Hon. Karen Hope F. Garcia Representative, Cebu (Third District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Cebu (Third District) Dear Representative Karen Hope F. Garcia: Good day. I live in Cebu (Third District), and I would like to ask about some DPWH lines for the Cebu 3rd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: (No differences were found between the NEP and the House version for this office.) For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Cebu 3rd DEO: 963 contracts (2016–2025) in public DPWH records; 903 recorded as completed and 38 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Mitigation Structure at Combado River, Barangay Singsing, Balamban, Cebu (24HF0003): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/3089badf-d1f5-4318-a838-8fde7de5a30a - Construction of Flood Mitigation Structure at Combado River, Sitio Combado, Barangay Cantuod, Balamban, Cebu (24HF0004): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/57bf2154-67cc-44cd-bac3-a5bbf3c9e102 - Construction of Flood Mitigation Structure at Combado River, Barangay Singsing, Balamban, Cebu (23HF0012): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/9a9862dd-9398-47fe-8664-a554852a8929 - Construction of Flood Mitigation Structure at Combado River, Sitio Combado, Barangay Cantuod, Balamban, Cebu (23HF0014): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/fd536e12-d1c7-40d3-90b5-1d2b3ea418bc - Construction of Flood Mitigation Structure at Sapangdaku River, Barangay Daanglungsod - Barangay Dumlog, Toledo City, Cebu (24HF0007): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/2d0e7065-cb16-45a9-ad63-564e9b7891d1 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/cebu-3rd
Write your representative · FY2027 budget
Cebu (Third District)
Representative: Karen Hope F. Garcia · bills and roles · official House profile
Served by: Cebu 3rd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
0 of 1 lines selected.
Letters for this district so far: 1 opened · 0 copied · 0 sent to email. Anonymous totals only; we store no names, emails or IP addresses.
Cebu 3rd DEO
- House version (HB 10858)
- ₱158.0M
- 14 lines
- President’s NEP
- ₱182.0M
- 15 lines
- Added by the House
- 0
- ₱0
- Changed / removed
- 0 / 1
- 14 lines unchanged
Every House line for this office matches the NEP line and amount.
NEP lines with no match in the House version (1)
- Toledo-Tabuelan-Sn Remigio Rd - K0055 + 398 - K0055 + 993 · ₱24,000,000 · NEP PDF p. 236
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
963 contracts from 2016 to 2025 in public DPWH records (₱17.40B): 903 recorded as completed, 38 as ongoing. 793 have a satellite image check on file. Browse them.
21 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Mitigation Structure at Combado River, Barangay Singsing, Balamban, Cebu 24HF0003 · Completed · ₱96.3MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Mitigation Structure at Combado River, Sitio Combado, Barangay Cantuod, Balamban, Cebu 24HF0004 · Completed · ₱96.2MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Mitigation Structure at Combado River, Barangay Singsing, Balamban, Cebu 23HF0012 · Completed · ₱67.2MDuplicate or Near-Duplicate Projects
- Construction of Flood Mitigation Structure at Combado River, Sitio Combado, Barangay Cantuod, Balamban, Cebu 23HF0014 · Completed · ₱66.9MDuplicate or Near-Duplicate Projects
- Construction of Flood Mitigation Structure at Sapangdaku River, Barangay Daanglungsod - Barangay Dumlog, Toledo City, Cebu 24HF0007 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Mitigation Structure at Sapangdaku River (Tributary Area), Barangay Juan Climaco Sr., Toledo City, Cebu 23HF0030 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Flood Mitigation Structure at Barangay Bakyawan, Sta. 0+000 - Sta. 0+412, Tuburan, Cebu 22HF0038 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Mitigation Structure at Langoyon River, Section 1: Sta. 0+362 - Sta. 0+602, Section 2: Sta. 2+320 - Sta. 2+520, Brgy. Mangga, Tuburan, Cebu 22HF0050 · Completed · ₱48.9MPattern Consistent with Contract Splitting
- Construction of Slope Protection Structure at Langoyon River, Barangay Poblacion 8, Upstream, Sta. 2 + 520 - Sta. 2 + 721, Tuburan, Cebu 22HF0095 · Completed · ₱48.9MPattern Consistent with Contract Splitting
- Construction of Shoreline Protection at Barangay Talavera along Toledo-Tabuelan-Sn Remigio Rd, Toledo City, Cebu 23HF0002 · Completed · ₱48.9MPattern Consistent with Contract Splitting
- Construction of Flood Mitigation Structure at Sapangdaku River (Tributary Area), Barangay Juan Climaco Sr., Toledo City, Cebu 24HF0005 · Completed · ₱48.9MPattern Consistent with Contract Splitting; Duplicate or Near-Duplicate Projects
- Construction of Flood Mitigation Structure at Mangoto River, Sta. 1+040 - Sta. 1+347, Brgy. Mangoto, Pinamungajan, Cebu 22HF0051 · Completed · ₱48.7MPattern Consistent with Contract Splitting
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.