← All districts

Write your representative · FY2027 budget

Iloilo City (Lone District)

Representative: Julienne "Jam" L. Baronda · bills and roles · official House profile

Served by: Iloilo City DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 11 lines selected.

Hon. Julienne "Jam" L. Baronda
Representative, Iloilo City (Lone District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Iloilo City (Lone District)

Dear Representative Julienne "Jam" L. Baronda:

Good day. I live in Iloilo City (Lone District), and I would like to ask about some DPWH lines for the Iloilo City DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Construction of Multi-Purpose Building, Barangay Q. Abeto, Mandurriao, Iloilo City (Iloilo City DEO): not in the NEP; ₱48,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 821; no matching NEP line for this office]
2. Construction/Completion of Multi-Purpose Building/Evacuation Center, Mandurriao Elementary School, Iloilo City (Iloilo City DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 821; no matching NEP line for this office]
3. Completion of Multi-Purpose Building, Building 1, UPV, Barangay San Felix, City Proper, Iloilo City (Iloilo City DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 821; no matching NEP line for this office]
4. Construction/Rehabilitation of Multi-Purpose Building, Building 2, UPV, Barangay San Felix, Iloilo City (Iloilo City DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 821; no matching NEP line for this office]
5. Construction/Completion of Multi-Purpose Building, Barangay North Fundidor, Molo, Iloilo City (Iloilo City DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 821; no matching NEP line for this office]
6. Construction/Completion of Multi-Purpose Building, Bo. Obrero Evacuation Center, Barangay Bo. Obrero, Lapuz, Iloilo City (Iloilo City DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 821; no matching NEP line for this office]
7. Construction/Completion of Multi-Purpose Building/Evacuation Center, Sacred Heart, Barangay Hibao-an Sur, Mandurriao, Iloilo City (Iloilo City DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 821; no matching NEP line for this office]
8. Construction of Multi-Purpose Building, Barangay Nabitasan, La Paz, Iloilo City (Iloilo City DEO): not in the NEP; ₱12,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 821; no matching NEP line for this office]
9. Construction of Drainage along Barangay Maria Cristina, Jaro, Iloilo City (Iloilo City DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 346; no matching NEP line for this office]
10. Construction/Completion of Multi-Purpose Building, Ramon Avancena National High School, Barangay Yulo Drive, Arevalo, Iloilo City (Iloilo City DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 821; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Iloilo City DEO: 982 contracts (2016–2025) in public DPWH records; 823 recorded as completed and 140 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Rehabilitation of Iloilo Flood Control Project, Section 2, Jaro, Iloilo City, Iloilo (22GJ0063): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/e7062298-683c-44f0-a5f6-2e8a0a18edb5
- Rehabilitation of Iloilo Flood Control Project, Section 3, Iloilo City, Iloilo (22GJ0064): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/34cb5c92-ab90-4c37-bc6a-3f6db7b3ff4f

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/iloilo-city-lone

Iloilo City DEO

House version (HB 10858)
₱668.3M
37 lines
President’s NEP
₱463.3M
26 lines
Added by the House
11
₱205.0M
Changed / removed
0 / 0
26 lines unchanged
Lines that differ from the NEP (11)
LineChangeNEPHouseSources
Construction of Multi-Purpose Building, Barangay Q. Abeto, Mandurriao, Iloilo CityAdded by the House—₱48,000,000HB p. 821
Construction/Completion of Multi-Purpose Building/Evacuation Center, Mandurriao Elementary School, Iloilo CityAdded by the House—₱25,000,000HB p. 821
Completion of Multi-Purpose Building, Building 1, UPV, Barangay San Felix, City Proper, Iloilo CityAdded by the House—₱20,000,000HB p. 821
Construction/Rehabilitation of Multi-Purpose Building, Building 2, UPV, Barangay San Felix, Iloilo CityAdded by the House—₱20,000,000HB p. 821
Construction/Completion of Multi-Purpose Building, Barangay North Fundidor, Molo, Iloilo CityAdded by the House—₱20,000,000HB p. 821
Construction/Completion of Multi-Purpose Building, Bo. Obrero Evacuation Center, Barangay Bo. Obrero, Lapuz, Iloilo CityAdded by the House—₱15,000,000HB p. 821
Construction/Completion of Multi-Purpose Building/Evacuation Center, Sacred Heart, Barangay Hibao-an Sur, Mandurriao, Iloilo CityAdded by the House—₱15,000,000HB p. 821
Construction of Multi-Purpose Building, Barangay Nabitasan, La Paz, Iloilo CityAdded by the House—₱12,000,000HB p. 821
Construction of Drainage along Barangay Maria Cristina, Jaro, Iloilo CityAdded by the House—₱10,000,000HB p. 346
Construction/Completion of Multi-Purpose Building, Ramon Avancena National High School, Barangay Yulo Drive, Arevalo, Iloilo CityAdded by the House—₱10,000,000HB p. 821
Construction/Completion of Multi-Purpose Building, PNP Camp Delgado, Iloilo CityAdded by the House—₱10,000,000HB p. 821

Past DPWH contracts under this office

982 contracts from 2016 to 2025 in public DPWH records (₱13.11B): 823 recorded as completed, 140 as ongoing. 903 have a satellite image check on file. Browse them.

2 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.