Roads22GA0005

CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG AKLAN WEST ROAD (KALIBO-NABAS) (S00480PN) K0262+940 - K0262+990, K0264+450 K0264+570, K0265+400 K0265+460, K0266+000 K0266+080 AKLAN WEST ROAD (KALIBO-NABAS)

CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG AKLAN WEST ROAD (KALIBO-NABAS) (S00480PN) K0262+940 - K0262+990, K0264+450 K0264+570, K0265+400 K0265+460, K0266+000 K0266+080 AKLAN WEST ROAD (KALIBO-NABAS) is a DPWH-tracked public work in Aklan DEO, Region VI. Reported contract value: ₱19,592,572.13. Status: Reported complete (DPWH). Contractor on record: EC BUILDERS. Figures trace to dpwh.

Aklan DEO, Region VI
Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22GA0005 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-06-19 → 2021-06-19

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG AKLAN WEST ROAD (KALIBO-NABAS) (S00480PN)  K0262+940 - K0262+990, K0264+450 K0264+570, K0265+400 K0265+460, K0266+000 K0266+080  AKLAN WEST ROAD (KALIBO-NABAS)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Aslum River (Delta Permanent Opening), Barangay Aslum, Ibajay, Aklan
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Aklan DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

4. Implementation

Contract Amount

₱19,592,572.13

Progress

Reported complete (DPWH)

Start Date

May 23, 2022

Target End

January 15, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)AklanMalayPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.