Pattern Consistent with Contract Splitting
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 5 contracts awarded to LANOY CONST by the same office started within 41 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 4 in the same municipality. It is possible that these are separate flood control projects in different barangays or river sections, planned together for efficiency.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Ibawon Flood Control Structure and Drainage System, Ibawon River Basin, Sta. 0+000 - Sta. 0+400 (Upstream), Brgy. Burabod, MacArthur, Leyte22ID0032Flood control | 100% | December 10, 2022 | December 10, 2022 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: March 21, 2022 · Source fetched October 21, 2026
Rule Definition
≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Leyte 2nd District Engineering Office",
"contractId": "22ID0032",
"contractor": "LANOY CONST",
"windowDays": 120,
"clusterSize": 5,
"thresholdPhp": 50000000,
"contractCostPhp": 48992529.6,
"averageTitleSimilarity": 0.9155245535526213
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program
Cite this record
Love the Philippines. “Pattern Consistent with Contract Splitting (C5): Construction of Ibawon Flood Control Structure and Drainage System, Ibawon River Basin, Sta. 0+000 - Sta. 0+400 (Upstream), Brgy. Burabod, MacArthur, Leyte.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/6f33b1fa-edf8-4363-8ce1-9c5942329ab9
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.