Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Isabela 4th District Engineering Office awarded 117 of 118 recorded flood-control contracts (99.2%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (28.8 percentage points higher; binomial p = 5.2e-17), across 21 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from highly competitive bidding or precise cost estimation practices in the office.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Isabela 4th District Engineering Office: contracts
117 of 118 contracts (99.2%) at ≥99.5% of ABC · peer baseline 70.4% · gap +28.8 pts · binomial p = 5.2e-17. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 22BH0062 | Construction of Cagayan River Flood Control Structure, Sta. 0+240 - Sta. 0+747, Dammang West, Echague, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 24BH0118 | Construction of Dibuluan Flood Control Structure, Section 2, Jones, Isabela | DALCON CONST | 100.00% | DPWH |
| 24BH0207 | Construction of Barangay 2 Flood Control Structure, Section 1, Jones, Isabela | V B MANUBAY CONST / VBM CONST CORP | 100.00% | DPWH |
| 24BH0209 | Construction of Papan Weste Flood Control Structure, Section 4, Jones, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 21BH0178 | Construction of Nabbuan Flood Control Structure, Nabbuan, Santiago City, Isabela | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 100.00% | DPWH |
| 22BH0125 | Rehabilitation of Cagayan River Flood Control Project, Sta. 0+000 - Sta. 0+202, Dammang West, Echague, Isabela | C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC | 100.00% | DPWH |
| 24BH0196 | Construction of Dipangit Flood Control Structure, Section 1, Jones, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 24BH0211 | Construction of Dipangit Flood Control Structure, Section 4, Jones, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 21BH0180 | Construction of Cagayan River Flood Control Project, Dammang West, Echague, Isabela | JC PALOMO CONST & CONST SUPPLY | 100.00% | DPWH |
| 22BH0056 | Construction of Brgy. Carabatan Grande Flood Control Structure, Cauayan, Isabela | DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST / JWU CONST AND SUPPLY | 100.00% | DPWH |
| 24BH0277 | Construction of Tanggal Flood Control Structure, Section 1, Cordon, Isabela | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 100.00% | DPWH |
| 21BH0174 | Construction of Dubinan East Flood Control Structure, Dubinan East, Santiago City, Isabela | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 100.00% | DPWH |
| 23BH0203 | Construction of Flood Control Structure, Barangay Digumased, Section 1, Dinapigue, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 22BH0147 | Construction of Santo Domingo Flood Control Structure, Minuri, Jones, Isabela | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 100.00% | DPWH |
| 22BH0144 | Construction of Guyabal Flood Control Project, Guyabal, Cauayan City, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 24BH0054 | Construction of Amobocan, Flood Control Project, Amobocan, Cauayan, Isabela (Package 1) | MA TESORO CONST | 100.00% | DPWH |
| 22BH0057 | Construction of Flood Control along Ganano River at Batal (Sta. 0+000 - Sta. 0+400), Isabela | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 100.00% | DPWH |
| 21BH0172 | Construction of Dibulo Flood Control Project, Dibulo, Dinapigue Isabela, Isabela | DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST | 100.00% | DPWH |
| 23BH0082 | Construction of Ayod Flood control Structure, Dinapigue, Isabela | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22BH0061 | Construction of Brgy. Alicaocao Flood Control Structure, Cauayan, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 24BH0218 | Construction of Dumawing Flood Control Structure, Section 1, Jones, Isabela | DALCON CONST | 100.00% | DPWH |
| 23BH0176 | Construction of Barangay Quimalabasa Norte Flood Control Project, Section 2, San Agustin, Isabela | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 100.00% | DPWH |
| 23BH0153 | Construction of Barangay Salay Flood Control Structure, Section 2, San Agustin, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 23BH0139 | Construction of Barangay Virgoneza Flood Control Structure, Section 1, San Agustin, Isabela | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 100.00% | DPWH |
| 22BH0139 | Construction of Villa Victoria Flood Control Structure, Brgy. Villa Victoria, Echague, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 24BH0046 | Construction of Carabatan Chica Flood Control Project, Cauayan City, Isabela | MA TESORO CONST | 100.00% | DPWH |
