Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23FA0019 and 23FA0035 have near-identical descriptions at the same coordinates (funding year 2023; ₱144.75M, ₱21.56M). Worth checking whether they cover the same works. It is possible that these are separate but related structures or phases at the same site, or that one is a continuation or improvement of the other.

Public record entityConstruction of Baranghawon River Control, Barangay Baranghawon, Tabaco City, Albay
LocationCITY OF TABACO (ALBAY), ALBAY, Region VContract 23FA0019
Amount₱144,750,000.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Baranghawon River Control, Barangay Baranghawon, Tabaco City, Albay23FA0019Flood control100%December 27, 2023November 7, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 14, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Identical coordinates shared by multiple contracts

{
  "contractId": "23FA0019",
  "coordinates": {
    "lat": 13.35377,
    "lon": 123.7182
  },
  "otherContracts": [
    "23FA0035"
  ]
}

Possible Innocent Explanations

  • Multi-component contracts sharing a single pin
  • GIS centroid placement

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of TabacoGuinobat
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Active fault23.7 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.