Hon. Miguel Luis R. Villafuerte Representative, Camarines Sur (Fifth District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Camarines Sur (Fifth District) Dear Representative Miguel Luis R. Villafuerte: Good day. I live in Camarines Sur (Fifth District), and I would like to ask about some DPWH lines for the Camarines Sur 5th DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Concrete Bridge, Zone Mississippi, Barangay Sagrada, Iriga City, Camarines Sur (Camarines Sur 5th DEO): not in the NEP; ₱40,025,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 555; no matching NEP line for this office] 2. Construction of Concrete Bridge, Zone Montañoza, Barangay Sagrada, Iriga City, Camarines Sur (Camarines Sur 5th DEO): not in the NEP; ₱38,054,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 555; no matching NEP line for this office] 3. Road Concreting of J. Mrtinez Highway, San Rafael, Iriga City. (Camarines Sur 5th DEO): not in the NEP; ₱20,602,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 555; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Camarines Sur 5th DEO: 891 contracts (2016–2025) in public DPWH records; 809 recorded as completed and 66 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Mitigation Structure along Barit River, Brgy. Antipolo Old Section, Nabua, Camarines Sur (23FN0051): Awards Very Close to the Budget Ceiling; Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/2cd1f853-df3b-45d7-80dc-2c087b242950 - Construction of Flood Mitigation Structure along Barit River, Antipolo Old Section, Barangay Antipolo, Nabua, Camarines Sur (24FN0008): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/6a7ac1c1-e8c9-475f-89c5-8d852c7d0c87 - Construction of Bank Protection Structure along Pawili River, Brgy. Fabrica-Salvacion Section, Bula, Camarines Sur (23FN0033): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/8b2dc889-af0c-4d39-8cc0-d095efaa48b4 - Construction of Bank Protection Structure along Pawili River, Brgy. Fabrica Section, Bula, Camarines Sur (23FN0024): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/a2c62f2a-1735-4aab-aa88-4693bfc666a6 - Construction of Riverbank Protection Structure along Barit River, Barangay Lourdes Section, Buhi, Camarines Sur (24FN0013): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/d065f5cd-fd2b-43d4-85a5-cf7b0b9575d1 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/camarines-sur-5th
Write your representative · FY2027 budget
Camarines Sur (Fifth District)
Representative: Miguel Luis R. Villafuerte · bills and roles · official House profile
Served by: Camarines Sur 5th DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
3 of 3 lines selected.
Camarines Sur 5th DEO
- House version (HB 10858)
- ₱528.2M
- 26 lines
- President’s NEP
- ₱429.5M
- 23 lines
- Added by the House
- 3
- ₱98.7M
- Changed / removed
- 0 / 0
- 23 lines unchanged
Lines that differ from the NEP (3)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Concrete Bridge, Zone Mississippi, Barangay Sagrada, Iriga City, Camarines Sur | Added by the House | — | ₱40,025,000 | HB p. 555 |
| Construction of Concrete Bridge, Zone Montañoza, Barangay Sagrada, Iriga City, Camarines Sur | Added by the House | — | ₱38,054,000 | HB p. 555 |
| Road Concreting of J. Mrtinez Highway, San Rafael, Iriga City. | Added by the House | — | ₱20,602,000 | HB p. 555 |
Past DPWH contracts under this office
891 contracts from 2016 to 2025 in public DPWH records (₱19.36B): 809 recorded as completed, 66 as ongoing. 817 have a satellite image check on file. Browse them.
12 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Mitigation Structure along Barit River, Brgy. Antipolo Old Section, Nabua, Camarines Sur 23FN0051 · Completed · ₱98.9MAwards Very Close to the Budget Ceiling; Duplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Mitigation Structure along Barit River, Antipolo Old Section, Barangay Antipolo, Nabua, Camarines Sur 24FN0008 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Bank Protection Structure along Pawili River, Brgy. Fabrica-Salvacion Section, Bula, Camarines Sur 23FN0033 · Completed · ₱77.1MDuplicate or Near-Duplicate Projects
- Construction of Bank Protection Structure along Pawili River, Brgy. Fabrica Section, Bula, Camarines Sur 23FN0024 · Completed · ₱72.3MDuplicate or Near-Duplicate Projects
- Construction of Riverbank Protection Structure along Barit River, Barangay Lourdes Section, Buhi, Camarines Sur 24FN0013 · Completed · ₱139.9MAwards Very Close to the Budget Ceiling · satellite before / after
- Construction of Flood Control Structure along Bicol River, Barangay Ombao Heights Section, Bula, Camarines Sur 24FN0002 · Completed · ₱139.9MAwards Very Close to the Budget Ceiling · satellite before / after
- Construction of Flood Mitigation Structure along Barit River, Brgy. Francia, Iriga City, Camarines Sur 23FN0050 · Completed · ₱99.0MAwards Very Close to the Budget Ceiling · satellite before / after
- Construction of Bank Protection Structure along Pawili River, Salvacion Section, Bula, Camarines Sur 23FN0056 · Completed · ₱96.5MAwards Very Close to the Budget Ceiling · satellite before / after
- Construction of Flood Control along Cagas Bridge (Downstream Section), Nabua, Camarines Sur 23FN0008 · Completed · ₱96.4MAwards Very Close to the Budget Ceiling · satellite before / after
- Construction of Bank Protection Structure, Brgy. Jose Baybayon-Monte Calvario, Buhi, Camarines Sur 23FN0007 · Completed · ₱77.2MAwards Very Close to the Budget Ceiling
- Construction of River Slope Protection along Bicol River, Barangay Ombao Polpog, Bula, Camarines Sur 22FN0042 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of River Slope Protection along Bicol River, Ombao Heights-Ombao Polpog, Bula, Camarines Sur 22FN0031 · Completed · ₱39.1MDuplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.