| 24BH0182 | Construction of Bautista Flood Control Structure, Section 1, San Agustin, Isabela | DALCON CONST | 100.00% | DPWH |
| 22BH0142 | Construction of Flood Control Structure at Brgy. Camarag-Fugu bridge Approach, Brgy. Camarag, San Isidro, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BH0135 | Construction of Barangay Quimalabasa Norte Flood Control Project, Section 1, San Agustin, Isabela | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 100.00% | DPWH |
| 23BH0102 | Construction of Barangay Minuri Flood Control Structure, Section 3, Jones, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 23BH0140 | Construction of Barangay Virgoneza Flood Control Structure, Section 2, San Agustin, Isabela | COLBY CONST | 100.00% | DPWH |
| 22BH0109 | Construction of Flood Control Structure at Brgy. Carabatan Chica, Cauayan City, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 24BH0269 | Construction of Masaya Centro Flood Control Structure, Section 1, San Agustin, Isabela | DALCON CONST | 100.00% | DPWH |
| 22BH0112 | Construction of Sta. Cruz Flood Control Project at Barangay Sta. Cruz, Echague, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 24BH0194 | Construction of Disimpit Flood Control Structure, Jones, Isabela | CASAN CONST AND TRADING | 100.00% | DPWH |
| 24BH0001 | Construction of Flood Control Structure, Masaya Norte, San Agustin, Isabela | NTL BUILDERS AND DEVELOPER | 100.00% | DPWH |
| 24BH0203 | Construction of Malannit Flood Control Structure, Section 1, Jones, Isabela | DALCON CONST | 100.00% | DPWH |
| 21BH0176 | Construction of Sinsayon Flood Control Structure, Sinsayon, Santiago City, Isabela | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 100.00% | DPWH |
| 24BH0272 | Construction of Digumased Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 760, Dinapigue, Isabela | DALCON CONST | 100.00% | DPWH |
| 23BH0156 | Construction of Barangay Dibuluan Flood Control Structure, Section 3, Jones, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 24BH0086 | Construction of Santos Flood Control Structures, Santos, San Agustin, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 24BH0117 | Construction of Dibuluan Flood Control Structure, Section 1, Jones, Isabela | DALCON CONST | 100.00% | DPWH |
| 24BH0195 | Construction of Dipangit Flood Control Structure, Section 2, Jones, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 24BH0187 | Construction of Dipangit Flood Control Structure, Section 3, Jones, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BH0103 | Construction of Barangay Papan Weste Flood Control Structure, Section 1, Jones, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 23BH0083 | Construction of Didekkel Creek Flood control Structure, Dinapigue, Isabela | ST TIMOTHY CONST CORP | 100.00% | DPWH |
| 22BH0115 | Construction of Villaflor Flood Control Structure, Sta. 0+000 - Sta. 0+595, San Isidro, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 22BH0113 | Construction of Addalam Flood Control Structure, Jones, Isabela | C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC | 100.00% | DPWH |
| 23BH0175 | Construction of Barangay Palagao Flood Control Structure, Section 1, Jones, Isabela | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 100.00% | DPWH |
| 22BH0143 | Construction of Flood Control Structure at Brgy. Papan Este, Jones, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 22BH0146 | Construction of Flood Control Structure, Brgy. Sinsayon, Santiago City, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 24BH0299 | Construction of Dedekkel Flood Control Structure, Section 1, Dinapigue, Isabela | DALCON CONST | 100.00% | DPWH |
| 22BH0107 | Rehabilitation of Annafunan Flood Control Project, Sta. 0 + 000 - Sta. 0 + 420, Annafunan, Echague, Isabela | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 100.00% | DPWH |
| 23BH0076 | Construction of Aguinaldo Flood control Structure, Cordon, Isabela | DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST | 100.00% | DPWH |
| 22BH0118 | Construction of Brgy. Minuri Flood Control Structure, Sta. 0 + 400 - Sta. 0 + 915, Jones, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BH0078 | Construction of Tanggal Flood control Structure, Cordon, Isabela | DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST | 100.00% | DPWH |
| 23BH0088 | Construction of Alicaocao Flood Control Project, Cauayan City, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BH0231 | Construction of Cabaruan, Drainage System Project, Cabaruan, Cauayan City, Isabela | DALCON CONST | 100.00% | DPWH |
