Hon. Jurdin Jesus M. Romualdo Representative, Camiguin (Lone District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Camiguin (Lone District) Dear Representative Jurdin Jesus M. Romualdo: Good day. I live in Camiguin (Lone District), and I would like to ask about some DPWH lines for the Camiguin DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Municipality of Mambajao, Province of Camiguin (Camiguin DEO): not in the NEP; ₱26,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office] 2. Construction of Multi-Purpose Building, Barangay Bacnit, Municipality of Sagay, Province of Camiguin (9.123363, 124.719285) (Camiguin DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office] 3. Construction of Multi-Purpose Building, Barangay Poblacion, Municipality of Catarman, Province of Camiguin (Camiguin DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office] 4. Construction (Completion) of Multi-Purpose Building, Barangay South Poblacion, Municipality of Guinsiliban, Province of Camiguin (Camiguin DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office] 5. Construction of Sitio Quiboro Road, Barangay Poblacion to Sitio Campana Road, Barangay Pandan, Municipality of Mambajao, Province of Camiguin (Camiguin DEO): not in the NEP; ₱12,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 601; no matching NEP line for this office] 6. Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Municipality of Catarman, Province of Camiguin (Camiguin DEO): not in the NEP; ₱7,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office] 7. Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Municipality of Sagay, Province of Camiguin (Camiguin DEO): not in the NEP; ₱7,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Camiguin DEO: 696 contracts (2016–2026) in public DPWH records; 565 recorded as completed and 111 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Tupsan River Control along Tupsan Bridge, K9+000 - K9+561 Bothsides, Mambajao, Camiguin (22KE0003): Cross-Source Mismatch (PhilGEPS vs DPWH). https://lovethephilippines.com/projects/20e560d1-4241-45c8-840a-b10c65f46f2d - Construction of River Control along Alangilan Box Culvert, Camiguin Circumferential Rd, Sagay, Camiguin (23KE0031): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/6b1cbb89-151b-458b-b1e5-842e710f0a09 - Construction of River Control along Alangilan Box Culvert, Camiguin Circumferential Road, Alangilan, Sagay, Camiguin (24KE0015): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/7bc8f3c3-5461-4b89-b018-b1bc12432b56 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/camiguin-lone
Write your representative · FY2027 budget
Camiguin (Lone District)
Representative: Jurdin Jesus M. Romualdo · bills and roles · official House profile
Served by: Camiguin DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
7 of 7 lines selected.
Camiguin DEO
- House version (HB 10858)
- ₱1.25B
- 63 lines
- President’s NEP
- ₱1.14B
- 56 lines
- Added by the House
- 7
- ₱112.0M
- Changed / removed
- 0 / 0
- 56 lines unchanged
Lines that differ from the NEP (7)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Municipality of Mambajao, Province of Camiguin | Added by the House | — | ₱26,000,000 | HB p. 868 |
| Construction of Multi-Purpose Building, Barangay Bacnit, Municipality of Sagay, Province of Camiguin (9.123363, 124.719285) | Added by the House | — | ₱20,000,000 | HB p. 868 |
| Construction of Multi-Purpose Building, Barangay Poblacion, Municipality of Catarman, Province of Camiguin | Added by the House | — | ₱20,000,000 | HB p. 868 |
| Construction (Completion) of Multi-Purpose Building, Barangay South Poblacion, Municipality of Guinsiliban, Province of Camiguin | Added by the House | — | ₱20,000,000 | HB p. 868 |
| Construction of Sitio Quiboro Road, Barangay Poblacion to Sitio Campana Road, Barangay Pandan, Municipality of Mambajao, Province of Camiguin | Added by the House | — | ₱12,000,000 | HB p. 601 |
| Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Municipality of Catarman, Province of Camiguin | Added by the House | — | ₱7,000,000 | HB p. 868 |
| Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Municipality of Sagay, Province of Camiguin | Added by the House | — | ₱7,000,000 | HB p. 868 |
Past DPWH contracts under this office
696 contracts from 2016 to 2026 in public DPWH records (₱10.98B): 565 recorded as completed, 111 as ongoing. 655 have a satellite image check on file. Browse them.
3 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Tupsan River Control along Tupsan Bridge, K9+000 - K9+561 Bothsides, Mambajao, Camiguin 22KE0003 · Completed · ₱49.0MCross-Source Mismatch (PhilGEPS vs DPWH)
- Construction of River Control along Alangilan Box Culvert, Camiguin Circumferential Rd, Sagay, Camiguin 23KE0031 · Completed · ₱46.9MDuplicate or Near-Duplicate Projects
- Construction of River Control along Alangilan Box Culvert, Camiguin Circumferential Road, Alangilan, Sagay, Camiguin 24KE0015 · Completed · ₱9.5MDuplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.
