, DOLORES, QUEZON C. CONC. OF PUROK 1 FMR, BRGY. ANTONINO, DOLORES, QUEZON D. CONC. OF SITIO BANGKONG KAHOY FMR, BRGY. KINABUHAYAN, DOLORES, Q

Quezon 2nd DEO, Region IV-A

2016₱15.3M
Reported complete (DPWH)
No sat.

CLUSTER 3-A. CONC. OF GIBANGA FMR, BRGY. GIBANGA, SARIAYA, QUEZON B. CONC. OF TALAAN PANTOC FMR, BRGY. TALAAN PANTOC, SARIAYA, QUEZON C. CONC. OF MANGGALANG KILING FMR, BRGY. MANGGALANG KILING, SARIAYA, QUEZON D. CONC. OF MORONG FMR, BRGY. MORONG, SARIAY

Quezon 2nd DEO, Region IV-A

2016₱13.9M
Reported complete (DPWH)
View all 26 projects →

4. Implementation

Contract Amount

₱9,736,923.92

Progress

Past target date (DPWH On-Going)

Start Date

March 3, 2023

Target End

August 9, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.