← All districts

Write your representative · FY2027 budget

Apayao (Lone District)

Representative: Eleanor C. Bulut-Begtang · bills and roles · official House profile

Served by: Apayao 1st DEO; Apayao 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 31 lines selected.

Hon. Eleanor C. Bulut-Begtang
Representative, Apayao (Lone District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Apayao (Lone District)

Dear Representative Eleanor C. Bulut-Begtang:

Good day. I live in Apayao (Lone District), and I would like to ask about some DPWH lines for the Apayao 1st DEO and Apayao 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Concreting/Improvement of Sitio Bayugao, Barangay Turod-Barangay Lappa Road, Barangay Turod, Luna, Apayao (Apayao 1st DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 468; no matching NEP line for this office]
2. Construction of Multi-Purpose Building, Sitio Payanan, Barangay. Turod, Luna, Apayao (18.339919, 121.362451) (Apayao 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 682; no matching NEP line for this office]
3. Construction of flood control along Chico River Basin, Barren River, Sta. 41+800 - Sta. 42+300 Right Side, Barangay Talifugo, Conner, Apayao (Apayao 1st DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 327; no matching NEP line for this office]
4. Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road (Completion of Concrete Bridge), Barangay Nagbabalayan, Kabugao, Apayao (Apayao 1st DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 233; no matching NEP line for this office]
5. Construction of flood control along Chico River Basin, Barren River, Sta. 42+460 - Sta. 42+660 Left Side, Barangay Manag, Conner, Apayao (Apayao 1st DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 327; no matching NEP line for this office]
6. Concreting of Sitio Lalatngan, Barangay Sta. Filomena, Barangay Sta. Filomena, Calanasan, Apayao (Apayao 1st DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 468; no matching NEP line for this office]
7. Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) (S00695LZ) - Chainage 750 - Chainage 830, Chainage 1201- Chainage 1239, Chainage 1343.80 - Chainage 1384.80, Chainage 1388.80 - Chainage 1414.80, Chainage 1415 - Chainage 1476.80, Chainage 1743.70 - Chainage 1769.90, Chainage 2832.30 - Chainage 2846.30, Chainage 3044.10 - Chainage 3084.40 (LS), Chainage 3051.20 - Chainage 3084.40 (RS), Chainage 3279.90 - Chainage 3322.90, Chainage 3350.50 - Chainage 3395.50, Chainage 3438.40 - Chainage 3463.40, Chainage 3550.40 - Chainage 3584.40 (Apayao 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 169; no matching NEP line for this office]
8. Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) (S00695LZ) - Chainage 8458 - Chainage 8465, Chainage 8465 - Chainage 8571, Chainage 8851 - Chainage 8946 (Apayao 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 169; no matching NEP line for this office]
9. Concreting/Improvement of Luttuacan-Magabta-Bulu Road, Barangay Bulu, Kabugao, Apayao, Start 18.01416667, 121.19527778 End 18.02333333, 121.19416667 (Apayao 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 468; no matching NEP line for this office]
10. Construction of Multi-Purpose Building, Barangay, San Juan, Sta. Marcela, Apayao (18.240871, 121.47495) (Apayao 2nd DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 682; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Apayao 1st DEO: 420 contracts (2016–2026) in public DPWH records; 307 recorded as completed and 101 as ongoing.
- Apayao 2nd DEO: 711 contracts (2016–2026) in public DPWH records; 536 recorded as completed and 116 as ongoing.

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/apayao-lone

Letters for this district so far: 1 opened · 0 copied · 0 sent to email. Anonymous totals only; we store no names, emails or IP addresses.

