Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Schedule / Date Inconsistencies

Completion before start, implausible duration for cost, or future dates marked complete.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23I00006 (₱106.15M) is recorded as completed in 107 days against 299 planned; similar-cost projects take a median of 377 days, putting it in the fastest 2.1%. The contractor may have deployed unusually large resources or worked in favorable conditions, allowing for rapid completion.

Public record entityConstruction of Flood Control Structure along Binahaan River, Barangay Cahumayhumayan, Tanauan, Leyte
LocationTANAUAN (LEYTE), LEYTE, Region VIIIContract 23I00006
Amount₱106,149,990.90 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Binahaan River, Barangay Cahumayhumayan, Tanauan, Leyte23I00006Flood control100%January 8, 2024June 30, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 15, 2023 · Source fetched October 21, 2026

Rule Definition

Compares start, target, and actual dates from Sumbong with contract cost.

Triggering Data & citations

Contract schedule fields are inconsistent or implausible

{
  "issues": [
    "implausibly_short_duration"
  ],
  "startDate": "2023-03-15T00:00:00.000Z",
  "contractId": "23I00006",
  "actualEndDate": "2023-06-30T00:00:00.000Z",
  "targetEndDate": "2024-01-07T00:00:00.000Z",
  "contractCostPhp": 106149990.9
}

Possible Innocent Explanations

  • Revised dates not yet reflected in Sumbong export
  • Early completion certificate vs planned start typo

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteTanauanBinongto-an
Storms whose wind field reached it
Nokaen 2026Koto 2025Kalmaegi 2025Fengshen 2025Bualoi 2025
Hazard exposure
Active fault23.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.