Hon. Ronaldo V. Puno Representative, Antipolo City (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Antipolo City (First District) Dear Representative Ronaldo V. Puno: Good day. I live in Antipolo City (First District), and I would like to ask about some DPWH lines for the Rizal 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Pedestrian Overpass along Sumulong Highway Fronting the old Barangay Mambugan Hall, Barangay Mambugan, Antipolo City (Rizal 1st DEO): not in the NEP; ₱23,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 236; no matching NEP line for this office] 2. Construction of Flood Control Structure (Stone Masonry Riverwall) along the creek at Sitio lower Buhanginan, Barangay San Jose, Antipolo City (Rizal 1st DEO): NEP ₱10,000,000 → House ₱30,000,000 (up ₱20,000,000). [HB 10858 (3rd Reading) Vol. I-C, p. 341; NEP FY2027 Vol. II-B, PDF p. 383] 3. Improvement/ Rehabilitation of Flood Control Structure, Sucaben River going to Antipolo River, Station 1+700 - Station 1+750 Barangay Dela Paz, Barangay Muntindilaw and Barangay Sta. Cruz, Antipolo City, Rizal (Rizal 1st DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 341; no matching NEP line for this office] 4. Construction of Multi-Purpose Building, Broadway, Barangay Dela Paz, Antipolo City, 14.619260, 121.174490 (Rizal 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 778; no matching NEP line for this office] 5. Construction of Multi-Purpose Building, Country Homes, Barangay Muntindilaw, Antipolo City (Rizal 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 778; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Rizal 1st DEO: 1,556 contracts (2016–2025) in public DPWH records; 1,176 recorded as completed and 347 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Rehabilitation of Drainage in Parkplace Compound and Cementing of Dearborn, Burbank, Parklane and Sunrise Extension, Parkplace Compound, Brgy. San Isidro, Cainta, Rizal (22DN0132): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/a1c81de8-24ee-4509-a9a6-6e6bd852e222 - Construction of Flood Control Structure, Binayoyo (Downstream) Phase 3, Barangay Calawis, Antipolo City (23DN0034): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/c4dbeade-905f-495f-9fb3-00825be39503 - Construction of Flood Control Structure, Binayoyo (Downstream) Phase 4, Barangay Calawis, Antipolo City (23DN0035): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/762da239-1bf5-4d36-be7b-c235c0732d81 - Construction of Box Culvert with Approaches/Slope Protection, Sitio Kinapuin, Brgy. Calawis, Antipolo City (22DN0037): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/3e1ffd1d-1d45-485a-bedc-359bfa81d36b - Construction of Flood Control Structure (Upstream) Phase 4, Sitio Binayoyo, Brgy. Calawis, Antipolo City (22DN0027): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/0a5708bb-b37a-4cdb-9513-ccc8e450ec0f I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/antipolo-city-1st
Write your representative · FY2027 budget
Antipolo City (First District)
Representative: Ronaldo V. Puno · bills and roles · official House profile
Served by: Rizal 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
5 of 10 lines selected.
Letters for this district so far: 1 opened · 0 copied · 0 sent to email. Anonymous totals only; we store no names, emails or IP addresses.
Rizal 1st DEO
This district engineering office also serves Antipolo City (Second District); Rizal (First District). The budget lines below belong to the office, not to one district.
