Buildings and Facilities18OF0267

CONST. OF FENCE, DRAINAGE SYSTEM & PAVEMENT AT HOLY SPIRIT NALT. H/S ANNEX, CONST. OF COVERED WALK WAY AND ELECT. SERVICE ENTRANCE POST AT PRES. CORAZON C. AQUINO E/S, COMPLETION OF FOUR (4) TWELVE (12) CLASSROOM S/B AT HOLY SPIRIT NALT. H/S, SAN AGUSTIN

CONST. OF FENCE, DRAINAGE SYSTEM & PAVEMENT AT HOLY SPIRIT NALT. H/S ANNEX, CONST. OF COVERED WALK WAY AND ELECT. SERVICE ENTRANCE POST AT PRES. CORAZON C. AQUINO E/S, COMPLETION OF FOUR (4) TWELVE (12) CLASSROOM S/B AT HOLY SPIRIT NALT. H/S, SAN AGUSTIN is a DPWH-tracked public work in Quezon City 1st DEO, National Capital Region. Reported contract value: ₱11,922,400.00. Status: Reported complete (DPWH). Contractor on record: FRAMECON BUILDERS. Figures trace to dpwh.

Quezon City 1st DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROI-18-0026880 · ₱327,796 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱11,922,400 · FRAMECON BUILDERS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-26 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF FENCE, DRAINAGE SYSTEM & PAVEMENT AT HOLY SPIRIT NALT. H/S ANNEX, CONST. OF COVERED WALK WAY AND ELECT. SERVICE ENTRANCE POST AT PRES. CORAZON C. AQUINO E/S, COMPLETION OF FOUR (4)  TWELVE (12) CLASSROOM S/B AT HOLY SPIRIT NALT. H/S, SAN AGUSTIN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation/Improvement of Drainage System of Calabite St., Brgy. San Isidro Labrador and Brgy. Salvacion, Quezon City
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROI-18-0026880

₱327,796.00 · FY2018

Released to re Ilocos Norte Agricultural College FY (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

18OF0267 Construction of Fence, Drainage System an

₱11,922,400.00 · FRAMECON BUILDERS

Award / contract ref: 18OF0267

Contractor

B

495 projects · ₱7.8B total · 4 flags

4. Implementation

Contract Amount

₱11,922,400.00

Progress

Reported complete (DPWH)

Start Date

January 28, 2019

Target End

June 26, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)Quezon CityHoly Spirit
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.