Hon. Dante S. Garcia Representative, La Union (Second District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for La Union (Second District) Dear Representative Dante S. Garcia: Good day. I live in La Union (Second District), and I would like to ask about some DPWH lines for the La Union 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Flood Control Structures along Aringay River Basin, Barangay Sta Cecilia, Aringay, La Union (La Union 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 324; no matching NEP line for this office] 2. Construction of Flood Control Structures along Aringay River Basin, Barangay San Antonio, Aringay, La Union (La Union 2nd DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 324; no matching NEP line for this office] 3. Construction of Local Access Road, Barangay Macalva Norte - Sta. Ana, Agoo, La Union (La Union 2nd DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 458; no matching NEP line for this office] 4. Rehabilitation of Multi-Purpose Building, La Union Medical Center Compound, Barangay Nazareno, Agoo, La Union (La Union 2nd DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 671; no matching NEP line for this office] 5. Construction of Local Access Road at Sitio Bitag, Manga, Aringay, La Union (La Union 2nd DEO): not in the NEP; ₱22,500,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 458; no matching NEP line for this office] 6. Rehabilitation of Multi-Purpose Building, Tubao, La Union (La Union 2nd DEO): not in the NEP; ₱18,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 670; no matching NEP line for this office] 7. Construction of Multi-Purpose Building, Sto. Tomas, La Union (16.284247, 120.390526) (La Union 2nd DEO): not in the NEP; ₱16,400,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 671; no matching NEP line for this office] 8. Rehabilitation of Multi purpose Building, La Union Medical Center Compound, Barangay Nazareno, Agoo, La Union (16.346301, 120.363392) (La Union 2nd DEO): not in the NEP; ₱14,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 670; no matching NEP line for this office] 9. Rehabilitation of Multi-Purpose Building, Agoo, La Union (16.323494, 120.3665) (La Union 2nd DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 671; no matching NEP line for this office] 10. Rehabilitation of Multi-Purpose Building, Aringay, La Union (16.396112, 120.354195) (La Union 2nd DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 671; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - La Union 2nd DEO: 1,035 contracts (2016–2025) in public DPWH records; 905 recorded as completed and 78 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Control Structure, Barangay San Fermin, Caba, La Union (24AF0043): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/9ef99aca-fa39-4f3c-9eb0-f3fda626cb6e - Construction of Flood Control Structure, Phase 2, Barangay San Jose, Caba, La Union (24AF0041): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/4df3e953-25c3-4629-9250-d1ccf0f70800 - Construction of Flood Control Structure, Barangay Gana, Caba, La Union (24AF0040): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/76781738-9c33-471c-b368-302ad4caac43 - Construction of Flood Control Structure, Barangay Liquicia, Caba, La Union (24AF0042): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/bf5f0a69-b835-4f7b-b9e0-c5fbcb00f782 - Construction of Flood Control Structure along Aringay River Basin, Barangay Linapew, Tubao, La Union (24AF0018): Awards Very Close to the Budget Ceiling; Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/3c716960-a85f-4674-ba61-91f9636fedc1 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/la-union-2nd
Write your representative · FY2027 budget
La Union (Second District)
Representative: Dante S. Garcia · bills and roles · official House profile
Served by: La Union 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 22 lines selected.