- House version (HB 10858)
- ₱1.73B
- 83 lines
- President’s NEP
- ₱1.75B
- 84 lines
- Added by the House
- 4
- ₱58.0M
- Changed / removed
- 1 / 5
- 78 lines unchanged
Lines that differ from the NEP (5)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Pedestrian Overpass along Sumulong Highway Fronting the old Barangay Mambugan Hall, Barangay Mambugan, Antipolo City | Added by the House | — | ₱23,000,000 | HB p. 236 |
| Construction of Flood Control Structure (Stone Masonry Riverwall) along the creek at Sitio lower Buhanginan, Barangay San Jose, Antipolo City | Increased | ₱10,000,000 | ₱30,000,000 | HB p. 341 NEP PDF p. 383 |
| Improvement/ Rehabilitation of Flood Control Structure, Sucaben River going to Antipolo River, Station 1+700 - Station 1+750 Barangay Dela Paz, Barangay Muntindilaw and Barangay Sta. Cruz, Antipolo City, Rizal | Added by the House | — | ₱15,000,000 | HB p. 341 |
| Construction of Multi-Purpose Building, Broadway, Barangay Dela Paz, Antipolo City, 14.619260, 121.174490 | Added by the House | — | ₱10,000,000 | HB p. 778 |
| Construction of Multi-Purpose Building, Country Homes, Barangay Muntindilaw, Antipolo City | Added by the House | — | ₱10,000,000 | HB p. 778 |
NEP lines with no match in the House version (5)
- Construction of Flood Mitigation Structure along Bulao River at Sitio Ondoy, Sitio San Verga, Sitio Dilain Palayan, Barangay Muntindilaw, Antipolo City (14.599294 ° N, 121.124592 ° E) · ₱50,000,000 · NEP PDF p. 384
- Construction of Drainage System along Filmore St ., Vermont Royale, Sta. 0 + 000 - Sta. 0 + 380 including outfall, Barangay Mayamot, Antipolo City · ₱15,000,000 · NEP PDF p. 383
- Construction of Drainage System along Golden Meadows Ave. Sta. 0 + 000 - Sta. 0 + 385, Golden Meadows Subd ., Barangay Mayamot, Antipolo City · ₱15,000,000 · NEP PDF p. 383
- Construction of Flood Control Structure (Stone Masonry Riverwall) at Banaba Creek, Kasipot Road, Barangay San Luis, Antipolo City · ₱10,000,000 · NEP PDF p. 383
- Construction of Flood Control Structure (Stone Masonry Riverwall) at Biong Creek, Kasipot Road, Barangay San Luis, Antipolo City · ₱10,000,000 · NEP PDF p. 383
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,556 contracts from 2016 to 2025 in public DPWH records (₱27.96B): 1,176 recorded as completed, 347 as ongoing. 1,466 have a satellite image check on file. Browse them.
14 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Rehabilitation of Drainage in Parkplace Compound and Cementing of Dearborn, Burbank, Parklane and Sunrise Extension, Parkplace Compound, Brgy. San Isidro, Cainta, Rizal 22DN0132 · Completed · ₱9.9MAwards Very Close to the Budget Ceiling
- Construction of Flood Control Structure, Binayoyo (Downstream) Phase 3, Barangay Calawis, Antipolo City 23DN0034 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Binayoyo (Downstream) Phase 4, Barangay Calawis, Antipolo City 23DN0035 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Box Culvert with Approaches/Slope Protection, Sitio Kinapuin, Brgy. Calawis, Antipolo City 22DN0037 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure (Upstream) Phase 4, Sitio Binayoyo, Brgy. Calawis, Antipolo City 22DN0027 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Sitio Libis Creek, Barangay San Jose, Antipolo City 23DN0067 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Sitio Upper Kilingan Phase 2, Barangay San Jose, Antipolo City 23DN0066 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Slope Protection Structure, Sitio San Ysiro, Brgy. San Jose, Antipolo City 22DN0068 · Completed · ₱48.9MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Pulang Panyo to Binayoyo (Phase 3), Brgy. San Jose, Antipolo City 22DN0028 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Calawis Creek, Barangay Calawis, Antipolo City 23DN0036 · Completed · ₱29.4MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure, Calawis Creek, Brgy. Calawis, Antipolo City 22DN0033 · Completed · ₱29.4MDuplicate or Near-Duplicate Projects
- Construction/Rehabilitation of Flood Control Structures at Bangiad Creek, Taytay, Rizal 22DN0078 · Completed · ₱19.6MDuplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.