Flood Control and Drainage17CG0109No coordinates published by DPWH

REHABILITATION/IMPROVEMENT AND SLOPE PROTECTION OF ALAULI CREEK, MASANTOL, PAMPANGA STA. 0+008-STA. 3+555, MASANTOL, PAMPANGA

REHABILITATION/IMPROVEMENT AND SLOPE PROTECTION OF ALAULI CREEK, MASANTOL, PAMPANGA STA. 0+008-STA. 3+555, MASANTOL, PAMPANGA is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱17,963,448.70. Status: Reported complete (DPWH). Contractor on record: EDDMARI CONST. Figures trace to dpwh.

Pampanga 1st DEO, Region III

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-17-0021650 · ₱8,957,832 · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17CG0109 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-12-22 → 2025-02-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/IMPROVEMENT AND SLOPE PROTECTION OF ALAULI CREEK, MASANTOL, PAMPANGA STA. 0+008-STA. 3+555, MASANTOL, PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Facilities at Alassas Creek, Sta. Cruz, Magalang, Pampanga
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-17-0021650

₱8,957,832.00 · FY2017

Released to 00000 - Supreme Court of To cover he Philippines and the Lower reti ourts (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

181 projects · ₱8.8B total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 5 AND PACKAGE 6, PROVINCE OF PAMPANGA

Region III, Region III

2023₱243.2M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 4, PROVINCE OF PAMPANGA

Region III, Region III

2021₱214.2M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM (LIP) -NATIONAL ROADS, CONSTRUCTION OF APALIT BYPASS ROAD CONNECTING TWO PROVINCES IN REGION III, BULACAN AND PAMPANGA

Region III, Region III

2017₱198.0M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 2, PROVINCE OF PAMPANGA

Region III, Region III

2020₱193.0M
Reported complete (DPWH)
No sat.

CONST./REP/REHAB./IMPR'VT. OF VARIOUS INFRA INCLUDING LOCAL PROJECTS-LOCAL ROADS & BRIDGES-LOCAL ROADS-REHAB./IMPR'VT. (UPGRADING & WIDENING TO 4-LANES WITH CONCRETE SLOPE PROTECTION) OF SAN MATIAS-STO. ROSARIO PAU ROAD, STO. TOMAS, PAMPANGA

Region III, Region III

2021₱193.0M
Reported complete (DPWH)

REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA (INLCUDING ROW), CANDABA AND SAN SIMON, PAMPANGA

Flood Control Management Cluster, Central Office

2018₱174.3M
Reported complete (DPWH)
View all 181 projects →

4. Implementation

Contract Amount

₱17,963,448.70

Progress

Reported complete (DPWH)

Start Date

August 7, 2017

Target End

January 3, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaMasantol
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.