La Union 2nd DEO
- House version (HB 10858)
- ₱1.32B
- 96 lines
- President’s NEP
- ₱1.01B
- 74 lines
- Added by the House
- 22
- ₱306.9M
- Changed / removed
- 0 / 0
- 74 lines unchanged
Lines that differ from the NEP (22)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Flood Control Structures along Aringay River Basin, Barangay Sta Cecilia, Aringay, La Union | Added by the House | — | ₱50,000,000 | HB p. 324 |
| Construction of Flood Control Structures along Aringay River Basin, Barangay San Antonio, Aringay, La Union | Added by the House | — | ₱40,000,000 | HB p. 324 |
| Construction of Local Access Road, Barangay Macalva Norte - Sta. Ana, Agoo, La Union | Added by the House | — | ₱25,000,000 | HB p. 458 |
| Rehabilitation of Multi-Purpose Building, La Union Medical Center Compound, Barangay Nazareno, Agoo, La Union | Added by the House | — | ₱25,000,000 | HB p. 671 |
| Construction of Local Access Road at Sitio Bitag, Manga, Aringay, La Union | Added by the House | — | ₱22,500,000 | HB p. 458 |
| Rehabilitation of Multi-Purpose Building, Tubao, La Union | Added by the House | — | ₱18,000,000 | HB p. 670 |
| Construction of Multi-Purpose Building, Sto. Tomas, La Union (16.284247, 120.390526) | Added by the House | — | ₱16,400,000 | HB p. 671 |
| Rehabilitation of Multi purpose Building, La Union Medical Center Compound, Barangay Nazareno, Agoo, La Union (16.346301, 120.363392) | Added by the House | — | ₱14,000,000 | HB p. 670 |
| Rehabilitation of Multi-Purpose Building, Agoo, La Union (16.323494, 120.3665) | Added by the House | — | ₱10,000,000 | HB p. 671 |
| Rehabilitation of Multi-Purpose Building, Aringay, La Union (16.396112, 120.354195) | Added by the House | — | ₱10,000,000 | HB p. 671 |
| Construction of Public Buildings/Facilities, Multi-Purpose Building, Naguilian, La Union | Added by the House | — | ₱10,000,000 | HB p. 671 |
| Construction of Road, Leones East, Tubao, La Union, Start 16.366647, 120.394362 End 16.360963, 120.397541 | Added by the House | — | ₱6,000,000 | HB p. 458 |
| Construction of Multi-Purpose Building Barangay Cabaritan Norte, Naguilian, La Union | Added by the House | — | ₱6,000,000 | HB p. 670 |
| Construction of Multi-Purpose Building, Barangay Gusing Norte, Naguilian, La Union (16.56172, 120.403847) | Added by the House | — | ₱6,000,000 | HB p. 670 |
| Construction of Multi-Purpose Building, Barangay Balecbec, Naguilian, La Union | Added by the House | — | ₱6,000,000 | HB p. 670 |
| Construction of Multi-Purpose Building, Barangay Angin, Naguilian, La Union | Added by the House | — | ₱6,000,000 | HB p. 670 |
| Construction of Multi-Purpose Building, Barangay Aguioas, Naguilian, La Union | Added by the House | — | ₱6,000,000 | HB p. 670 |
| Construction of Multi-Purpose Building, Barangay Bimmotobot, Naguilian, La Union | Added by the House | — | ₱6,000,000 | HB p. 670 |
| Construction of Multi-Purpose Building, Barangay Mamat-ing Norte, Naguilian, La Union | Added by the House | — | ₱6,000,000 | HB p. 671 |
| Construction of Multi-Purpose Building, Barangay Imelda, Naguilian, La Union | Added by the House | — | ₱6,000,000 | HB p. 671 |
| Construction of Multi-Purpose Building, Barangay Mamat-ing Sur, Naguilian, La Union | Added by the House | — | ₱6,000,000 | HB p. 671 |
| Construction of Multi-Purpose Building, Barangay San Isidro, Naguilian, La Union | Added by the House | — | ₱6,000,000 | HB p. 671 |
Past DPWH contracts under this office
1,035 contracts from 2016 to 2025 in public DPWH records (₱20.09B): 905 recorded as completed, 78 as ongoing. 953 have a satellite image check on file. Browse them.
48 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Control Structure, Barangay San Fermin, Caba, La Union 24AF0043 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Phase 2, Barangay San Jose, Caba, La Union 24AF0041 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Barangay Gana, Caba, La Union 24AF0040 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Barangay Liquicia, Caba, La Union 24AF0042 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure along Aringay River Basin, Barangay Linapew, Tubao, La Union 24AF0018 · Completed · ₱49.0MAwards Very Close to the Budget Ceiling; Pattern Consistent with Contract Splitting
- Construction of Flood Control Structure along Aringay River Basin, Barangay Sta. Teresa, Tubao, La Union 24AF0048 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure along Aringay River Basin, Barangay Pideg, Tubao, La Union 24AF0013 · Completed · ₱48.9MPattern Consistent with Contract Splitting; Awards Very Close to the Budget Ceiling
- Construction of Flood Control Structure along Aringay River Basin, Tubao, La Union (Package 8) 24AF0012 · Completed · ₱48.9MPattern Consistent with Contract Splitting; Awards Very Close to the Budget Ceiling
- Construction of Flood Control Structures along Bauang River Basin, Barangay Cabaritan Sur, Naguilian, La Union 24AF0014 · Completed · ₱48.7MPattern Consistent with Contract Splitting; Duplicate or Near-Duplicate Projects
- Construction of Flood Control Structures along Bauang River Basin, Barangay Bato, Naguilian, La Union 24AF0016 · Completed · ₱48.7MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure along Bauang River Basin, Barangay Dalacdac, Burgos, La Union 24AF0015 · Completed · ₱48.3MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Phase 1, Barangay San Jose, Caba, La Union 24AF0104 · Completed · ₱48.2MPattern Consistent with Contract Splitting
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.
