Hon. Edwin L., M.D. Cruzado Representative, North Cotabato (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for North Cotabato (First District) Dear Representative Edwin L., M.D. Cruzado: Good day. I live in North Cotabato (First District), and I would like to ask about some DPWH lines for the Cotabato 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Road Concreting Barangay Lomopog, Midsayap, Cotabato (Cotabato 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 611; no matching NEP line for this office] 2. Construction of Road Concreting Barangay Upper Labas, Midsayap, Cotabato (Cotabato 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 611; no matching NEP line for this office] 3. Construction of Multi-Purpose Building (covered court) Barangay Ginatilan, Pikit, Cotabato (7.048695, 124.626431) (Cotabato 1st DEO): not in the NEP; ₱6,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 887; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Cotabato 1st DEO: 1,318 contracts (2016–2025) in public DPWH records; 1,257 recorded as completed and 55 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Revetment along Malasila River, Sta. 43+980 - Sta. 44+780 L/S, Barangay Sta. Filomina, Makilala, Cotabato (24MC0053): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/072b556a-1bfc-4092-941e-0cce983be0d1 - Construction of Flood Control Dike along Bulatukan River, Sta. 61+930 - Sta. 62+270 R/S, Barangay New Bulatukan, Makilala, Cotabato (24MC0034): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/9a0a41d4-e029-4217-bd80-b2f2d3e25cae - Construction of Revetment along Malasila River, Sta. 36+540 - Sta. 37+340 L/S, Barangay Dagupan, Makilala, Cotabato (24MC0050): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/6cb2a31b-22c0-4426-ae42-ec4985e3af23 - Construction of Flood Control Dike along Bulatukan River, Sta. 62+270 - Sta. 62+610 R/S, Barangay New Bulatukan, Makilala, Cotabato (24MC0035): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/e6360a67-5ef7-490c-b5e9-7665510b3524 - Construction of Revetment along Malasila River, Sta. 41+533 - Sta. 42 + 333 R/S, Barangay Sta. Filomina, Makilala, Cotabato (24MC0052): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/8052fb73-a786-4156-9552-d926ed2a381f I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/cotabato-1st
Write your representative · FY2027 budget
North Cotabato (First District)
Representative: Edwin L., M.D. Cruzado · bills and roles · official House profile
Served by: Cotabato 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
3 of 5 lines selected.
Letters for this district so far: 1 opened · 0 copied · 0 sent to email. Anonymous totals only; we store no names, emails or IP addresses.
Cotabato 1st DEO
- House version (HB 10858)
- ₱628.1M
- 56 lines
- President’s NEP
- ₱595.1M
- 52 lines
- Added by the House
- 4
- ₱32.0M
- Changed / removed
- 1 / 0
- 51 lines unchanged
Lines that differ from the NEP (5)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Road Concreting Barangay Lomopog, Midsayap, Cotabato | Added by the House | — | ₱10,000,000 | HB p. 611 |
| Construction of Road Concreting Barangay Upper Labas, Midsayap, Cotabato | Added by the House | — | ₱10,000,000 | HB p. 611 |
| Construction of Multi-Purpose Building (covered court) Barangay Ginatilan, Pikit, Cotabato (7.048695, 124.626431) | Added by the House | — | ₱6,000,000 | HB p. 887 |
| Construction of Multi-Purpose Building (Covered Court), Barangay Ladtingan, Pikit, CotabatoA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱6,000,000 | HB p. 888 |
| Construction of Multi-Purpose Building (covered court) Barangay Takepan, Pikit, CotabatoMatched to the NEP by a close title, not an exact one. | Increased | ₱6,000,000 | ₱7,000,000 | HB p. 887 NEP PDF p. 668 |
Past DPWH contracts under this office
1,318 contracts from 2016 to 2025 in public DPWH records (₱22.52B): 1,257 recorded as completed, 55 as ongoing. 1,217 have a satellite image check on file. Browse them.
6 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Revetment along Malasila River, Sta. 43+980 - Sta. 44+780 L/S, Barangay Sta. Filomina, Makilala, Cotabato 24MC0053 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Flood Control Dike along Bulatukan River, Sta. 61+930 - Sta. 62+270 R/S, Barangay New Bulatukan, Makilala, Cotabato 24MC0034 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Revetment along Malasila River, Sta. 36+540 - Sta. 37+340 L/S, Barangay Dagupan, Makilala, Cotabato 24MC0050 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Flood Control Dike along Bulatukan River, Sta. 62+270 - Sta. 62+610 R/S, Barangay New Bulatukan, Makilala, Cotabato 24MC0035 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Revetment along Malasila River, Sta. 41+533 - Sta. 42 + 333 R/S, Barangay Sta. Filomina, Makilala, Cotabato 24MC0052 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Flood Control Dike along Bulatukan River Sta. 63+370 - Sta. 63+710 L/S, Barangay Kisante, Makilala, Cotabato 24MC0032 · Completed · ₱48.8MPattern Consistent with Contract Splitting
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.
