← All districts

Write your representative · FY2027 budget

Lapu-Lapu City (Opon) (Lone District)

Representative: Junard "Ahong" Q. Chan · bills and roles · official House profile

Served by: Cebu 6th DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 31 lines selected.

Hon. Junard "Ahong" Q. Chan
Representative, Lapu-Lapu City (Opon) (Lone District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Lapu-Lapu City (Opon) (Lone District)

Dear Representative Junard "Ahong" Q. Chan:

Good day. I live in Lapu-Lapu City (Opon) (Lone District), and I would like to ask about some DPWH lines for the Cebu 6th DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Construction of Bridge, Barangay Cansaga-Lamac, Consolacion, Cebu (Cebu 6th DEO): NEP ₱30,000,000 → House ₱90,000,000 (up ₱60,000,000). [HB 10858 (3rd Reading) Vol. I-C, p. 579; NEP FY2027 Vol. II-B, PDF p. 537]
2. Construction of Multi-Purpose Building, Barangay Cubacub, Mandaue City, Cebu (10.36996, 123.94008) (Cebu 6th DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 843; no matching NEP line for this office]
3. Construction of Multi-Purpose Building at Cordova Public College, Barangay Gabi, Cordova, Cebu (Cebu 6th DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 843; no matching NEP line for this office]
4. Construction of Seawall Protection Structure at Barangay Talima, Olango Island, Lapu- Lapu City, Cebu (Cebu 6th DEO): NEP ₱20,000,000 → House ₱40,000,000 (up ₱20,000,000). [HB 10858 (3rd Reading) Vol. I-C, p. 348; NEP FY2027 Vol. II-B, PDF p. 388]
5. Construction of Causeway, Barangay Tungasan, Olango Island, Lapu-LapuCity, Cebu (Cebu 6th DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 348; no matching NEP line for this office]
6. Construction of Road with Drainage V. Albano St., Barangay Maguikay, Mandaue City, Cebu (Cebu 6th DEO): not in the NEP; ₱15,620,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 580; no matching NEP line for this office]
7. Construction of Bridge, Barangay Tilhaong, Consolacion, Cebu (Cebu 6th DEO): NEP ₱15,000,000 → House ₱30,000,000 (up ₱15,000,000). [HB 10858 (3rd Reading) Vol. I-C, p. 579; NEP FY2027 Vol. II-B, PDF p. 537]
8. Rehabilitation of Multi-Purpose Building, Barangay Centro, Mandaue City, Cebu (10.324020, 123.941864) (Cebu 6th DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 844; no matching NEP line for this office]
9. Rehabilitation of Multi-Purpose Facility, Mandaue City, Cebu (10.327216, 123.941440) (Cebu 6th DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 844; no matching NEP line for this office]
10. Rehabilitation of Multi-Purpose Building at Barangay Gabi, Cordova, Cebu (Cebu 6th DEO): not in the NEP; ₱7,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 843; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Cebu 6th DEO: 1,112 contracts (2016–2025) in public DPWH records; 942 recorded as completed and 139 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Construction of Flood Control Structure along Cansaga River, Barangay Polog, Phase II, Consolacion, Cebu (23HN0093): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/1a0c46ab-e26a-488c-84b9-5d2fda75b84f
- Construction of Flood Control Structure along Cansaga River, Barangay Danglag to Barangay Polog, Consolacion, Cebu (23HN0092): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/2cd4c30e-c9fb-4196-9fb6-0ca566eea208
- Construction of Flood Control Structure along Cansaga River, Barangay Danglag, Consolacion, Cebu (22HN0001): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/3af43d38-07fd-4f47-a1e3-39a560a18704
- Construction of Flood Control Structure along Basak Creek, Mandaue City, Cebu, Phase II (23HN0114): Awards Very Close to the Budget Ceiling; Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/b4096948-f4b4-471a-81bc-bb488b3f941f
- Construction of Flood Control Structure along Cansaga River, Barangay Garing, Phase 3, Consolacion, Cebu (24HN0024): Duplicate or Near-Duplicate Projects; Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/c6b449de-b8f4-4e7c-8e93-c6cdfa64d823

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/lapu-lapu-city-lone

Cebu 6th DEO

This district engineering office also serves Mandaue City (Lone District); Cebu (Sixth District). The budget lines below belong to the office, not to one district.

