Hon. Leandro Legarda Leviste Representative, Batangas (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Batangas (First District) Dear Representative Leandro Legarda Leviste: Good day. I live in Batangas (First District), and I would like to ask about some DPWH lines for the Batangas 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Balayan-Balibago Rd - K0106 + (-216) - K0106 + 785 - K0107 + 000, K0108 + 500 - K0109 + 308, K0112 + 660 - K0112 + 669.30 (Batangas 1st DEO): not in the NEP; ₱43,786,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 123; no matching NEP line for this office] 2. Nasugbu-Lian-Calatagan Rd - K0122 + 000 - K0123 + 000 (Batangas 1st DEO): not in the NEP; ₱21,613,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 123; no matching NEP line for this office] 3. Balayan-Balibago Rd - K0116 + 000 - K0117 + 000 (Batangas 1st DEO): not in the NEP; ₱21,592,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 123; no matching NEP line for this office] 4. Balayan-Balibago Rd - K0109 + 309 - K0110 + 306 (Batangas 1st DEO): not in the NEP; ₱21,527,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 123; no matching NEP line for this office] 5. Nasugbu-Lian-Calatagan Rd - K0112 + 361 - K0112 + 910 (Batangas 1st DEO): not in the NEP; ₱11,866,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 123; no matching NEP line for this office] 6. Balayan-Balibago Rd - K0110 + 491.70 - K0111 + 000 (Batangas 1st DEO): not in the NEP; ₱10,943,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 123; no matching NEP line for this office] 7. Construction of Multi-Purpose Building, Barangay Balitoc, Calatagan, Batangas, 13.851913, 120.628560 (Batangas 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 742; no matching NEP line for this office] 8. Construction of Multi-Purpose Building, Nasugbu, Batangas, 14.058116, 120.659252 (Batangas 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 742; no matching NEP line for this office] 9. Construction of Multi-Purpose Building, Lemery, Batangas, 13.9104, 120.8816 (Batangas 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 742; no matching NEP line for this office] 10. Construction of Multi-Purpose Building, Barangay Mayasang Lemery Batangas, (Batangas 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 742; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Batangas 1st DEO: 1,679 contracts (2016–2025) in public DPWH records; 1,476 recorded as completed and 170 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Seawall, Brgy. Sinisian East (Phase II), Lemery, Batangas (22DB0030): Awards Very Close to the Budget Ceiling; Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/86ac4f98-06c1-4418-afde-833caac41bd9 - Construction of Seawall at Barangay Sinisian East, Lemery, Batangas (22DB0022): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/f0cbe381-38c2-458c-9f52-aa78e7bbcc3b - Rehabilitation of Slope Protection Structure along Lian River, Lian Side (Downstream), Lian, Batangas (24DB0106): Schedule / Date Inconsistencies. https://lovethephilippines.com/projects/c8b46032-c345-4a10-9cbc-f09c8f566360 - Construction of Seawall, Brgy. Carrenahan, Balayan, Batangas (22DB0029): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/1d15cccc-a658-45ea-a1e7-a9c86cc3c66d I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/batangas-1st
Write your representative · FY2027 budget
Batangas (First District)
Representative: Leandro Legarda Leviste · bills and roles · official House profile
Served by: Batangas 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 15 lines selected.
Batangas 1st DEO
- House version (HB 10858)
- ₱235.3M
- 14 lines
- President’s NEP
- ₱122.0M
- 7 lines
- Added by the House
- 11
- ₱176.3M
- Changed / removed
- 0 / 4
- 3 lines unchanged
Lines that differ from the NEP (11)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Balayan-Balibago Rd - K0106 + (-216) - K0106 + 785 - K0107 + 000, K0108 + 500 - K0109 + 308, K0112 + 660 - K0112 + 669.30 | Added by the House | — | ₱43,786,000 | HB p. 123 |
| Nasugbu-Lian-Calatagan Rd - K0122 + 000 - K0123 + 000 | Added by the House | — | ₱21,613,000 | HB p. 123 |
| Balayan-Balibago Rd - K0116 + 000 - K0117 + 000 | Added by the House | — | ₱21,592,000 | HB p. 123 |
| Balayan-Balibago Rd - K0109 + 309 - K0110 + 306 | Added by the House | — | ₱21,527,000 | HB p. 123 |
| Nasugbu-Lian-Calatagan Rd - K0112 + 361 - K0112 + 910 | Added by the House | — | ₱11,866,000 | HB p. 123 |
| Balayan-Balibago Rd - K0110 + 491.70 - K0111 + 000 | Added by the House | — | ₱10,943,000 | HB p. 123 |
| Construction of Multi-Purpose Building, Barangay Balitoc, Calatagan, Batangas, 13.851913, 120.628560 | Added by the House | — | ₱10,000,000 | HB p. 742 |
| Construction of Multi-Purpose Building, Nasugbu, Batangas, 14.058116, 120.659252 | Added by the House | — | ₱10,000,000 | HB p. 742 |
| Construction of Multi-Purpose Building, Lemery, Batangas, 13.9104, 120.8816 | Added by the House | — | ₱10,000,000 | HB p. 742 |
| Construction of Multi-Purpose Building, Barangay Mayasang Lemery Batangas, | Added by the House | — | ₱10,000,000 | HB p. 742 |
| Construction of Multi-Purpose Building (Senior Citizens Center), Sitio Caylungon, Barangay Baynilad, Nasugbu, Batangas | Added by the House | — | ₱5,000,000 | HB p. 742 |
NEP lines with no match in the House version (4)
- Calbangan Br . (Bo0053LZ) along Palico-Balayan-Batangas Rd · ₱48,000,000 · NEP PDF p. 328
- Construction of Multi-Purpose Building (Senior Citizens Center ), Barangay Caylaway, Nasugbu, Batangas · ₱5,000,000 · NEP PDF p. 608
- Construction of Multi-Purpose Building (Senior Citizens Center ), Barangay Cogunan, Nasugbu, Batangas · ₱5,000,000 · NEP PDF p. 608
- Construction of Multi-Purpose Building (Senior Citizens Center ), Barangay Looc, Nasugbu, Batangas · ₱5,000,000 · NEP PDF p. 608
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,679 contracts from 2016 to 2025 in public DPWH records (₱24.73B): 1,476 recorded as completed, 170 as ongoing. 1,366 have a satellite image check on file. Browse them.
4 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Seawall, Brgy. Sinisian East (Phase II), Lemery, Batangas 22DB0030 · Completed · ₱49.0MAwards Very Close to the Budget Ceiling; Duplicate or Near-Duplicate Projects
- Construction of Seawall at Barangay Sinisian East, Lemery, Batangas 22DB0022 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Rehabilitation of Slope Protection Structure along Lian River, Lian Side (Downstream), Lian, Batangas 24DB0106 · Completed · ₱148.5MSchedule / Date Inconsistencies · satellite before / after
- Construction of Seawall, Brgy. Carrenahan, Balayan, Batangas 22DB0029 · Completed · ₱49.0MAwards Very Close to the Budget Ceiling
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.
