Hon. Jesus "Jess" R. Marquez Representative, Aklan (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Aklan (First District) Dear Representative Jesus "Jess" R. Marquez: Good day. I live in Aklan (First District), and I would like to ask about some DPWH lines for the Aklan DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction (Completion) of Poblacion Multi Purpose Building, Barangay Poblacion, Lezo, Aklan, 11.7083627, 122.3265016 (Aklan DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 802; no matching NEP line for this office] 2. Construction of Multi-Purpose Building, Batan Elementary School, Barangay Ambolong, Batan, Aklan (Aklan DEO): not in the NEP; ₱15,500,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 804; no matching NEP line for this office] 3. Construction of Multi-purpose Building, Barangay Poblacion, Madalag, Aklan, 11.524547, 122.3049725 (Aklan DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 802; no matching NEP line for this office] 4. Construction of Multi-Purpose Building/ Evacuation Center, Barangay Andagao, Kalibo, Aklan (Aklan DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 805; no matching NEP line for this office] 5. Construction of Multi-purpose Building, Barangay Ambolong, Batan, Aklan, 11.58013108130256, 122.49795084927948 (Aklan DEO): not in the NEP; ₱12,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 802; no matching NEP line for this office] 6. Construction/Rehabilitation of Barangay Road, Barangay Baybay, Tangalan, Aklan, 11.77138333333, 122.27058333333 (Aklan DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 558; no matching NEP line for this office] 7. Construction of Road, Sitio Ilaya, Barangay Candelaria, New Washington, Aklan (Aklan DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 560; no matching NEP line for this office] 8. Construction of Multi-Purpose Building (Covered Court /Evacuation Center), Barangay Estancia, Kalibo, Aklan, 11.687405, 122.3664137 (Aklan DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 801; no matching NEP line for this office] 9. Construction of Multi-Purpose Building, Barangay Ochando, New Washington, Aklan, 11.614381804783324, 122.48251314058079 (Aklan DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 801; no matching NEP line for this office] 10. Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Altavas, Aklan, 11.5344467, 122.4915097 (Aklan DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 802; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Aklan DEO: 1,625 contracts (2016–2025) in public DPWH records; 1,382 recorded as completed and 183 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Revetment Wall along Ibajay River, Barangay Polo, Ibajay, Aklan (24GA0014): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/d79f9e7e-9c4d-43da-8906-7e2a5a4badce - Construction of Revetment Wall along Ibajay River, Barangay Polo, Ibajay, Aklan (23GA0039): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/64366a61-c3b9-4e97-adc0-96409871eba8 - Construction of Revetment Wall along Aklan River, Brgy. Palale, Banga, Aklan (22GA0120): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/67a2a899-d712-4cfb-9add-6d577c409569 - Construction of Revetment Wall along Aklan River, Barangay Bakhaw Sur, Kalibo, Aklan (22GA0032): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/c3d207aa-7d41-40fb-bd8b-9cd26b86c4f0 - Construction of Revetment Wall along Aklan River, Barangay Mobo, Kalibo, Aklan (22GA0034): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/4fe55bec-33ed-46ca-8e45-eba2f8c48e72 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/aklan-1st
Write your representative · FY2027 budget
Aklan (First District)
Representative: Jesus "Jess" R. Marquez · bills and roles · official House profile
Served by: Aklan DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 76 lines selected.
Aklan DEO
This district engineering office also serves Aklan (Second District). The budget lines below belong to the office, not to one district.
