← All districts

Write your representative · FY2027 budget

Camiguin (Lone District)

Representative: Jurdin Jesus M. Romualdo · bills and roles · official House profile

Served by: Camiguin DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

7 of 7 lines selected.

Hon. Jurdin Jesus M. Romualdo
Representative, Camiguin (Lone District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Camiguin (Lone District)

Dear Representative Jurdin Jesus M. Romualdo:

Good day. I live in Camiguin (Lone District), and I would like to ask about some DPWH lines for the Camiguin DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Municipality of Mambajao, Province of Camiguin (Camiguin DEO): not in the NEP; ₱26,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office]
2. Construction of Multi-Purpose Building, Barangay Bacnit, Municipality of Sagay, Province of Camiguin (9.123363, 124.719285) (Camiguin DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office]
3. Construction of Multi-Purpose Building, Barangay Poblacion, Municipality of Catarman, Province of Camiguin (Camiguin DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office]
4. Construction (Completion) of Multi-Purpose Building, Barangay South Poblacion, Municipality of Guinsiliban, Province of Camiguin (Camiguin DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office]
5. Construction of Sitio Quiboro Road, Barangay Poblacion to Sitio Campana Road, Barangay Pandan, Municipality of Mambajao, Province of Camiguin (Camiguin DEO): not in the NEP; ₱12,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 601; no matching NEP line for this office]
6. Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Municipality of Catarman, Province of Camiguin (Camiguin DEO): not in the NEP; ₱7,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office]
7. Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Municipality of Sagay, Province of Camiguin (Camiguin DEO): not in the NEP; ₱7,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 868; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Camiguin DEO: 696 contracts (2016–2026) in public DPWH records; 565 recorded as completed and 111 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Construction of Tupsan River Control along Tupsan Bridge, K9+000 - K9+561 Bothsides, Mambajao, Camiguin (22KE0003): Cross-Source Mismatch (PhilGEPS vs DPWH). https://lovethephilippines.com/projects/20e560d1-4241-45c8-840a-b10c65f46f2d
- Construction of River Control along Alangilan Box Culvert, Camiguin Circumferential Rd, Sagay, Camiguin (23KE0031): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/6b1cbb89-151b-458b-b1e5-842e710f0a09
- Construction of River Control along Alangilan Box Culvert, Camiguin Circumferential Road, Alangilan, Sagay, Camiguin (24KE0015): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/7bc8f3c3-5461-4b89-b018-b1bc12432b56

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/camiguin-lone

Camiguin DEO

House version (HB 10858)
₱1.25B
63 lines
President’s NEP
₱1.14B
56 lines
Added by the House
7
₱112.0M
Changed / removed
0 / 0
56 lines unchanged
Lines that differ from the NEP (7)
LineChangeNEPHouseSources
Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Municipality of Mambajao, Province of CamiguinAdded by the House—₱26,000,000HB p. 868
Construction of Multi-Purpose Building, Barangay Bacnit, Municipality of Sagay, Province of Camiguin (9.123363, 124.719285)Added by the House—₱20,000,000HB p. 868
Construction of Multi-Purpose Building, Barangay Poblacion, Municipality of Catarman, Province of CamiguinAdded by the House—₱20,000,000HB p. 868
Construction (Completion) of Multi-Purpose Building, Barangay South Poblacion, Municipality of Guinsiliban, Province of CamiguinAdded by the House—₱20,000,000HB p. 868
Construction of Sitio Quiboro Road, Barangay Poblacion to Sitio Campana Road, Barangay Pandan, Municipality of Mambajao, Province of CamiguinAdded by the House—₱12,000,000HB p. 601
Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Municipality of Catarman, Province of CamiguinAdded by the House—₱7,000,000HB p. 868
Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Municipality of Sagay, Province of CamiguinAdded by the House—₱7,000,000HB p. 868

Past DPWH contracts under this office

696 contracts from 2016 to 2026 in public DPWH records (₱10.98B): 565 recorded as completed, 111 as ongoing. 655 have a satellite image check on file. Browse them.

3 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.