Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23FE0075 and 23FE0056 have near-identical descriptions about 91 m apart (funding year 2023; ₱52.47M, ₱72.37M). Worth checking whether they cover the same works. It is possible these are two segments of a larger flood control project that were bid out separately.

Public record entityConstruction of Flood Control along Libmanan River, Brgy. Mambalite, Libmanan, Camarines Sur
LocationLIBMANAN (CAMARINES SUR), CAMARINES SUR, Region VContract 23FE0056
Amount₱72,374,796.65 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control along Libmanan River, Brgy. Mambalite, Libmanan, Camarines Sur23FE0056Flood control100%February 11, 2024January 25, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 5, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23FE0056",
  "coordinates": {
    "lat": 13.704778,
    "lon": 123.008484
  },
  "municipality": "LIBMANAN (CAMARINES SUR)",
  "distanceMeters": 90.7621961460615,
  "titleSimilarity": 1
}

Cite this record

Love the Philippines. “Duplicate or Near-Duplicate Projects (C3): Construction of Flood Control along Libmanan River, Brgy. Mambalite, Libmanan, Camarines Sur.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/f6572aa3-724a-4474-bd1d-82a8398a8438

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurLibmananMambalite
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Active fault16.4 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)LandslidelowUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.