- House version (HB 10858)
- ₱1.02B
- 141 lines
- President’s NEP
- ₱935.8M
- 93 lines
- Added by the House
- 61
- ₱315.6M
- Changed / removed
- 3 / 12
- 77 lines unchanged
Lines that differ from the NEP (64)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0240 + 739 - K0241 + 248A similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱26,650,000 | HB p. 201 |
| Construction (Completion) of Poblacion Multi Purpose Building, Barangay Poblacion, Lezo, Aklan, 11.7083627, 122.3265016 | Added by the House | — | ₱20,000,000 | HB p. 802 |
| Construction of Multi-Purpose Building, Batan Elementary School, Barangay Ambolong, Batan, Aklan | Added by the House | — | ₱15,500,000 | HB p. 804 |
| Construction of Multi-purpose Building, Barangay Poblacion, Madalag, Aklan, 11.524547, 122.3049725 | Added by the House | — | ₱15,000,000 | HB p. 802 |
| Construction of Multi-Purpose Building/ Evacuation Center, Barangay Andagao, Kalibo, Aklan | Added by the House | — | ₱15,000,000 | HB p. 805 |
| Construction of Multi-purpose Building, Barangay Ambolong, Batan, Aklan, 11.58013108130256, 122.49795084927948 | Added by the House | — | ₱12,000,000 | HB p. 802 |
| Construction of Road, along Right Side of Creek from Barangay Venturanza to Barangay Agbanawan, Banga, Aklan | Reduced | ₱15,000,000 | ₱5,000,000 | HB p. 558 NEP PDF p. 523 |
| Construction of Road, Balete Urban Center, Barangay Aranas, Balete, Aklan | Reduced | ₱20,000,000 | ₱10,000,000 | HB p. 558 NEP PDF p. 523 (scan reading; check the page) |
| Construction/Rehabilitation of Barangay Road, Barangay Baybay, Tangalan, Aklan, 11.77138333333, 122.27058333333 | Added by the House | — | ₱5,000,000 | HB p. 558 |
| Construction of Road, Sitio Pandan, Barangay Bay-ang, Batan, Aklan | Reduced | ₱10,000,000 | ₱5,000,000 | HB p. 559 NEP PDF p. 524 |
| Construction of Road, Sitio Ilaya, Barangay Candelaria, New Washington, Aklan | Added by the House | — | ₱5,000,000 | HB p. 560 |
| Construction of Multi-Purpose Building (Covered Court /Evacuation Center), Barangay Estancia, Kalibo, Aklan, 11.687405, 122.3664137 | Added by the House | — | ₱5,000,000 | HB p. 801 |
| Construction of Multi-Purpose Building, Barangay Ochando, New Washington, Aklan, 11.614381804783324, 122.48251314058079 | Added by the House | — | ₱5,000,000 | HB p. 801 |
| Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Altavas, Aklan, 11.5344467, 122.4915097 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction of Multi-Purpose Building, Barangay Camanci, Batan, Aklan, 11.5465834, 122.5461802 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Kalibo, Aklan, 11.707892, 122.3676176 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction (Completion) of Multi-purpose Building, Barangay Mobo, Kalibo, Aklan, 11.699892, 122.3582283 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction (Completion) of Multi-purpose Building at Sitio Maytaraw, Barangay Dalagsaan, Libacao, Aklan, 11.4641363, 122.2878706 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction (Completion) of Multi-purpose Building, Barangay Rosal, Libacao, Aklan, 11.4109994, 122.3018835 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction of Multi-purpose Building, Barangay Ortega, Libacao, Aklan, 11.438394586189878, 122.32343313671024 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction of Multi-purpose Building, Barangay Poblacion, Libacao, Aklan, 11.482132255656374, 122.30258531777 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction of Multi-purpose Building, Barangay Guadalupe, Libacao, Aklan, 