Baguio City (Lone District)

Representative: Mauricio G. Domogan · bills and roles · official House profile

Served by: Baguio City DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 12 lines selected.

Hon. Mauricio G. Domogan
Representative, Baguio City (Lone District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Baguio City (Lone District)

Dear Representative Mauricio G. Domogan:

Good day. I live in Baguio City (Lone District), and I would like to ask about some DPWH lines for the Baguio City DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202 (Baguio City DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 221; no matching NEP line for this office]
2. Rehabilitation of Road including Drainage Structure, Salud Mitra Barangay, Baguio City (Site 1, Sta. 0+000 - Sta. 0+225), (Site 2, Sta. 0+000 - Sta. 0+095), (Site 3, Sta. 0+000 - Sta. 0+215) (Baguio City DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 469; no matching NEP line for this office]
3. Rehabilitation of Road at Pinesville Road, Fort Del Pilar Barangay, Section 1: Sta. 0+590 - Sta. 0+687, Section 2: Sta. 0+0000 - Sta. 0+255, Section 3: Sta. 0+000 - Sta. 0+278, Section 4: Sta. 0+000 - Sta. 0+100, Baguio City (Baguio City DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 468; no matching NEP line for this office]
4. Construction of Road including Slope Protection, Honeymoon-Holyghost Barangay to Holyhghost Extension Barangay, Baguio City (Sta. 0+270 - Sta. 0+465) (Baguio City DEO): not in the NEP; ₱28,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 468; no matching NEP line for this office]
5. Construction of Multi-purpose Building at Middle Quirino Hill, Baguio City (Baguio City DEO): not in the NEP; ₱23,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 683; no matching NEP line for this office]
6. Construction of Drainage System from Upper Rock Quarry going down to City Camp Lagoon Sta. 0+000 - Sta. 0+220, Baguio City (Baguio City DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 327; no matching NEP line for this office]
7. Construction of Slope Protection Structure along Main Creek, Balsigan Barangay, Sta. 0+000 - Sta. 0+234, Baguio City (Baguio City DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 327; no matching NEP line for this office]
8. Construction of Slope Protection Structure from City Camp Proper Barangay going to Queen of Peace Creek, Sta. 0+000 - Sta. 0+210, Baguio City (Baguio City DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 327; no matching NEP line for this office]
9. Rehabilitation of Road including Drainage Structure, Bado Dangwa Road at Cresencia Village Barangay, Baguio City (Sta. 0+000 - Sta. 0+395) (Baguio City DEO): not in the NEP; ₱11,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 468; no matching NEP line for this office]
10. Construction of Multi-purpose Facilities at Quirino Hill East Barangay Baguio City (Baguio City DEO): not in the NEP; ₱7,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 683; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Baguio City DEO: 878 contracts (2016–2025) in public DPWH records; 784 recorded as completed and 57 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Construction of Flood Mitigation Facility/Drainage System along Bued River (Tributaries) Sta. 0+190 - Sta. 0+640, Baguio City (22PD0018): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/b1358a32-0914-45c1-890c-e3a857867b12
- Construction of Flood Mitigation Facility/Drainage System along Bued River (Tributaries), Sta. 0+030 - Sta. 0+530, Baguio City (22PD0019): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/2481c8cf-8517-4118-a168-64f2e4489bbb
- Construction of Flood Mitigation Facility/Drainage System along Kisad Road to Lake Drive 1 to Abad Santos Drive, Sta. 0+000 - Sta. 0+463, Baguio City (22PD0020): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/9e9df9bd-c6c8-42e0-893b-71163394a377

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/baguio-city-lone

Baguio City DEO

House version (HB 10858)
₱709.2M
36 lines
President’s NEP
₱479.2M
26 lines
Added by the House
11
₱245.0M
Changed / removed
0 / 1
25 lines unchanged
Lines that differ from the NEP (11)
LineChangeNEPHouseSources
Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202Added by the House—₱40,000,000HB p. 221
Rehabilitation of Road including Drainage Structure, Salud Mitra Barangay, Baguio City (Site 1, Sta. 0+000 - Sta. 0+225), (Site 2, Sta. 0+000 - Sta. 0+095), (Site 3, Sta. 0+000 - Sta. 0+215)Added by the House—₱40,000,000HB p. 469
Rehabilitation of Road at Pinesville Road, Fort Del Pilar Barangay, Section 1: Sta. 0+590 - Sta. 0+687, Section 2: Sta. 0+0000 - Sta. 0+255, Section 3: Sta. 0+000 - Sta. 0+278, Section 4: Sta. 0+000 - Sta. 0+100, Baguio CityAdded by the House—₱30,000,000HB p. 468
Construction of Road including Slope Protection, Honeymoon-Holyghost Barangay to Holyhghost Extension Barangay, Baguio City (Sta. 0+270 - Sta. 0+465)Added by the House—₱28,000,000HB p. 468
Construction of Multi-purpose Building at Middle Quirino Hill, Baguio CityAdded by the House—₱23,000,000HB p. 683
Construction of Drainage System from Upper Rock Quarry going down to City Camp Lagoon Sta. 0+000 - Sta. 0+220, Baguio CityAdded by the House—₱20,000,000HB p. 327
Construction of Slope Protection Structure along Main Creek, Balsigan Barangay, Sta. 0+000 - Sta. 0+234, Baguio CityAdded by the House—₱20,000,000HB p. 327
Construction of Slope Protection Structure from City Camp Proper Barangay going to Queen of Peace Creek, Sta. 0+000 - Sta. 0+210, Baguio CityAdded by the House—₱20,000,000HB p. 327
Rehabilitation of Road including Drainage Structure, Bado Dangwa Road at Cresencia Village Barangay, Baguio City (Sta. 0+000 - Sta. 0+395)Added by the House—₱11,000,000HB p. 468
Construction of Multi-purpose Facilities at Quirino Hill East Barangay Baguio CityAdded by the House—₱7,000,000HB p. 683
Rehabilitation of Hilltop Street along Upper and Lower Magsaysay Barangay and Padre Zamora Barangay, Baguio City (Sta. 0+000 - Sta. 0+065)Added by the House—₱6,000,000HB p. 468
NEP lines with no match in the House version (1)
  • Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 059.5, Baguio City · ₱15,000,000 · NEP PDF p. 290

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

878 contracts from 2016 to 2025 in public DPWH records (₱11.02B): 784 recorded as completed, 57 as ongoing. 795 have a satellite image check on file. Browse them.

3 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.