← All districts

Write your representative · FY2027 budget

Bataan (Second District)

Representative: Albert S. Garcia · bills and roles · official House profile

Served by: Bataan 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 22 lines selected.

Hon. Albert S. Garcia
Representative, Bataan (Second District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Bataan (Second District)

Dear Representative Albert S. Garcia:

Good day. I live in Bataan (Second District), and I would like to ask about some DPWH lines for the Bataan 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Construction of Multi-Purpose Facility, Barangay Tuyo, Balanga City, Bataan (14.687125 , 120.5304472) (Bataan 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 718; no matching NEP line for this office]
2. Rehabilitation of Multi-Purpose Building, Barangay Bagong Silang, City of Balanga, Bataan (14.678292, 120.519241) (Bataan 2nd DEO): not in the NEP; ₱45,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 718; no matching NEP line for this office]
3. Construction of Road, Barangay Tuyo, City of Balanga, Bataan, 0+000-0+610, 0+000- 0+222 (Bataan 2nd DEO): not in the NEP; ₱43,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 498; no matching NEP line for this office]
4. Construction of Multi-Purpose Facility, Barangay Saint Francis II, Limay, Bataan. (14.574760, 120.587956) (Bataan 2nd DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 718; no matching NEP line for this office]
5. Completion of Multi-Purpose Building, Barangay Tenejero, Balanga City, Bataan, (14.676933, 120.530969) (Bataan 2nd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 718; no matching NEP line for this office]
6. Construction (Completion) of Multi-Purpose Facility, Barangay Bagong Silang, City of Balanga, Bataan, (14.678126, 120.519999) (Bataan 2nd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 718; no matching NEP line for this office]
7. Construction of Multi-Purpose Building, Barangay Cupang North, City of Balanga, Bataan (14.675925,120.54343333333333) (Bataan 2nd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 718; no matching NEP line for this office]
8. Construction of Multi-Purpose Building, Lote Pto. Rivas, Balanga City, Bataan (14.688108, 120.550361) (Bataan 2nd DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 718; no matching NEP line for this office]
9. Construction of Multi-purpose Building, Tenejero, Balanga City, Bataan (14.676348024851075, 120.53045306352763) (Bataan 2nd DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 718; no matching NEP line for this office]
10. Rehabilitation of Drainage Barangay Bagong Silang (Bliss Section), Balanga City, Bataan (Bataan 2nd DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 330; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Bataan 2nd DEO: 853 contracts (2016–2026) in public DPWH records; 695 recorded as completed and 142 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Construction of Revetment at Pandam River, Phase 2, Orion, Bataan (22CB0086): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/8a8bbd87-ed01-4d7b-a5d1-ed89031f4239
- Construction of Flood Control Structure, Dangcol, Balanga City, Bataan (23CB0008): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/1f5e7723-ac68-41d0-afef-68651d6baa46
- Construction of Flood Control Structure along Tenejero River , Barangay Tenejero, Balanga City, Bataan (24CB0065): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/f862906f-a65b-4e1c-9769-bdd2505c7b73
- Construction of Flood Control Structure along Tenejero River (Camacho-Tenejero Bridge), Balanga City, Bataan (24CB0071): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/369676f2-34f6-44c6-aa25-855c2a1514f9

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/bataan-2nd

Bataan 2nd DEO

House version (HB 10858)
₱679.4M
42 lines
President’s NEP
₱349.4M
22 lines
Added by the House
22
₱375.0M
Changed / removed
0 / 0
20 lines unchanged
Lines that differ from the NEP (22)
LineChangeNEPHouseSources
Construction of Multi-Purpose Facility, Barangay Tuyo, Balanga City, Bataan (14.687125 , 120.5304472)Added by the House—₱50,000,000HB p. 718
Rehabilitation of Multi-Purpose Building, Barangay Bagong Silang, City of Balanga, Bataan (14.678292, 120.519241)Added by the House—₱45,000,000HB p. 718
Construction of Road, Barangay Tuyo, City of Balanga, Bataan, 0+000-0+610, 0+000- 0+222Added by the House—₱43,000,000HB p. 498
Construction of Multi-Purpose Facility, Barangay Saint Francis II, Limay, Bataan. (14.574760, 120.587956)Added by the House—₱40,000,000HB p. 718
Completion of Multi-Purpose Building, Barangay Tenejero, Balanga City, Bataan, (14.676933, 120.530969)Added by the House—₱30,000,000HB p. 718
Construction (Completion) of Multi-Purpose Facility, Barangay Bagong Silang, City of Balanga, Bataan, (14.678126, 120.519999)Added by the House—₱20,000,000HB p. 718
Construction of Multi-Purpose Building, Barangay Cupang North, City of Balanga, Bataan (14.675925,120.54343333333333)Added by the House—₱20,000,000HB p. 718
Construction of Multi-Purpose Building, Lote Pto. Rivas, Balanga City, Bataan (14.688108, 120.550361)Added by the House—₱15,000,000HB p. 718
Construction of Multi-purpose Building, Tenejero, Balanga City, Bataan (14.676348024851075, 120.53045306352763)Added by the House—₱15,000,000HB p. 718
Rehabilitation of Drainage Barangay Bagong Silang (Bliss Section), Balanga City, BataanAdded by the House—₱10,000,000HB p. 330
Construction of Multi-Purpose Hall at Josefaville, Barangay Panilao, Pilar, Bataan (14.674239, 120.550954)Added by the House—₱10,000,000HB p. 718
Construction of Multi-Purpose Building (Senior Citizen Hall Learning Hub), Barangay Lusungan, Orion, Bataan (14.619804, 120.584070)Added by the House—₱10,000,000HB p. 718
Rehabilitation of Multi-Purpose Building, Barangay Palihan, Hermosa, Bataan (14.8422, 120.4752)Added by the House—₱10,000,000HB p. 719
Construction of Multi-Purpose Building, Barangay Almacen, Hermosa, BataanAdded by the House—₱10,000,000HB p. 719
Construction (Completion) of Multi-Purpose Building, Barangay Tuyo, City of Balanga, Bataan (14.686264, 120.528526)Added by the House—₱9,000,000HB p. 719
Rehabilitation of Multi-Purpose Building, Barangay Panilao, Pilar, Bataan (14.668490, 120.553416)Added by the House—₱8,000,000HB p. 719
Construction of Multi-Purpose Facility at Greater Bani MPC, Barangay Cataning, Balanga City, Bataan (14.66015278, 120.5086833)Added by the House—₱7,000,000HB p. 718
Rehabilitation of Multi-Purpose Building, Tenejero, Balanga City, Bataan (14.676774, 120.523522)Added by the House—₱5,000,000HB p. 718
Rehabilitation of Multi-Purpose Building, Barangay Cupang Proper, City of Balanga, Bataan (14.668382, 120.543316)Added by the House—₱5,000,000HB p. 719
Rehabilitation of Multi-Purpose Building, Barangay Talisay, City of Balanga, Bataan (14.679982, 120.546084)Added by the House—₱5,000,000HB p. 719
Rehabilitation of Multi-Purpose Building, Barangay Judge Roman Cruz Sr., Hermosa, Bataan (14.8343, 120.4883)Added by the House—₱5,000,000HB p. 719
Rehabilitation/Completion of Multi-Purpose Building, Barangay Cupang West, Balanga City, Bataan (14.669558,120.541736)Added by the House—₱3,000,000HB p. 718

Past DPWH contracts under this office

853 contracts from 2016 to 2026 in public DPWH records (₱20.48B): 695 recorded as completed, 142 as ongoing. 799 have a satellite image check on file. Browse them.

4 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.