Hon. Angelo Marcos Barba Representative, Ilocos Norte (Second District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Ilocos Norte (Second District) Dear Representative Angelo Marcos Barba: Good day. I live in Ilocos Norte (Second District), and I would like to ask about some DPWH lines for the Ilocos Norte 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Slope Protection Structures along Pagdanuman Waterways, Barangay Lacuben, Badoc Ilocos Norte (Ilocos Norte 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 324; no matching NEP line for this office] 2. Construction, Rehabilitation and Improvement of Multi-Purpose Building, Barangay 6, San Nicolas, Ilocos Norte (Ilocos Norte 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 667; no matching NEP line for this office] 3. Rehabilitation of Multi-Purpose Facilities of Ilocandia Cultural Center, Barangay Quiling, Batac City, Ilocos Norte (Ilocos Norte 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 667; no matching NEP line for this office] 4. Construction, Rehabilitation and Improvement of Multi-Purpose building, Barangay Garreta, Badoc, Ilocos Norte (Ilocos Norte 2nd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 667; no matching NEP line for this office] 5. Construction of Local Road Connecting Siitos 1, 2 & 3 along San Agustin St. Barangay San Lorenzo, San Nicolas, Ilocos Norte (Ilocos Norte 2nd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 456; no matching NEP line for this office] 6. Construction of Multi-Purpose Building, Barangay San Ildefonso, San Nicolas, Ilocos Norte (Ilocos Norte 2nd DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 667; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Ilocos Norte 2nd DEO: 1,282 contracts (2016–2025) in public DPWH records; 1,024 recorded as completed and 194 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Control Structure along Sinigpit Creek, Barangay Caray, Nueva Era, Ilocos Norte (22AB0085): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/8b127d72-599f-4825-bc7d-a108dde819b8 - Construction of Flood Control Structure along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 2, Nueva Era, Ilocos Norte (22AB0087): Duplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/32c60dd9-2ce9-4d3c-aa72-37d0613cb94f - Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Right Bank), Barangay Cabittauran, Sitio Caduyungan 2, Nueva Era, Ilocos Norte (22AB0093): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/e9500326-ab50-4b98-ad43-503440cfe7d7 - Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Left Bank), Barangay Sto. Nino, Sitio Nalibegan 1, Nueva Era, Ilocos Norte (22AB0090): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/7204a1f0-b34b-491a-9f52-9638d8af3993 - Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River, Barangay Caray, Sitio Lading 2, Nueva Era, Ilocos Norte (22AB0099): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/54bbfa8a-3789-4804-8d40-9c46fa4625f2 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/ilocos-norte-2nd
Write your representative · FY2027 budget
Ilocos Norte (Second District)
Representative: Angelo Marcos Barba · bills and roles · official House profile
Served by: Ilocos Norte 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
6 of 7 lines selected.
Ilocos Norte 2nd DEO
- House version (HB 10858)
- ₱767.0M
- 48 lines
- President’s NEP
- ₱592.0M
- 43 lines
- Added by the House
- 6
- ₱180.0M
- Changed / removed
- 0 / 1
- 42 lines unchanged
Lines that differ from the NEP (6)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Slope Protection Structures along Pagdanuman Waterways, Barangay Lacuben, Badoc Ilocos Norte | Added by the House | — | ₱50,000,000 | HB p. 324 |
| Construction, Rehabilitation and Improvement of Multi-Purpose Building, Barangay 6, San Nicolas, Ilocos Norte | Added by the House | — | ₱50,000,000 | HB p. 667 |
| Rehabilitation of Multi-Purpose Facilities of Ilocandia Cultural Center, Barangay Quiling, Batac City, Ilocos Norte | Added by the House | — | ₱50,000,000 | HB p. 667 |
| Construction, Rehabilitation and Improvement of Multi-Purpose building, Barangay Garreta, Badoc, Ilocos Norte | Added by the House | — | ₱20,000,000 | HB p. 667 |
| Construction of Local Road Connecting Siitos 1, 2 & 3 along San Agustin St. Barangay San Lorenzo, San Nicolas, Ilocos Norte | Added by the House | — | ₱5,000,000 | HB p. 456 |
| Construction of Multi-Purpose Building, Barangay San Ildefonso, San Nicolas, Ilocos Norte | Added by the House | — | ₱5,000,000 | HB p. 667 |
NEP lines with no match in the House version (1)
- Construction of Multi-Purpose Building Barangay Hall (Completion ), Barangay San Lorenzo, San Nicolas, Ilocos Norte · ₱5,000,000 · NEP PDF p. 576
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,282 contracts from 2016 to 2025 in public DPWH records (₱15.89B): 1,024 recorded as completed, 194 as ongoing. 1,244 have a satellite image check on file. Browse them.
15 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Control Structure along Sinigpit Creek, Barangay Caray, Nueva Era, Ilocos Norte 22AB0085 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 2, Nueva Era, Ilocos Norte 22AB0087 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Right Bank), Barangay Cabittauran, Sitio Caduyungan 2, Nueva Era, Ilocos Norte 22AB0093 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Left Bank), Barangay Sto. Nino, Sitio Nalibegan 1, Nueva Era, Ilocos Norte 22AB0090 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River, Barangay Caray, Sitio Lading 2, Nueva Era, Ilocos Norte 22AB0099 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River, Barangay Caray, Sitio Lading 1, Nueva Era, Ilocos Norte 22AB0098 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Left Bank), Barangay Cabittauran, Sitio Baetan 1, Nueva Era, Ilocos Norte 22AB0088 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Right Bank), Barangay Sto. Niño, Sitio Nalibegan 2, Nueva Era, Ilocos Norte 22AB0094 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Left Bank), Barangay Sto. Nino, Sitio Tengnga, Nueva Era, Ilocos Norte 22AB0091 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River (Left Bank), Barangay Cabittauran, Sitio Namalican 2, Nueva Era, Ilocos Norte 22AB0095 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River (Right Bank), Barangay Cabittauran, Sitio Namalican 1, Nueva Era, Ilocos Norte 22AB0097 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Left Bank), Barangay Cabittauran, Sitio Caduyungan 1, Nueva Era, Ilocos Norte 22AB0089 · Completed · ₱49.0MPattern Consistent with Contract Splitting
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.