11.459695149940625, 122.32868106498834 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction of Multi-purpose Building, Barangay Alaminos, Madalag, Aklan, 11.555102532134685, 122.2783590479788 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction of Multi-purpose Building, Barangay Jalas, New Washington, Aklan, 11.657621226404986, 122.38482560593825 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction (Completion) of Multi-purpose Building, Barangay Poblacion, New Washington, Aklan, 11.649141404590537, 122.43406745161064 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction (Completion) of Multi-purpse Building at Camp Major Jesus M. Jizmundo, Barangay, Libas, Banga, Aklan, 11.624947310729484, 122.34562379949057 | Added by the House | — | ₱5,000,000 | HB p. 802 |
| Construction (Completion) of Ibajay Integrated School Multi Purpose Building, Barangay Colong Colong, Ibajay, Aklan, 11.819875820243556, 122.17343941518266 | Added by the House | — | ₱5,000,000 | HB p. 803 |
| Construction of Multi-Purpose Building/ Evacuation Center, Barangay Candelaria, New Washington, Aklan | Added by the House | — | ₱5,000,000 | HB p. 804 |
| Construction of Multi-Purpose Building With Cr And Office, New Buswang, Kalibo, Aklan | Added by the House | — | ₱5,000,000 | HB p. 804 |
| Construction of Multi-Purpose Building/ Evacuation Center, Barangay Old Buswang, Kalibo Aklan | Added by the House | — | ₱5,000,000 | HB p. 804 |
| Continuing Construction/ Completion of Multi-Purpose Building/ Evacuation Center , at Sitio Saugan Barangay Tambak, New Washington, Aklan | Added by the House | — | ₱5,000,000 | HB p. 804 |
| Construction of Multi-Purpose Building/ Evacuation Center, Barangay Agbanawan, Banga, Aklan | Added by the House | — | ₱5,000,000 | HB p. 804 |
| Construction of Multi-Purpose Building/ Evacuation Center, Barangay Venturanza, Banga, Aklan | Added by the House | — | ₱5,000,000 | HB p. 805 |
| Construction of Multi-Purpose Building/ Evacuation Center, Barangay Mangan, Banga, Aklan | Added by the House | — | ₱5,000,000 | HB p. 805 |
| Construction/Completion of Multi-Purpose Building/ Evacuation Center at Sitio Himbis (Looban), Barangay Lalab, Batan, Aklan | Added by the House | — | ₱5,000,000 | HB p. 805 |
| Construction (Completion) of Multi Purpose Building, Barangay Bel-is, Buruanga, Aklan, 11.8783291, 121.8841619 | Added by the House | — | ₱3,000,000 | HB p. 802 |
| Construction (Completion) of Cabugan Multi Purpose Building, Barangay Cabugan, Buruanga, Aklan, 11.8507459, 121.9061591 | Added by the House | — | ₱3,000,000 | HB p. 802 |
| Construction (Completion) of Balusbos Multi Purpose Building, Barangay Balusbos, Buruanga, Aklan, 11.852577, 121.89164 | Added by the House | — | ₱3,000,000 | HB p. 803 |
| Construction (Completion) of Nagustan Multi Purpose Building, Barangay Nagustan, Nabas, Aklan, 11.8420224, 122.0662208 | Added by the House | — | ₱3,000,000 | HB p. 803 |
| Construction (Completion) of Buenasuerte Multi Purpose Building, Barangay Buenasuerte, Nabas, Aklan, 11.835281654866815, 122.07789014092859 | Added by the House | — | ₱3,000,000 | HB p. 803 |
| Construction (Completion) of Toledo Multi Purpose Building, Barangay Toledo, Nabas, Aklan, 11.847674932983596, 122.05243008367596 | Added by the House | — | ₱3,000,000 | HB p. 803 |
| Construction (Completion) of Laserna Multi Purpose Building, Barangay Laserna, Nabas, Aklan, 11.8394688,122.0364342 | Added by the House | — | ₱3,000,000 | HB p. 803 |
