Roads24JC0033

RECONSTRUCTION TO CONCRETE PAVEMENT-DIPOLOG-SINDANGAN-LILOY RD-K1868+160 -K1868+526.28, K1872+115-K1872+287,K1872+328-K1873+053.33

RECONSTRUCTION TO CONCRETE PAVEMENT-DIPOLOG-SINDANGAN-LILOY RD-K1868+160 -K1868+526.28, K1872+115-K1872+287,K1872+328-K1873+053.33 is a DPWH-tracked public work in Zamboanga del Norte 2nd DEO, Region IX. Reported contract value: ₱26,099,999.99. Status: Past target date (DPWH On-Going). Contractor on record: D' DREAMER DEVELOPMENT CORP. Figures trace to dpwh.

Zamboanga del Norte 2nd DEO, Region IX
Region: Region IX

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24JC0033 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    94% reported · imagery 2010-08-30 → 2025-08-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱20,655,271 per km= 0.8x the Region IX median (n=70)

Contract cost ₱26,100,000 ÷ 1.264 km read from the DPWH title (“K1868+160 -K1868+526.28; K1872+115-K1872+287; K1872+328-K1873+053.33”; K-post / station range length). National percentile: 25. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: RECONSTRUCTION TO CONCRETE PAVEMENT-DIPOLOG-SINDANGAN-LILOY RD-K1868+160 -K1868+526.28, K1872+115-K1872+287,K1872+328-K1873+053.33

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Pres. Manuel Roxas, Zamboanga del Norte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Zamboanga del Norte 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

4. Implementation

Contract Amount

₱26,099,999.99

Progress

Past target date (DPWH On-Going)

Start Date

May 20, 2024

Target End

December 29, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga del NorteManukanPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.