| 23BH0173 | Construction of Flood Control Structure, Barangay II, Section 2, Jones, Isabela | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BH0105 | Construction of Barangay Sto. Domingo Flood Control Structure, Section 1, Jones, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 24BH0235 | Construction of Linomot Flood Control Structure, Section 2, Jones, Isabela | DALCON CONST | 100.00% | DPWH |
| 23BH0128 | Construction of Barangay Sto. Domingo Flood Control Structure, Section 2, Jones, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 23BH0080 | Construction of Villa Marzo Flood Control Structure, Section 1, Cordon, Isabela | DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST | 100.00% | DPWH |
| 22BH0059 | Construction of Flood Control along Ganano River at Batal (Sta. 0+800 - Sta. 1+300), Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 23BH0181 | Construction of Barangay Palagao Flood Control Structure, Section 2, Jones, Isabela | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 100.00% | DPWH |
| 22BH0111 | Construction of Flood Control Structure at Brgy. Calaocan Section 2, Santiago City, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 22BH0108 | Construction of Flood Control along Ganano River, Sta.1 + 787 - Sta.2 + 250, Batal, Santiago City, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 22BH0060 | Construction of Flood Control along Ganano River at Batal (Sta. 1+300 - Sta. 1+787), Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 24BH0205 | Construction of Arubub Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 730, Jones, Isabela | DALCON CONST | 100.00% | DPWH |
| 22BH0110 | Construction of Flood Control Structure at Brgy. Calaocan Section 1, Santiago City, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BH0152 | Construction of Barangay Salay Flood Control Structure, Section 1, San Agustin, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 22BH0117 | Rehabilitation of Rang-ay Flood Control Structure, Section 1, Sta. 0 + 000 - Sta. 0 + 420, Isabela | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 100.00% | DPWH |
| 23BH0028 | Construction of Santo Domingo Flood Control Structure, Sta. 0 + 226 - Sta. 0 + 553, Santo Domingo, Jones, Isabela | CASAN CONST AND TRADING | 100.00% | DPWH |
| 24BH0234 | Construction of Linomot Flood Control Structure, Section 1, Jones, Isabela | DALCON CONST | 100.00% | DPWH |
| 22BH0114 | Construction of Brgy. Panang Flood Control Structure, Sta. 0 + 400 - Sta. 0 + 795, San Agustin, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 21BH0179 | Construction of Buyon Creek Flood Control Project, Castillo, Echague, Isabela | V B MANUBAY CONST | 100.00% | DPWH |
| 23BH0079 | Construction of Villa Marzo Flood Control Structure, Section 2, Cordon, Isabela | DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST | 100.00% | DPWH |
| 24BH0224 | Construction of Usol Flood Control Structure, Section 1, Jones, Isabela | DALCON CONST | 100.00% | DPWH |
| 22BH0145 | Construction of Tagaran Flood Control Project, Tagaran, Cauayan City, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BH0104 | Construction of barangay Divisoria Flood Control Structure, Sta. 0+000 - Sta. 0+350, Santiago City, Isabela | NTL BUILDERS AND DEVELOPER | 100.00% | DPWH |
| 22BH0122 | Construction of Santo Domingo Flood Control Structure, Santo Domingo, Jones, Isabela | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 100.00% | DPWH |
| 22BH0138 | Construction of Maligaya Flood Control Structure, Brgy. Maligaya, Echague, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BH0077 | Construction of Dicamay1 Flood Control Structure Section 1 Jones, Isabela | DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST | 100.00% | DPWH |
| 23BH0029 | Construction of Minuri Flood Control Structure, Sta. 0 + 226 - Sta. 0 + 553, Minuri, Jones, Isabela | CASAN CONST AND TRADING | 100.00% | DPWH |
| 23BH0081 | Construction of Dicamay1 Flood Control Structure Section 2 Jones, Isabela | DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST | 100.00% | DPWH |
| 23BH0233 | Construction of Turayong Drainage System Project, Cauayan City, Isabela | DALCON CONST | 100.00% | DPWH |
| 24BH0013 | Construction of Barangay Palacian Flood Control Structure, Section 1, Barangay Palacian, San Agustin, Isabela | NTL BUILDERS AND DEVELOPER | 100.00% | DPWH |
| 23BH0155 | Construction of Barangay Cabulay Flood Control Structure, Sta. 0+000 - Sta. 0+350, Santiago City, Isabela | NTL BUILDERS AND DEVELOPER | 100.00% | DPWH |
| 23BH0151 | Construction of Barangay Fugo Flood Control Structure, Sta. 0+000 - Sta. 0+350, Jones, Isabela | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 100.00% | DPWH |
