← All districts

Write your representative · FY2027 budget

Bulacan (Fifth District)

Representative: Agatha "Agay" Cruz · bills and roles · official House profile

Served by: Bulacan 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 24 lines selected.

Hon. Agatha "Agay" Cruz
Representative, Bulacan (Fifth District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Bulacan (Fifth District)

Dear Representative Agatha "Agay" Cruz:

Good day. I live in Bulacan (Fifth District), and I would like to ask about some DPWH lines for the Bulacan 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Rehabilitation of Santol - Bunsuran II Bridge, Sta. 3+580 - Sta. 3+596, Bunsuran II, Pandi, Bulacan (120.923015, 14.856319) (Bulacan 1st DEO): not in the NEP; ₱60,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 500; no matching NEP line for this office]
2. Pulilan-Calumpit Rd - K43+900 - K44+770, Bulacan (Bulacan 1st DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 184; no matching NEP line for this office]
3. Completion of Multi-Purpose Building, Poblacion, Guiguinto, Bulacan (120.878387, 14.82565) (Bulacan 1st DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 721; no matching NEP line for this office]
4. Construction (Completion) of Multi-Purpose Building San Roque, Paombong, Bulacan (Bulacan 1st DEO): not in the NEP; ₱45,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 722; no matching NEP line for this office]
5. Construction of Multi-Purpose Building, Poblacion, Guiguinto, Bulacan (120.880145, 14.825185) (Bulacan 1st DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 721; no matching NEP line for this office]
6. Construction of Multi-Purpose Building, Barangay Dampol 1st, Pulilan, Bulacan (Bulacan 1st DEO): not in the NEP; ₱35,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 721; no matching NEP line for this office]
7. Rehabilitiation of Multi-Purpose Building, Longos, Balagtas, Bulacan (120.910976, 14.819881) (Bulacan 1st DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 721; no matching NEP line for this office]
8. Construction of Multi-Purpose Building, S. Osmeña St., Poblacion, Pandi, Bulacan (120.953072, 14.858892) (Bulacan 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 721; no matching NEP line for this office]
9. Construction of Multi-Purpose Building, Barangay Bulihan, City of Malolos, Bulacan, 14.860758, 120.811636 (Bulacan 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 721; no matching NEP line for this office]
10. Construction of Multi-Purpose Building, Pulong Gubat, Balagtas, Bulacan (Bulacan 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 721; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Bulacan 1st DEO: 3,575 contracts (2016–2025) in public DPWH records; 2,770 recorded as completed and 570 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Construction of Flood Control Project and Rehabilitation of Waterways along Angat River Brgy. Parulan Plaridel, Bulacan (23CC0280): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/7a5dda43-fffc-49ca-9098-999c1d0b6807
- Construction of Flood Control Structure along Bagbag Creek, Barangay Sta. Cruz, Guiguinto, Bulacan (K003+772 to K003+922) (23CC0212): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/d37f7ebe-6be8-41ee-8bfb-f0d8677ea0d6
- Construction of Riverbank Protection Structure at Barangay Malis (Phase III), Guiguinto, Bulacan (24CC0055): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/0b970c24-4c12-4e39-84da-a4bac9e1229c
- Construction of Flood Control Structure along Angat River, Sipat Section, Plaridel, Bulacan (24CC0144): Schedule / Date Inconsistencies; Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/9827e7e7-32a3-4bf7-a81f-f0bcf52f1cd2
- Construction of Riverbank Protection Structure along Balagtas River, Barangay Santol, Balagtas, Bulacan (24CC0001): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/7716518e-0085-42e5-baab-e4cad2a919de

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/bulacan-5th

Bulacan 1st DEO

This district engineering office also serves Bulacan (First District); Bulacan (Second District). The budget lines below belong to the office, not to one district.

