Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22DC0052 and 24DC0051 have near-identical descriptions about 279 m apart (funding years 2022, 2024; ₱77.20M, ₱87.61M). Worth checking whether they cover the same works. These may be different segments or a continuation of flood control works along the same river.

Public record entityConstruction of Flood Mitigation Structure along San Juan River, Sto. Tomas City, Batangas
LocationCITY OF SANTO TOMAS (BATANGAS), BATANGAS, Region IV-AContract 24DC0051
Amount₱87,610,008.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure along San Juan River, Sto. Tomas City, Batangas24DC0051Flood control100%January 18, 2025September 10, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 25, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24DC0051",
  "coordinates": {
    "lat": 14.082555,
    "lon": 121.15598
  },
  "municipality": "CITY OF SANTO TOMAS (BATANGAS)",
  "distanceMeters": 279.4197182924429,
  "titleSimilarity": 0.9197860962566845
}

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)BatangasCity of Sto. Tomas
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024Ewiniar 2024
Hazard exposure
Active fault14.4 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)LandslidemediumUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.