| 22BH0055 | Construction of Annafunan Flood Control Project, Annafunan, Echague, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 22BH0141 | Construction of Flood Control Structure, Ipil, Echague, Isabela | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BH0084 | Construction of Dimalaude Flood Control Structure, Dinapigue, Isabela | ST TIMOTHY CONST CORP / JAY ARCIE CONST AND SUPPLY | 99.99% | DPWH |
| 23BH0137 | Construction of Barangay Sinaoangan Norte Flood Control Structure, Section 2, San Agustin, Isabela | V B MANUBAY CONST | 99.99% | DPWH |
| 23BH0148 | Construction of Flood Control Structure, Barangay Arubub, Section 2, Jones, Isabela | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 99.99% | DPWH |
| 24BH0159 | Construction of Flood Control Struture, Barangay Tupax, Jones, Isabela | JWU CONST AND SUPPLY | 99.99% | DPWH |
| 23BH0059 | Construction of Amobocan, Flood Control Project (Package 1), Amobocan, Cauayan City, Isabela | JWU CONST AND SUPPLY | 99.99% | DPWH |
| 24BH0186 | Construction of Pongpongan Flood Control Structure, Section 1, Jones, Isabela | JWU CONST AND SUPPLY | 99.99% | DPWH |
| 24BH0276 | Construction of Flood Control and Drainage Structure Section 2, Barangay Palawan, San Guillermo, Isabela | JWU CONST AND SUPPLY | 99.99% | DPWH |
| 24BH0220 | Construction of Diarao Flood Control Structure, Section 1, Jones, Isabela | JWU CONST AND SUPPLY | 99.98% | DPWH |
| 24BH0113 | Construction of Dammang West Flood Control Structure, Echague, Isabela | JWU CONST AND SUPPLY | 99.98% | DPWH |
| 24BH0193 | Construction of Masaya Sur Flood Control Structure, Section 1, barangay Masaya Sur, San Agustin, Isabela | JWU CONST AND SUPPLY | 99.98% | DPWH |
| 24BH0210 | Construction of Bantay Flood Control Structure, Section 1, Jones, Isabela | JWU CONST AND SUPPLY | 99.97% | DPWH |
| 23BH0187 | Construction of Flood Control Structure, Brgy. San Pablo, Cauayan City, Isabela | JWU CONST AND SUPPLY | 99.97% | DPWH |
| 23BH0194 | Construction of Flood Control Structure, Baringin Section 2, Cauayan City, Isabela | JWU CONST AND SUPPLY | 99.97% | DPWH |
| 23BH0190 | Construction of Flood Control Structure, Brgy. Cassap Fuera, Cauayan City, Isabela | JWU CONST AND SUPPLY | 99.97% | DPWH |
| 23BH0188 | Construction of Flood Control Structure, Brgy. Nagcampegan, Cauayan City, Isabela | JWU CONST AND SUPPLY | 99.97% | DPWH |
| 23BH0189 | Construction of Flood Control Structure, Brgy. Sinnipil, Cauayan City, Isabela | JWU CONST AND SUPPLY | 99.97% | DPWH |
| 23BH0147 | Construction of Barangay Payac Flood Control Structure, Section 1, Jones, Isabela | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 99.96% | DPWH |
| 24BH0222 | Construction of Addalam Flood Control Structure, Purok 4, barangay Addalam, Jones, Isabela | V B MANUBAY CONST | 99.95% | DPWH |
| 23BH0136 | Construction of Barangay Sinaoangan Norte Flood Control Structure, Section 1, San Agustin, Isabela | V B MANUBAY CONST | 99.92% | DPWH |
| 24BH0110 | Construction of Bautista Flood Control Structure, Section 2, San Agustin, Isabela | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 99.90% | DPWH |
| 24BH0150 | Construction of Napaliong Flood control Structure, Section 2, Jones, Isabela | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 99.90% | DPWH |
| 24BH0197 | Construction of Laoag Flood Control Structures, Sta. 0+000-Sta. 0+790, San Agustin, Isabela | V B MANUBAY CONST | 99.89% | DPWH |
| 22BH0123 | Construction of Flood Control System, Barangay Carabatan Chica, Cauayan City, Isabela | JWU CONST AND SUPPLY | 99.89% | DPWH |
| 24BH0160 | Construction of Napaliong Flood Control Structure, Jones, Isabela | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 99.87% | DPWH |
| 24BH0294 | Construction of Dimaluade Flood Control Structure, Section 2, Dinapigue, Isabela | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 99.79% | DPWH |
| 24BH0258 | Construction of Slope Protection along Villagonzaga-Nabbuan Road, Villagonzaga-Nabbuan, Santiago City, Isabela | CASAN CONST AND TRADING | 99.79% | DPWH |
| 24BH0002 | Construction of Aguinaldo Flood Control, Section 3, Cordon, Isabela | FNS BUILDERS & ENT | 98.33% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Isabela 4th District Engineering Office",
"nearAbc": 117,
"trigger": "office_pattern_aggregate",
"officeId": "064c3276-4db9-5c92-ab52-297b7ba13c42",
"threshold": 0.995,
"binomialTailP": 5.2289639730900124e-17,
"nearAbcRatePct": 99.2,
"totalContracts": 118,
"baselineRatePct": 70.4,
"excessPctPoints": 28.8,
"expectedNearAbc": 83.1,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents
