Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23DM0081 lists a cost of ₱74.25M, 2.59% above its Approved Budget for the Contract of ₱72.37M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a post-award contract variation that was not reflected in the ABC field.

Public record entityConstruction of Flood Control Structures along Catanauan River, Package A, Quezon
LocationCATANAUAN (QUEZON), QUEZON, Region IV-AContract 23DM0081
Amount₱74,250,000.00102.59% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structures along Catanauan River, Package A, Quezon23DM0081Flood control100%June 15, 2024June 14, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: September 8, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Quezon 3rd District Engineering Office",
  "ratio": 1.025910188195999,
  "abcPhp": 72374756.44,
  "threshold": 0.995,
  "contractId": "23DM0081",
  "contractor": "LIBRIUS CONST & SUPPLY CORP / JEMAK CONST & SUPPLY",
  "contractCostPhp": 74250000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to a data entry error or a post-award contract variation that was not reflected in the ABC field.

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Flood Control Structures along Catanauan River, Package A, Quezon.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/df1ed37c-f663-474b-a4ca-2352bfd07b1f

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonCatanauanBarangay 10
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Active fault15.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA2 (3.01-4 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.