Buildings and Facilities25BA0022

CSSP: BIP- MULTIPURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTIPURPOSE BUILDING (BARANGAY HALL) PHASE I, BARANGAY RAELE, ITBAYAT, BATANES

CSSP: BIP- MULTIPURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTIPURPOSE BUILDING (BARANGAY HALL) PHASE I, BARANGAY RAELE, ITBAYAT, BATANES is a DPWH-tracked public work in Batanes DEO, Region II. Reported contract value: ₱6,921,826.10. Status: Past target date (DPWH On-Going). Contractor on record: J F GABOTERO INC. Figures trace to dpwh.

Batanes DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25BA0022 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    0% reported · imagery 2024-05-10 → 2025-09-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CSSP: BIP- MULTIPURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTIPURPOSE BUILDING (BARANGAY HALL) PHASE I, BARANGAY RAELE, ITBAYAT, BATANES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Chahampuay Flood Control Structure, Barangay Savidug, Sabtang, Batanes
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Batanes DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

29 projects · ₱449.1M total · 1 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS- FLOOD MANAGEMENT PROGRAM:CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF GUARDWALL ALONG AIRPORT-MAUYEN PORT ROAD, ITBAYAT, BATANES

Batanes DEO, Region II

2025₱49.0M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SEA WALL AT IVANA SHELTER PORT, IVANA, BATANES

Batanes DEO, Region II

2024₱39.1M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM; CONSTRUCTION OF GUARDWALL ALONG SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN RD, SABTANG, BATANES

Batanes DEO, Region II

2024₱35.3M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM:ASSET PRESERVATION PROGRAM:CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS:MAYAN-MAUYEN PORT ROAD-K0000+040-K0000+145,K0000+225-K0000+516

Batanes DEO, Region II

2025₱29.4M
Past target date (DPWH On-Going)
No sat.

Construction of Guardwall (along Basco-Mahatao-Ivana-Uyugan-Imnajbu Road), Basco, Batanes

BASCO (CAPITAL) (BATANES), BATANES, Region II

2023₱24.1M
Reported complete (DPWH)
No sat.

Construction of Nakanmuan Seawall, Barangay Nakanmuan, Sabtang, Batanes

SABTANG (BATANES), BATANES, Region II

2023₱21.2M
Reported complete (DPWH)
View all 29 projects →

4. Implementation

Contract Amount

₱6,921,826.10

Progress

Past target date (DPWH On-Going)

Start Date

March 20, 2025

Target End

October 30, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)BatanesItbayatRaele
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.