House version (HB 10858)
₱2.63B
148 lines
President’s NEP
₱2.33B
140 lines
Added by the House
15
₱433.0M
Changed / removed
2 / 7
131 lines unchanged
Lines that differ from the NEP (17)
LineChangeNEPHouseSources
Rehabilitation of Santol - Bunsuran II Bridge, Sta. 3+580 - Sta. 3+596, Bunsuran II, Pandi, Bulacan (120.923015, 14.856319)Added by the House—₱60,000,000HB p. 500
Pulilan-Calumpit Rd - K43+900 - K44+770, BulacanAdded by the House—₱50,000,000HB p. 184
Completion of Multi-Purpose Building, Poblacion, Guiguinto, Bulacan (120.878387, 14.82565)Added by the House—₱50,000,000HB p. 721
Construction (Completion) of Multi-Purpose Building San Roque, Paombong, BulacanAdded by the House—₱45,000,000HB p. 722
Construction of Multi-Purpose Building, Poblacion, Guiguinto, Bulacan (120.880145, 14.825185)Added by the House—₱40,000,000HB p. 721
Construction of Multi-Purpose Building, Barangay Dampol 1st, Pulilan, BulacanAdded by the House—₱35,000,000HB p. 721
Rehabilitiation of Multi-Purpose Building, Longos, Balagtas, Bulacan (120.910976, 14.819881)Added by the House—₱30,000,000HB p. 721
Construction of Multi-Purpose Building, S. Osmeña St., Poblacion, Pandi, Bulacan (120.953072, 14.858892)Added by the House—₱20,000,000HB p. 721
Construction of Multi-Purpose Building, Barangay Bulihan, City of Malolos, Bulacan, 14.860758, 120.811636Added by the House—₱20,000,000HB p. 721
Construction of Multi-Purpose Building, Pulong Gubat, Balagtas, BulacanAdded by the House—₱20,000,000HB p. 721
Construction of Multi-Purpose Building, Barangay Peñabatan, Pulilan, BulacanMatched to the NEP by a close title, not an exact one.Increased₱15,000,000₱35,000,000HB p. 721
NEP PDF p. 597
Construction of Multi-Purpose Building, Barangay Poblacion, Pulilan, BulacanMatched to the NEP by a close title, not an exact one.Increased₱15,000,000₱35,000,000HB p. 722
NEP PDF p. 597 (scan reading; check the page)
Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, BulacanA similar title appears in another NEP listing; check before citing.Added by the House—₱15,000,000HB p. 722
Construction of Multi-Purpose Building at Barangay Tibag, Pulilan, BulacanA similar title appears in another NEP listing; check before citing.Added by the House—₱15,000,000HB p. 722
Rehabilitation of Road including Drainage, Dela Cruz and Manalac Street, Poblacion, Guiguinto, BulacanAdded by the House—₱14,000,000HB p. 500
Construction of Road and Drainage Canal at Barangay Paltao, Pulilan, BulacanAdded by the House—₱13,000,000HB p. 500
Construction of Multi-Purpose Building, San Juan, Balagtas, Bulacan (120.910976, 14.812501)Added by the House—₱6,000,000HB p. 721
NEP lines with no match in the House version (7)
  • Construction (Completion) of Paombong Gymnasium San Roque, Paombong, Bulacan · ₱45,000,000 · NEP PDF p. 596
  • Construction (Completion) of Multi-Purpose Building, Barangay Dampol, Pulilan, Bulacan · ₱35,000,000 · NEP PDF p. 596
  • Construction (Completion) of Multi-Purpose Building, Barangay Pe ñ batan, Pulilan, Bulacan · ₱35,000,000 · NEP PDF p. 596
  • Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan · ₱35,000,000 · NEP PDF p. 596
  • Construction of Road at Barangay Paltao, Pulilan, Bulacan · ₱13,000,000 · NEP PDF p. 486
  • Plaridel Bypass Road · ₱6,298,000 · NEP PDF p. 134
  • Tabang, Malolos, Bulacan · ₱6,091,000 · NEP PDF p. 134

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

3,575 contracts from 2016 to 2025 in public DPWH records (₱99.95B): 2,770 recorded as completed, 570 as ongoing. 3,029 have a satellite image check on file. Browse them.

137 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.