| Construction (Completion) of Tigpalas Multi Purpose Building, Barangay Tigpalas, Malinao, Aklan, 11.6416862, 122.2770456 | Added by the House | — | ₱3,000,000 | HB p. 803 |
| Construction (Completion) of Cogon Multi Purpose Building, Barangay Cogon, Malinao, Aklan, 11.6696436, 122.2772647 | Added by the House | — | ₱3,000,000 | HB p. 803 |
| Construction (Completion) of Sugnod Multi Purpose Building, Barangay Sugnod, Malinao, Aklan, 11.575780776373957, 122.25865452587375 | Added by the House | — | ₱3,000,000 | HB p. 803 |
| Construction (Completion) of San Ramon Multi Purpose Building, Barangay San Ramon, Malinao, Aklan, 11.6600784, 122.3007436 | Added by the House | — | ₱3,000,000 | HB p. 803 |
| Construction (Completion) of Bubog Multi Purpose Building, Barangay Bubog, Numancia, Aklan, 11.7145251, 122.3438436 | Added by the House | — | ₱3,000,000 | HB p. 803 |
| Construction (Completion) of Camanci Sur Multi Purpose Building, Barangay Camanci Sur, Numancia, Aklan, 11.716048, 122.3322898 | Added by the House | — | ₱3,000,000 | HB p. 804 |
| Construction (Completion) of Poblacion Multi Purpose Building, Barangay Poblacion, Numancia, Aklan, 11.7094084, 122.3257022 | Added by the House | — | ₱3,000,000 | HB p. 804 |
| Construction (Completion) of Balusbos Multi Purpose Building, Barangay Balusbos, Malay, Aklan, 11.90234183, 121.91832836 | Added by the House | — | ₱3,000,000 | HB p. 804 |
| Construction (Completion) of Nabaoy Multi Purpose Building, Barangay Nabaoy, Malay, Aklan, 11.888502713806114, 121.93356646077223 | Added by the House | — | ₱3,000,000 | HB p. 804 |
| Construction (Completion) of Castillo Multi Purpose Building, Barangay Castillo, Makato, Aklan, 11.719825073380642, 122.25519284487468 | Added by the House | — | ₱3,000,000 | HB p. 804 |
| Construction (Completion) of Tugas Multi Purpose Building, Barangay Tugas, Makato, Aklan, 11.7245778, 122.2905936 | Added by the House | — | ₱3,000,000 | HB p. 804 |
| Construction (Completion) of Habana Multi Purpose Building, Barangay Habana, Buruanga, Aklan, 11.86214, 121.900257 | Added by the House | — | ₱2,500,000 | HB p. 803 |
| Construction (Completion) of Nazareth Multi-Purpose Building, Barangay Nazareth, Buruanga, Aklan, 11.837328122701802, 121.90185924458164 | Added by the House | — | ₱2,500,000 | HB p. 803 |
| Construction (Completion) of Panilongan Multi-Purpose Building, Barangay Panilongan, Buruanga, Aklan, 11.7911099, 121.8679174 | Added by the House | — | ₱2,500,000 | HB p. 803 |
| Construction (Completion) of Santander Multi-Purpose Building, Barangay Santander, Buruanga, Aklan, 11.785214551013237, 121.8641779416959 | Added by the House | — | ₱2,500,000 | HB p. 803 |
| Construction (Completion) of Rizal Multi Purpose Building, Barangay Rizal, Ibajay, Aklan, 11.797253, 122.171725 | Added by the House | — | ₱2,500,000 | HB p. 803 |
| Construction (Completion) of Tondog Multi Purpose Building, Barangay Tondog, Tangalan, Aklan, 11.759539878431841, 122.26049329886752 | Added by the House | — | ₱2,500,000 | HB p. 803 |
| Construction (Completion) of Tabangka Multi Purpose Building, Barangay Tabangka, Numancia, Aklan, 11.6982863, 122.3179924 | Added by the House | — | ₱2,500,000 | HB p. 803 |
| Construction (Completion) of Badio Multi Purpose Building, Barangay Badio, Numancia, Aklan, 11.716048, 122.3322898 | Added by the House | — | ₱2,500,000 | HB p. 804 |
| Construction (Completion) of Sambiray Multi Purpose Building, Barangay Sambiray, Malay, Aklan, 11.915160350833954, 121.94900022104018 | Added by the House | — | ₱2,500,000 | HB p. 804 |
