High Concurrent Workload for One Contractor
Contractor linked to many simultaneous projects or very high total value vs peers.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 11-16 CONST holds 39 flood-control contracts worth ₱2.69B, 2.65× the 95th-percentile contractor total (₱1.01B); up to 15 ran at the same time. This is a capacity question worth examining. The contractor may have exceptional capacity or be a preferred provider in the region.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Bank Improvement of Manggahan Floodway (Eastbank Side), Pasig City (Package 1)24OB0256Flood control | 100% | October 7, 2024 | October 7, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Bank Improvement of Manggahan Floodway (Eastbank Side), Pasig City (Package 2)24OB0257Flood control | 100% | October 7, 2024 | October 7, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Flood Control on Main Drainage Canal and Tributaries at South of River (Cataban and Caaoacan Section), Laoag City, Ilocos Norte23AA0304Flood control | 100% | January 15, 2024 | November 20, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Flood Control Structure along Baag-Pasaleng, Pagudpud, Ilocos Norte23AA0158Flood control | 100% | December 24, 2023 | November 17, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Flood Control Structure along Barangay Caunayan, Pagudpud, Ilocos Norte23AA0307Flood control | 100% | January 8, 2024 | December 6, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Flood Control Structure along Pampanga River, Apalit, Pampanga24CG0024Flood control | 100% | September 20, 2024 | September 20, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Show 33 more projects in this bucket
| Construction of Flood Control Structure, Barangay Subec, Pagudpud, Ilocos Norte23AA0261Flood control | 100% | December 29, 2023 | December 6, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Flood Mitigation Structure at Calizon, Calumpit, Bulacan24CC0141Flood control | 100% | October 17, 2024 | October 17, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Flood Mitigation Structure at Frances, Calumpit, Bulacan24CC0140Flood control | 100% | October 17, 2024 | October 17, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Flood Mitigation Structures along Barangay San Francisco, Bulacan, Bulacan23CC0138Flood control | 100% | December 9, 2023 | December 6, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of River Control along Balanac River, Brgy Maulawin, Pagsanjan, Laguna24DH0033Flood control | 100% | February 28, 2025 | February 28, 2025 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of River Protection along Balagtas River, K001 + 260 to K001 + 460, barangay Pulong Gubat, Balagtas, Bulacan23CC0208Flood control | 100% | January 14, 2024 | December 4, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of River Protection along Balagtas River, K013 + 060 to K013 + 164, San Juan Section, Balagtas, Bulacan23CC0209Flood control | 100% | December 15, 2023 | December 13, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of River Protection along Guiguinto River, K005 + 750 to K005 + 950, barangay Ilang-ilang, Guiguinto, Bulacan23CC0210Flood control | 100% | December 15, 2023 | December 8, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Slope Protection Structure along Pampanga River, San Luis, Pampanga24CG0005Flood control | 100% | November 7, 2024 | November 7, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction/improvement of Flood Mitigation Structure at Matungao,Bulakan, Bulacan24CC0273Flood control | 100% | November 27, 2024 | November 27, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction/lmprovement of Flood Mitigation Structure at Mercado, Hagonoy, Bulacan24CC0179Flood control | 100% | October 24, 2024 | October 24, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction/mprovement of Flood Mitigation Structure at Mambog, Malolos City, Bulacan24CC0197Flood control | 100% | November 5, 2024 | November 5, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction/mprovement of Flood Mitigation Structure at Tampok, Hagonoy, Bulacan24CC0184Flood control | 100% | November 5, 2024 | November 5, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Constructionmprovement of Flood Mitigation Structure at Carillo, Hagonoy, Bulacan24CC0181Flood control | 100% | October 24, 2024 | October 24, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge) Sta. 19+571.86 to 19+601.86, Left Bank, Marikina City21OB0312Flood control | 100% | February 9, 2023 | February 9, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge) Sta. 19+601.86 to Sta. 19+621.86, Left Bank, Marikina City21OB0313Flood control | 100% | January 10, 2023 | January 10, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Dike along O'Donnell River, Sta 8 + 264.80 to 8 + 564, Downstream of Bueno Bride 1, Left Bank, Capas Tarlac23CK0048Flood control | 100% | December 17, 2023 | December 17, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Dike along O'Donnell River, Sta. 10 + 303 to 10 + 614.20, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac23CK0047Flood control | 100% | December 15, 2023 | December 15, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Dike along O'Donnell River, Sta. 9 + 983 to Sta. 10 + 303, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac,23CK0046Flood control | 100% | December 15, 2023 | December 15, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Eroded Pampanga River Bank along Barangay Sucad, Apalit, Pampanga (Phase II)22CG0014Flood control | 100% | October 25, 2022 | October 30, 2022 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Eroded Pampanga River Bank, Cansinala, Apalit, Pampanga22CG0013Flood control | 100% | October 28, 2022 | October 28, 2022 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Existing Bank along Lucung River, D/S of Cutcut Bridge (Left and Right Bank), Capas, Tarlac22CK0088Flood control | 100% | February 19, 2023 | February 19, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Existing Dike along Lucung River (Magao Section, Right Bank), Concepcion, Tarlac22CK0102Flood control | 100% | December 8, 2022 | January 31, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Existing Dike along Lucung River, U/S of Santiago Bridge, Left Bank, Concepcion, Tarlac22CK0087Flood control | 100% | December 29, 2022 | December 29, 2022 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Existing Dike along O''Donell River (Sta. Lucia Section, Right Bank), Sta. 10+820.00 to Sta. 11+102.80, Capas, Tarlac,22CK0103Flood control | 100% | October 16, 2022 | October 16, 2022 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 to Sta. 10+340, Capas, Tarlac21CK0035Flood control | 100% | August 16, 2022 | August 16, 2022 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Flood Control Structure, Kalaklan River near Subic Bay Freeport Zone, Sta. 001 + 230 - Sta. 001 + 610 (Right Side), Olongapo City, Zambales22CM0052Flood control | 100% | January 17, 2023 | September 23, 2022 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Strengthening of Road Dike along Pampanga River, Barangay Sucad, Apalit, Pampanga24CG0004Flood control | 100% | November 3, 2024 | November 3, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Dike/Slope Protection Sacobia-Bamban River, Malonzo Area, Right Bank, U/S of SCTEX Bridge, Bamban, Tarlac22CK0107 | 100% | March 8, 2023 | March 8, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Groundsill Sacobia-Bamban River, Bamban, Tarlac24CK0022 | 100% | November 19, 2024 | November 19, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Slope Protection along Ilugin Creek, Pasig City (Package 1)24OB0083 | 100% | December 1, 2024 | December 1, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Construction of Slope Protection along Pasak River, Guagua, Pampanga22CH0042 | 100% | October 9, 2022 | October 9, 2022 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
| Rehabilitation of Bank Protection along Pasig-Potrero River, Manuali (Phase 1), Porac, Pampanga22CH0080 | 100% | December 18, 2023 | December 18, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Rule Definition
Active project count and total value vs peer 95th percentile.
Triggering Data & citations
Contractor carries far more concurrent flood-control value than peers
{
"contractor": "11-16 CONST",
"projectCount": 39,
"totalValuePhp": 2689359491.81,
"peerP95TotalPhp": 1014143494.4100002,
"activeProjectCount": 0,
"simultaneousThreshold": 25
}Source documents
Possible Innocent Explanations
- Large national firm with many concurrent government clients
- Data groups joint ventures under one name