← All districts

Write your representative · FY2027 budget

North Cotabato (Third District)

Representative: Ma. Alana Samantha Taliño Santos · bills and roles · official House profile

Served by: Cotabato 3rd DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 24 lines selected.

Hon. Ma. Alana Samantha Taliño Santos
Representative, North Cotabato (Third District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for North Cotabato (Third District)

Dear Representative Ma. Alana Samantha Taliño Santos:

Good day. I live in North Cotabato (Third District), and I would like to ask about some DPWH lines for the Cotabato 3rd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Construction of Multi-Purpose Building, USM Human Kinetics and Wellness Studies, Barangay Poblacion, Kabacan, Cotabato (Cotabato 3rd DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 890; no matching NEP line for this office]
2. Completion of Multi-Purpose Building (Covered Court) at Barangay Tambad, Carmen, Cotabato (Cotabato 3rd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 889; no matching NEP line for this office]
3. Construction of Multi-Purpose Building at Barangay Poblacion 1, Banisilan, Cotabato (Cotabato 3rd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 890; no matching NEP line for this office]
4. Construction of Multi-Purpose Building (Covered Court) at 7Th Field Artillery Battalion, Camp Lucero, Nasapian, Carmen, Cotabato (Cotabato 3rd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 890; no matching NEP line for this office]
5. Construction of Multi-Purpose Building (Covered Court) at Kanibong Elementary School, Barangay Kanibong, Tulunan, Cotabato (Cotabato 3rd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 890; no matching NEP line for this office]
6. Completion of Multi-Purpose Building (Covered Court) at Sangat Elementary School, Barangay Sangat, M'lang, Cotabato (Cotabato 3rd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 890; no matching NEP line for this office]
7. Construction of Multi-Purpose Building in Barangay Tonganon, Carmen, Cotabato (Cotabato 3rd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 890; no matching NEP line for this office]
8. Construction of Multi-Purpose Building (Covered Court) in Kibudtungan Elementary School, Barangay Kibudtungan, Carmen, Cotabato (Cotabato 3rd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 890; no matching NEP line for this office]
9. Construction of Multi-Purpose Building (Covered Court) in Malapag Elementary School, Barangay Malapag, Carmen, Cotabato (Cotabato 3rd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 890; no matching NEP line for this office]
10. Construction of Multi-Purpose Building (Covered Court) in Mainline Elementary School, Barangay Liliongan, Carmen, Cotabato (Cotabato 3rd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 890; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Cotabato 3rd DEO: 430 contracts (2020–2025) in public DPWH records; 369 recorded as completed and 41 as ongoing.

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/cotabato-3rd

Cotabato 3rd DEO

House version (HB 10858)
₱905.9M
73 lines
President’s NEP
₱784.9M
49 lines
Added by the House
24
₱121.0M
Changed / removed
0 / 0
49 lines unchanged
Lines that differ from the NEP (24)
LineChangeNEPHouseSources
Construction of Multi-Purpose Building, USM Human Kinetics and Wellness Studies, Barangay Poblacion, Kabacan, CotabatoAdded by the House—₱10,000,000HB p. 890
Completion of Multi-Purpose Building (Covered Court) at Barangay Tambad, Carmen, CotabatoAdded by the House—₱5,000,000HB p. 889
Construction of Multi-Purpose Building at Barangay Poblacion 1, Banisilan, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Multi-Purpose Building (Covered Court) at 7Th Field Artillery Battalion, Camp Lucero, Nasapian, Carmen, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Multi-Purpose Building (Covered Court) at Kanibong Elementary School, Barangay Kanibong, Tulunan, CotabatoAdded by the House—₱5,000,000HB p. 890
Completion of Multi-Purpose Building (Covered Court) at Sangat Elementary School, Barangay Sangat, M'lang, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Multi-Purpose Building in Barangay Tonganon, Carmen, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Multi-Purpose Building (Covered Court) in Kibudtungan Elementary School, Barangay Kibudtungan, Carmen, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Multi-Purpose Building (Covered Court) in Malapag Elementary School, Barangay Malapag, Carmen, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Multi-Purpose Building (Covered Court) in Mainline Elementary School, Barangay Liliongan, Carmen, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Multi-Purpose Building (Covered Court) in New Culasi Elementary School, Barangay New Culasi, M'lang, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Multi-Purpose Building (Covered Court) in Kanibong Elementary School, Barangay Kanibong, Tulunan, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Multi-Purpose Building in Barangay New Bugasong, Matalam, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Multi-Purpose Building (Covered Court) in Bannawag High School, Barangay Bannawag, Kabacan, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Covered Court at Bual Elementary School, Barangay Bual, Tulunan, CotabatoAdded by the House—₱5,000,000HB p. 890
Completion of Covered Court at Barangay Lower Malamote, Matalam, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Covered Court at Calunasan Elementary School, Barangay Calunasan, M’lang, CotabatoAdded by the House—₱5,000,000HB p. 890
Completion of Covered Court at Magallon Elementary School, Barangay Magallon, M’lang, CotabatoAdded by the House—₱5,000,000HB p. 890
Construction of Covered Court at Rancho Elementary School, Sitio Rancho, Wadya, Banisilan, CotabatoAdded by the House—₱5,000,000HB p. 890
Completion of Covered Court at Miracle, Poblacion, Kabacan, CotabatoAdded by the House—₱5,000,000HB p. 891
Construction of Covered Court, Camp Lucero, Nasapian, Carmen, CotabatoAdded by the House—₱5,000,000HB p. 891
Construction of Multi-Purpose Building at Barangay Bentangan, Carmen, CotabatoAdded by the House—₱5,000,000HB p. 891
Construction of Multi-Purpose Building at Barangay Paraiso, Tulunan, CotabatoAdded by the House—₱3,000,000HB p. 890
Completion of Multi-Purpose Building (Covered Court) at Barangay Salama, Banisilan, CotabatoAdded by the House—₱3,000,000HB p. 890

Past DPWH contracts under this office

430 contracts from 2020 to 2025 in public DPWH records (₱6.73B): 369 recorded as completed, 41 as ongoing. 420 have a satellite image check on file. Browse them.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.