Apayao 1st DEO

House version (HB 10858)
₱428.8M
26 lines
President’s NEP
₱206.4M
14 lines
Added by the House
15
₱292.4M
Changed / removed
0 / 3
11 lines unchanged
Lines that differ from the NEP (15)
LineChangeNEPHouseSources
Concreting/Improvement of Sitio Bayugao, Barangay Turod-Barangay Lappa Road, Barangay Turod, Luna, ApayaoAdded by the House—₱50,000,000HB p. 468
Construction of flood control along Chico River Basin, Barren River, Sta. 41+800 - Sta. 42+300 Right Side, Barangay Talifugo, Conner, ApayaoAdded by the House—₱40,000,000HB p. 327
Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road (Completion of Concrete Bridge), Barangay Nagbabalayan, Kabugao, ApayaoAdded by the House—₱30,000,000HB p. 233
Construction of flood control along Chico River Basin, Barren River, Sta. 42+460 - Sta. 42+660 Left Side, Barangay Manag, Conner, ApayaoAdded by the House—₱30,000,000HB p. 327
Concreting of Sitio Lalatngan, Barangay Sta. Filomena, Barangay Sta. Filomena, Calanasan, ApayaoAdded by the House—₱30,000,000HB p. 468
Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) (S00695LZ) - Chainage 750 - Chainage 830, Chainage 1201- Chainage 1239, Chainage 1343.80 - Chainage 1384.80, Chainage 1388.80 - Chainage 1414.80, Chainage 1415 - Chainage 1476.80, Chainage 1743.70 - Chainage 1769.90, Chainage 2832.30 - Chainage 2846.30, Chainage 3044.10 - Chainage 3084.40 (LS), Chainage 3051.20 - Chainage 3084.40 (RS), Chainage 3279.90 - Chainage 3322.90, Chainage 3350.50 - Chainage 3395.50, Chainage 3438.40 - Chainage 3463.40, Chainage 3550.40 - Chainage 3584.40Added by the House—₱20,000,000HB p. 169
Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) (S00695LZ) - Chainage 8458 - Chainage 8465, Chainage 8465 - Chainage 8571, Chainage 8851 - Chainage 8946Added by the House—₱20,000,000HB p. 169
Concreting/Improvement of Luttuacan-Magabta-Bulu Road, Barangay Bulu, Kabugao, Apayao, Start 18.01416667, 121.19527778 End 18.02333333, 121.19416667Added by the House—₱20,000,000HB p. 468
Construction of Multi-Purpose Building, Barangay Katablangan, Conner, ApayaoAdded by the House—₱10,000,000HB p. 682
Construction of Multi-Purpose Building, Barangay Nabuangan, Conner, ApayaoAdded by the House—₱10,000,000HB p. 682
Construction of Multi-Purpose Building, Barangay Cupis, Conner, ApayaoAdded by the House—₱10,000,000HB p. 682
Conner - Kabugao Rd - K0601+820 - K0601+926Added by the House—₱8,000,000HB p. 169
Construction of Multi-Purpose Building, Barangay Karagawan, Kabugao, Apayao (17.950264, 121 .186425)Added by the House—₱7,000,000HB p. 682
Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0599+430 - K0599+464Added by the House—₱5,400,000HB p. 169
Conner-Kabugao Rd - K0602 + 248 - K0602 + 260Added by the House—₱2,000,000HB p. 169
NEP lines with no match in the House version (3)
  • Improvement of Cabetayan-Karagawan Road, Barangay Karagawan, Kabugao, Apayao · ₱50,000,000 · NEP PDF p. 469
  • Construction of Multi-Purpose Building (MPB ), (Barangay Hall ), Barangay Caglayan, Conner, Apayao · ₱10,000,000 · NEP PDF p. 581
  • Construction of Multi-Purpose Building (MPB ), (Barangay Hall ), Barangay Madduang, Kabugao, Apayao · ₱10,000,000 · NEP PDF p. 581

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

420 contracts from 2016 to 2026 in public DPWH records (₱7.68B): 307 recorded as completed, 101 as ongoing. 333 have a satellite image check on file. Browse them.

Apayao 2nd DEO

House version (HB 10858)
₱882.0M
42 lines
President’s NEP
₱772.0M
35 lines
Added by the House
10
₱135.0M
Changed / removed
0 / 3
32 lines unchanged
Lines that differ from the NEP (10)
LineChangeNEPHouseSources
Construction of Multi-Purpose Building, Sitio Payanan, Barangay. Turod, Luna, Apayao (18.339919, 121.362451)Added by the House—₱50,000,000HB p. 682
Construction of Multi-Purpose Building, Barangay, San Juan, Sta. Marcela, Apayao (18.240871, 121.47495)Added by the House—₱15,000,000HB p. 682
Construction of Multi-Purpose Building, Barangay Sta. Elena, Calanasan, ApayaoAdded by the House—₱15,000,000HB p. 683
Construction of Multi-Purpose Building, Barangay. Tanglagan, Calansasan, Apayao (18.379673, 120.964029)Added by the House—₱10,000,000HB p. 682
Construction of Multi-Purpose Building, Payanan, Barangay San Gregorio, Luna, Apayao (18.307897, 121.355556)Added by the House—₱10,000,000HB p. 682
Construction of Multi-Purpose Building, Barangay Lt. Balag, Pudtol, ApayaoAdded by the House—₱10,000,000HB p. 683
Construction (Completion) of Multi-Purpose Building, Barangay San Luis, udtol, ApayaoAdded by the House—₱10,000,000HB p. 683
Construction of Water System Andres Sipagarra Lying-in Clinic (ASLIC), Namaltugan, Calanasan, ApayaoAdded by the House—₱5,000,000HB p. 372
Construction (Completion) of Multi-Purpose Building, Barangay Lower Maton, Pudtol, ApayaoAdded by the House—₱5,000,000HB p. 682
Construction of Multi-Purpose Building, Kilang, Barangay Butao, Calanasan, Apayao (18.075447, 120.933117)Added by the House—₱5,000,000HB p. 682
NEP lines with no match in the House version (3)
  • Construction of Multi-Purpose Building (Department of Trade and Industry Provincial Office ), Sitio Payanan, San Gregorio, Luna, Apayao · ₱15,000,000 · NEP PDF p. 581
  • Construction of Water Sytem (Spring Development ), Andres Sipagarra Lying-in Clinic (ASLIC ), Namaltugan, Calanasan · ₱5,000,000 · NEP PDF p. 408
  • Construction (Completion) of Multi-Purpose Building (MPB, Gymnasium ), Barangay Lower Maton, Pudtol, Apayao · ₱5,000,000 · NEP PDF p. 581

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

711 contracts from 2016 to 2026 in public DPWH records (₱16.33B): 536 recorded as completed, 116 as ongoing. 623 have a satellite image check on file. Browse them.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.