Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Cross-Source Mismatch (PhilGEPS vs DPWH)

Linked PhilGEPS award amount or awardee disagrees with Sumbong contract row.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: PhilGEPS award 22IJ-0030 lists ₱40.77M to JFR CONSTRUCTION ., while DPWH records contract 22IJ0030 at ₱43.61M to JFR CONST INC FORMERLY:JFR CONST. The difference may be due to a company name update or a contract variation after the award.

Public record entityConstruction of Flood Control Structure along Jibatang River, Brgy. Nabang, Calbayog City, Samar
LocationCALBAYOG CITY (SAMAR (WESTERN SAMAR)), SAMAR (WESTERN SAMAR), Region VIIIContract 22IJ0030
Amount₱43,612,695.07 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Jibatang River, Brgy. Nabang, Calbayog City, Samar22IJ0030Flood control100%October 25, 2022October 25, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 8, 2022 · Source fetched October 21, 2026

Rule Definition

Compares linked award and project contractor/cost above tolerance.

Triggering Data & citations

Linked PhilGEPS award fields disagree with DPWH/Sumbong contract record

{
  "linkId": "49c9acf8-e0fd-4963-85b1-3721e295f900",
  "awardId": "c1325261-800a-4366-8911-d392b135d826",
  "linkScore": 1,
  "nameMismatch": true,
  "amountMismatch": true,
  "awardAmountPhp": 40772000,
  "linkValidation": "dates overlap and title similarity 0.67",
  "projectCostPhp": 43612695.07,
  "philgepsAwardee": "JFR CONSTRUCTION ."
}

Possible Innocent Explanations

  • The difference may be due to a company name update or a contract variation after the award.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)SamarCity of CalbayogNabang
Storms whose wind field reached it
Nokaen 2026Koto 2025Fung-Wong 2025Kalmaegi 2025Fengshen 2025
Hazard exposure
Active fault2.6 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.