High Concurrent Workload for One Contractor

Contractor linked to many simultaneous projects or very high total value vs peers.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 11-16 CONST holds 39 flood-control contracts worth ₱2.69B, 2.65× the 95th-percentile contractor total (₱1.01B); up to 15 ran at the same time. This is a capacity question worth examining. The contractor may have exceptional capacity or be a preferred provider in the region.

Public record entity11-16 CONSTOrganization record →
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 39Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Bank Improvement of Manggahan Floodway (Eastbank Side), Pasig City (Package 1)24OB0256Flood control100%October 7, 2024October 7, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Bank Improvement of Manggahan Floodway (Eastbank Side), Pasig City (Package 2)24OB0257Flood control100%October 7, 2024October 7, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Control on Main Drainage Canal and Tributaries at South of River (Cataban and Caaoacan Section), Laoag City, Ilocos Norte23AA0304Flood control100%January 15, 2024November 20, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Control Structure along Baag-Pasaleng, Pagudpud, Ilocos Norte23AA0158Flood control100%December 24, 2023November 17, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Control Structure along Barangay Caunayan, Pagudpud, Ilocos Norte23AA0307Flood control100%January 8, 2024December 6, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Control Structure along Pampanga River, Apalit, Pampanga24CG0024Flood control100%September 20, 2024September 20, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Show 33 more projects in this bucket
Construction of Flood Control Structure, Barangay Subec, Pagudpud, Ilocos Norte23AA0261Flood control100%December 29, 2023December 6, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Mitigation Structure at Calizon, Calumpit, Bulacan24CC0141Flood control100%October 17, 2024October 17, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Mitigation Structure at Frances, Calumpit, Bulacan24CC0140Flood control100%October 17, 2024October 17, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Mitigation Structures along Barangay San Francisco, Bulacan, Bulacan23CC0138Flood control100%December 9, 2023December 6, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of River Control along Balanac River, Brgy Maulawin, Pagsanjan, Laguna24DH0033Flood control100%February 28, 2025February 28, 2025No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of River Protection along Balagtas River, K001 + 260 to K001 + 460, barangay Pulong Gubat, Balagtas, Bulacan23CC0208Flood control100%January 14, 2024December 4, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of River Protection along Balagtas River, K013 + 060 to K013 + 164, San Juan Section, Balagtas, Bulacan23CC0209Flood control100%December 15, 2023December 13, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of River Protection along Guiguinto River, K005 + 750 to K005 + 950, barangay Ilang-ilang, Guiguinto, Bulacan23CC0210Flood control100%December 15, 2023December 8, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Slope Protection Structure along Pampanga River, San Luis, Pampanga24CG0005Flood control100%November 7, 2024November 7, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction/improvement of Flood Mitigation Structure at Matungao,Bulakan, Bulacan24CC0273Flood control100%November 27, 2024November 27, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction/lmprovement of Flood Mitigation Structure at Mercado, Hagonoy, Bulacan24CC0179Flood control100%October 24, 2024October 24, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction/mprovement of Flood Mitigation Structure at Mambog, Malolos City, Bulacan24CC0197Flood control100%November 5, 2024November 5, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction/mprovement of Flood Mitigation Structure at Tampok, Hagonoy, Bulacan24CC0184Flood control100%November 5, 2024November 5, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Constructionmprovement of Flood Mitigation Structure at Carillo, Hagonoy, Bulacan24CC0181Flood control100%October 24, 2024October 24, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge) Sta. 19+571.86 to 19+601.86, Left Bank, Marikina City21OB0312Flood control100%February 9, 2023February 9, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Pasig-Marikina River Channel Improvement Project, Phase V, Contract Package 8 - River Improvement Works along Upper Marikina River (Upstream of Marikina Bridge) Sta. 19+601.86 to Sta. 19+621.86, Left Bank, Marikina City21OB0313Flood control100%January 10, 2023January 10, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Dike along O'Donnell River, Sta 8 + 264.80 to 8 + 564, Downstream of Bueno Bride 1, Left Bank, Capas Tarlac23CK0048Flood control100%December 17, 2023December 17, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Dike along O'Donnell River, Sta. 10 + 303 to 10 + 614.20, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac23CK0047Flood control100%December 15, 2023December 15, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Dike along O'Donnell River, Sta. 9 + 983 to Sta. 10 + 303, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac,23CK0046Flood control100%December 15, 2023December 15, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Eroded Pampanga River Bank along Barangay Sucad, Apalit, Pampanga (Phase II)22CG0014Flood control100%October 25, 2022October 30, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Eroded Pampanga River Bank, Cansinala, Apalit, Pampanga22CG0013Flood control100%October 28, 2022October 28, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Existing Bank along Lucung River, D/S of Cutcut Bridge (Left and Right Bank), Capas, Tarlac22CK0088Flood control100%February 19, 2023February 19, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Existing Dike along Lucung River (Magao Section, Right Bank), Concepcion, Tarlac22CK0102Flood control100%December 8, 2022January 31, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Existing Dike along Lucung River, U/S of Santiago Bridge, Left Bank, Concepcion, Tarlac22CK0087Flood control100%December 29, 2022December 29, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Existing Dike along O''Donell River (Sta. Lucia Section, Right Bank), Sta. 10+820.00 to Sta. 11+102.80, Capas, Tarlac,22CK0103Flood control100%October 16, 2022October 16, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 to Sta. 10+340, Capas, Tarlac21CK0035Flood control100%August 16, 2022August 16, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Flood Control Structure, Kalaklan River near Subic Bay Freeport Zone, Sta. 001 + 230 - Sta. 001 + 610 (Right Side), Olongapo City, Zambales22CM0052Flood control100%January 17, 2023September 23, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Strengthening of Road Dike along Pampanga River, Barangay Sucad, Apalit, Pampanga24CG0004Flood control100%November 3, 2024November 3, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Dike/Slope Protection Sacobia-Bamban River, Malonzo Area, Right Bank, U/S of SCTEX Bridge, Bamban, Tarlac22CK0107100%March 8, 2023March 8, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Groundsill Sacobia-Bamban River, Bamban, Tarlac24CK0022100%November 19, 2024November 19, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Slope Protection along Ilugin Creek, Pasig City (Package 1)24OB0083100%December 1, 2024December 1, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Slope Protection along Pasak River, Guagua, Pampanga22CH0042100%October 9, 2022October 9, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Rehabilitation of Bank Protection along Pasig-Potrero River, Manuali (Phase 1), Porac, Pampanga22CH0080100%December 18, 2023December 18, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Rule Definition

Active project count and total value vs peer 95th percentile.

Triggering Data & citations

Contractor carries far more concurrent flood-control value than peers

{
  "contractor": "11-16 CONST",
  "projectCount": 39,
  "totalValuePhp": 2689359491.81,
  "peerP95TotalPhp": 1014143494.4100002,
  "activeProjectCount": 0,
  "simultaneousThreshold": 25
}

Possible Innocent Explanations

  • Large national firm with many concurrent government clients