House version (HB 10858)
₱1.32B
63 lines
President’s NEP
₱1.48B
65 lines
Added by the House
13
₱155.8M
Changed / removed
3 / 15
47 lines unchanged
Lines that differ from the NEP (16)
LineChangeNEPHouseSources
Construction of Bridge, Barangay Cansaga-Lamac, Consolacion, CebuIncreased₱30,000,000₱90,000,000HB p. 579
NEP PDF p. 537
Construction of Multi-Purpose Building, Barangay Cubacub, Mandaue City, Cebu (10.36996, 123.94008)Added by the House—₱30,000,000HB p. 843
Construction of Multi-Purpose Building at Cordova Public College, Barangay Gabi, Cordova, CebuAdded by the House—₱30,000,000HB p. 843
Construction of Seawall Protection Structure at Barangay Talima, Olango Island, Lapu- Lapu City, CebuIncreased₱20,000,000₱40,000,000HB p. 348
NEP PDF p. 388
Construction of Causeway, Barangay Tungasan, Olango Island, Lapu-LapuCity, CebuAdded by the House—₱20,000,000HB p. 348
Construction of Road with Drainage V. Albano St., Barangay Maguikay, Mandaue City, CebuAdded by the House—₱15,620,000HB p. 580
Construction of Bridge, Barangay Tilhaong, Consolacion, CebuIncreased₱15,000,000₱30,000,000HB p. 579
NEP PDF p. 537
Rehabilitation of Multi-Purpose Building, Barangay Centro, Mandaue City, Cebu (10.324020, 123.941864)Added by the House—₱15,000,000HB p. 844
Rehabilitation of Multi-Purpose Facility, Mandaue City, Cebu (10.327216, 123.941440)Added by the House—₱10,000,000HB p. 844
Rehabilitation of Multi-Purpose Building at Barangay Gabi, Cordova, CebuAdded by the House—₱7,000,000HB p. 843
Construction of Road with Drainage along R. Colina Ext Street, Sitio Abbrai to Sitio Liong, Barangay Alang-Alang, Mandaue City, Cebu Sta. 0+256.00 to Sta. 0+538.00Added by the House—₱6,400,000HB p. 579
Construction of Road with Drainage, Barangay Cabancalan, Mandaue City, Cebu - Sta. 0+000.00 - Sta. 0+450.00Added by the House—₱5,625,000HB p. 579
Construction of Road with Drainage T. Cabahug St., Barangay Casuntingan, Mandaue City, CebuAdded by the House—₱5,180,000HB p. 579
Concreting of Road of Sitio Lomboy, Day-as, Cordova , Cebu, 10.25459261, 123.93997786Added by the House—₱5,000,000HB p. 579
Rehabilitation (Completion) of Consolacion Multi-Purpose Building, Consolacion, CebuAdded by the House—₱3,000,000HB p. 843
Construction (Completion) of Multi-Purpose Building at Barangay Buagsong, Cordova, CebuAdded by the House—₱3,000,000HB p. 843
NEP lines with no match in the House version (15)
  • Construction of Seawall Protection at Barangay Caubuan, Caubian Island, Lapu-Lapu City, Cebu · ₱50,000,000 · NEP PDF p. 388
  • Construction of Basak-Agus Road including Drainage Structure, Lapu-Lapu City, Cebu · ₱50,000,000 · NEP PDF p. 537
  • Rehabilitation of Drainage at Brgy. Basak, Lapu-Lapu City Cebu · ₱50,000,000 · NEP PDF p. 537
  • Improvement of Road with Drainage Facilities at General Aviation Road, Lapu-Lapu City, Cebu · ₱40,000,000 · NEP PDF p. 537
  • Rehabilitation of Road with Drainage Facilities at General Aviation Road at Barangay Basak, Lapu-Lapu City, Cebu · ₱40,000,000 · NEP PDF p. 537
  • Construction of Causeway at Barangay Caw-oy, Olango Island, Lapu-Lapu City, Cebu · ₱36,000,000 · NEP PDF p. 559
  • Construction of Bridge (Diversion Road-Sm ), Lamac, Consolacion, Cebu · ₱30,000,000 · NEP PDF p. 537
  • Construction of Bridge, Barangay Cansaga-Lamac, Consolacion, Cebu (10.381419, 123.962916) · ₱30,000,000 · NEP PDF p. 537
  • Construction of Seawall Protection Structure at Sitio Candagsao, Barangay Talima, Olango Island, Lapu-Lapu City, Cebu · ₱20,000,000 · NEP PDF p. 388
  • Construction of Seawall Protection Structure, Candagsao, Olango Island, Lapu-Lapu City, Cebu · ₱20,000,000 · NEP PDF p. 388
  • Construction of Bridge, Barangay Tilhaong, Consolacion, Cebu (10.392796, 123.961628) · ₱15,000,000 · NEP PDF p. 537
  • Construction of Road with Drainage at Barangay Tawason, Mandaue City, Sta 0 + 000.00 - Sta 0 + 450.00 · ₱13,875,000 · NEP PDF p. 537
  • Construction of Road with Drainage at Barangay Tawason, Mandaue City - Sta. 0 + 000.00 - Sta.0 + 475.00 · ₱8,700,000 · NEP PDF p. 537
  • Construction of drainage at BJMP Compound, Barangay Basak, Mandaue City Cebu · ₱6,000,000 · NEP PDF p. 388
  • Construction of Drainage at Barangay Tawason, Mandaue City - Sta. 0 + 000.00 - Sta. 0 + 340.00 · ₱4,250,000 · NEP PDF p. 388

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

1,112 contracts from 2016 to 2025 in public DPWH records (₱25.89B): 942 recorded as completed, 139 as ongoing. 1,038 have a satellite image check on file. Browse them.

18 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.