Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 5 contracts awarded to RJIR ENT CORP by the same office started within 81 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. It is possible that these are separate flood control projects in different barangays or sitios, each requiring individual contracts.

Public record entityConstruction of Tide Protection Embankment, Barangay Silad, Villaba, Leyte
LocationVILLABA (LEYTE), LEYTE, Region VIIIContract 23IE0010
Amount₱48,019,993.25 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Tide Protection Embankment, Barangay Silad, Villaba, Leyte23IE0010Flood control100%December 13, 2023August 8, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 12, 2023 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold in one municipality

{
  "deo": "Leyte 3rd District Engineering Office",
  "contractId": "23IE0010",
  "contractor": "RJIR ENT CORP",
  "windowDays": 120,
  "clusterSize": 5,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48019993.25,
  "maxInOneMunicipality": 3
}

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteVillabaSilad
Storms whose wind field reached it
Nokaen 2026Koto 2025Kalmaegi 2025Fengshen 2025Bualoi 2025
Hazard exposure
Active fault17.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)no layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideno layer coverage for this provinceUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.