| Construction (Completion) of Baybay Multi Purpose Building, Barangay Baybay, Makato, Aklan, 11.7420905, 122.3097844 | Added by the House | — | ₱2,500,000 | HB p. 804 |
| Construction (Completion) of Multi-Purpose Building, Barangay Libas, Banga, Aklan | Added by the House | — | ₱2,450,000 | HB p. 804 |
NEP lines with no match in the House version (12)
- Aklan West Rd (Kalibo-Nabas ) - K0250 + 810 - K0252 + 020 · ₱47,143,000 · NEP PDF p. 272
- Aklan West Rd (Kalibo-Nabas ) - K0254 + 908 - K0255 + 674 · ₱41,073,000 · NEP PDF p. 272
- Aklan West Rd (Kalibo-Nabas ) (S00324PN ) - K0252 + 020 - K0252 + 350 · ₱26,650,000 · NEP PDF p. 272
- Aklan West Rd (Kalibo-Nabas ) - K0266 + 528 - K0267 + 249, K0267 + 282 - K0267 + · ₱24,352,000 · NEP PDF p. 272
- Aklan West Rd (Kalibo-Nabas ) - K0271 + 268 - K0271 + 484 · ₱5,282,000 · NEP PDF p. 272
- Construction of Road leading to Kalibo Slaughter House, Barangay Tinigao, Kalibo, Aklan · ₱5,000,000 · NEP PDF p. 523
- Construction of Road, Sitio Bonghoe, Barangay Torralba, Banga, Aklan · ₱5,000,000 · NEP PDF p. 524
- Construction of Road, Sitio Guinbaryuhan to Sitio Quinasayan, Barangay Ginictan, Altavas, Aklan · ₱5,000,000 · NEP PDF p. 524
- Construction of Road, Sitio Himbis, Barangay Lalab, Batan, Aklan · ₱5,000,000 · NEP PDF p. 524
- Construction of Road, Sitio Tugbungan, Barangay Candelaria, New Washington, Aklan · ₱5,000,000 · NEP PDF p. 524
- Construction (Completion) of Multi-Purpose Building, Covered Court / Evacuation Center at Barangay Casit-an, Libacao, Aklan · ₱5,000,000 · NEP PDF p. 635
- Construction (Completion) of Multi-Purpose Building, Covered Court / Evacuation Center, Barangay Quinasay-an, Altavas, Aklan · ₱5,000,000 · NEP PDF p. 635
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,625 contracts from 2016 to 2025 in public DPWH records (₱21.56B): 1,382 recorded as completed, 183 as ongoing. 1,544 have a satellite image check on file. Browse them.
11 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Revetment Wall along Ibajay River, Barangay Polo, Ibajay, Aklan 24GA0014 · Completed · ₱128.8MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Revetment Wall along Ibajay River, Barangay Polo, Ibajay, Aklan 23GA0039 · Completed · ₱86.8MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Revetment Wall along Aklan River, Brgy. Palale, Banga, Aklan 22GA0120 · Completed · ₱50.0MDuplicate or Near-Duplicate Projects
- Construction of Revetment Wall along Aklan River, Barangay Bakhaw Sur, Kalibo, Aklan 22GA0032 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Revetment Wall along Aklan River, Barangay Mobo, Kalibo, Aklan 22GA0034 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Flood Control / Revetment Wall along Aklan River, Barangay Mobo, Kalibo, Aklan 23GA0106 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Revetment Wall along Aklan River, Barangay Bakhaw Sur, Kalibo, Aklan 23GA0107 · Completed · ₱29.4MDuplicate or Near-Duplicate Projects
- Construction of Flood Control / Revetment Wall along Aklan River, Barangay Palale, Banga, Aklan 23GA0103 · Completed · ₱29.4MDuplicate or Near-Duplicate Projects
- Construction of Revetment Wall along Aklan River, Brgy. Mobo, Kalibo, Aklan 24GA0132 · Completed · ₱28.9MDuplicate or Near-Duplicate Projects
- Construction of Revetment Wall along Aklan River, Brgy. Palale, Banga, Aklan 24GA0133 · Completed · ₱28.9MDuplicate or Near-Duplicate Projects
- Construction of Revetment Wall along Ibajay River, Ibajay, Aklan (Package 3) 24GA0016 · Completed · ₱121.3MAwards Very Close to the Budget Ceiling · satellite before / after
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.
